




已閱讀5頁(yè),還剩7頁(yè)未讀, 繼續(xù)免費(fèi)閱讀
版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the five water treatment 357 timetables for three years to resolve outstanding issues, obviously worked, victory of the year. The Countys departments at all levels must firmly establish the guanghui is gold and silver green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well five water treatment of winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will river water quality improved at the county level, up to five this basic objective grasp of pollution control that focus, with the focus on three things: a good job, clear rivers reaching the County created. Organization look back special inspection, the County garbage River, black and odorous River is Dragnet investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the one-stop strategy, improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of clear rivers standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve effluent from sewage treatment rate, running accuracy, compliance requirement, speed up the towns support network construction, is focusing on nanotubes home last meters question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the Sun problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to dig up mud, as the deepening water of this years plays. Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policy requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud way out, according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of 石膏板吊頂施工方案 審批: 審核: 編制: 目 錄1、工程概況21.1、建筑概況21.2、編制依據(jù)21.3、施工范圍22、工期目標(biāo)23、 施工進(jìn)度計(jì)劃24、施工準(zhǔn)備及資源配置34.1、技術(shù)準(zhǔn)備34.2、勞動(dòng)力準(zhǔn)備34.3、施工機(jī)械設(shè)備準(zhǔn)備44.4、主要材料準(zhǔn)備44.5、作業(yè)條件45、施工方法及工藝要求45.1、工藝流程45.2、施工工藝要求45.3、質(zhì)量管理及控制措施65.4、安全環(huán)保措施86、 技術(shù)資料編制計(jì)劃9為了促進(jìn)本公司各項(xiàng)經(jīng)營(yíng)活動(dòng)由事后管理向事前管理方式的轉(zhuǎn)變,強(qiáng)化生產(chǎn)經(jīng)營(yíng)全過(guò)程控制,提高資金使用的計(jì)劃性,特制定本管理辦法,以增加公司資金運(yùn)行的透明度treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation three years action plans, requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project Trinity environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously implementation strong library solid di spread row engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play three to split battle. Xia Baolong, Secretary of provincial party Committee stressed that while the three to split operation time is over three years, but three to split must continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and no unauthorised created1、工程概況1.1、建筑概況1.2、編制依據(jù)依據(jù)以下國(guó)家規(guī)范、行業(yè)標(biāo)準(zhǔn)、相關(guān)文件、圖紙編制的:國(guó)家行業(yè)及有關(guān)技術(shù)和驗(yàn)收的標(biāo)準(zhǔn)、規(guī)范中華人民共和國(guó)建筑法建筑裝修裝飾工程質(zhì)量驗(yàn)收規(guī)范 (GB50210-2001)民用建筑工程室內(nèi)環(huán)境污染控制規(guī)范 (GB50325-2010)建筑內(nèi)部裝修設(shè)計(jì)防火規(guī)范 (GB50222-95)建筑施工安全檢查標(biāo)準(zhǔn) (JG59-2011)建筑工程施工質(zhì)量驗(yàn)收統(tǒng)一標(biāo)準(zhǔn) (GB50300-2013)以所提供施工圖紙、效果圖、設(shè)計(jì)變更及相應(yīng)的技術(shù)核定單作為依據(jù)。1.3、施工范圍2、工期目標(biāo)我們將充分利用我公司在生產(chǎn)經(jīng)營(yíng)、技術(shù)管理的各種優(yōu)勢(shì),使工程在管理、質(zhì)量、文明施工上均創(chuàng)出一流水平。本工程達(dá)到:工程合格率100%,爭(zhēng)取2015年5月25日竣工質(zhì)量目標(biāo):達(dá)到魯班獎(jiǎng)要求3、 施工進(jìn)度計(jì)劃附頁(yè)4、施工準(zhǔn)備及資源配置4.1、技術(shù)準(zhǔn)備項(xiàng)目技術(shù)負(fù)責(zé)人熟悉施工圖紙、圖紙會(huì)審記錄組織編制、報(bào)審施工方案,對(duì)現(xiàn)場(chǎng)施工管理人員進(jìn)行技術(shù)交底。4.2、勞動(dòng)力準(zhǔn)備根據(jù)工程的實(shí)際情況,施工選擇高素質(zhì)成建制的施工作業(yè)隊(duì)伍及有經(jīng)驗(yàn)的專業(yè)工種人員,分級(jí)簽訂勞務(wù)合同,施工前進(jìn)行入場(chǎng)教育。工種人員安排:序號(hào)工種名稱人數(shù)備注1、木工25302、電工123、雜工12合計(jì):27-344.3、施工機(jī)械設(shè)備準(zhǔn)備 型材切割機(jī)、電動(dòng)曲線鋸、手電鉆、電錘、自攻螺釘鉆、手提電動(dòng)砂紙機(jī)等。4.4、主要材料準(zhǔn)備4.4.1、石膏板:9.5mm厚紙面石膏板,材質(zhì)、規(guī)格及質(zhì)量性能指標(biāo)符合設(shè)計(jì)及規(guī)范要求4.4.2、龍骨:主龍骨為38*12*1.2的U型龍骨;次龍骨為50*19*0.5的U型龍骨。符合國(guó)標(biāo)建筑用輕鋼龍骨(GB11981-89);4.4.3、吊桿、膨脹螺栓、自攻螺釘、拉鉚釘、紙帶、石膏粉、白乳膠等需準(zhǔn)備材料的檢驗(yàn)報(bào)告、合格證、并且在材料到場(chǎng)當(dāng)天進(jìn)行現(xiàn)場(chǎng)取樣,及時(shí)報(bào)送實(shí)驗(yàn)室進(jìn)行材料復(fù)驗(yàn),經(jīng)復(fù)驗(yàn)合格,方可使用。4.5、作業(yè)條件4.5.1、在所要吊頂?shù)姆秶鷥?nèi),機(jī)電安裝均已施工完畢,各種管線均已試壓合格,已經(jīng)過(guò)隱蔽驗(yàn)收。4.5.2、已確定燈位、通風(fēng)口及各種照明孔口的位置。4.5.3、頂棚罩面板安裝前,應(yīng)作完墻、地濕作業(yè)工程項(xiàng)目。4.5.4、搭好頂棚施工操作平臺(tái)架子。4.5.5、輕鋼骨架頂棚在大面積施工前,應(yīng)做樣板,對(duì)頂棚的起拱度、燈槽、窗簾盒、通風(fēng)口等處進(jìn)行構(gòu)造處理,經(jīng)鑒定后再大面積施工。5、施工方法及工藝要求5.1、工藝流程彈頂棚標(biāo)高水平線畫龍骨分檔線安裝主龍骨吊桿安裝邊龍骨安裝主龍骨安裝次龍骨安裝石膏板接縫處理5.2、施工工藝要求a)、彈頂棚標(biāo)高水平線彈頂棚標(biāo)高水平線:根據(jù)設(shè)計(jì)標(biāo)高,沿墻四周彈頂棚標(biāo)高水平線,并沿頂棚的標(biāo)高水平線,在墻上畫好龍骨分擋位置線。b)、安裝主龍骨吊桿8吊桿U38主龍骨石膏板UC50次龍骨石膏板吊頂節(jié)點(diǎn)圖石膏板在彈好頂棚標(biāo)高水平線及龍骨位置線后,確定吊桿下端頭的標(biāo)高,安裝8吊桿。吊桿安裝選用膨脹螺栓固定到結(jié)構(gòu)頂棚上。吊桿選用規(guī)格符合設(shè)計(jì)要求,間距800mm。c)、安裝邊龍骨沿標(biāo)高線安裝,固定邊龍骨使用自攻螺絲,間距為200mm。接縫處間距為20mm。d)、安裝主龍骨主龍骨間距為800mm。主龍骨用與之配套的龍骨吊件與吊桿相連。一、二級(jí)吊頂部位的連接處使用75系列龍骨,并用邊龍骨做斜加固,相互間用鉚釘連接。陰、陽(yáng)角處鉚釘加固,并用邊龍骨做斜加固。e)、安裝次龍骨次龍骨間距為400mm,次龍骨與主龍骨、次龍骨之間、次龍骨與橫撐龍骨連接應(yīng)采用專用連接件連接,并保證連接牢固、緊密。上述工序經(jīng)自檢、互檢和專檢工程質(zhì)量合格后,及時(shí)辦理隱蔽工程驗(yàn)收。達(dá)到要求后才能進(jìn)行下道工序。f)、安裝石膏板石膏板與輕鋼骨架固定的方式采用自攻螺釘固定法,在已裝好并經(jīng)驗(yàn)收合格的輕鋼骨架上(即做隱蔽驗(yàn)收工作),安裝9.5mm厚石膏板基層,采用25自攻螺絲固定。安裝9.5mm石膏板面層時(shí),陰陽(yáng)角處用整板切割,面層板與基層板的接縫應(yīng)錯(cuò)開(kāi),不允許在同一根龍骨上接縫,采用35自攻螺絲固定。安裝時(shí)自攻螺釘與板邊距離應(yīng)為1015mm,螺釘間距150170mm為宜,均勻固定。釘頭嵌入板面深度以0.51mm為宜,板與板之間縫隙應(yīng)在左右,固定時(shí)應(yīng)從一塊板的中間向板的四邊固定,不得多點(diǎn)同時(shí)操作。自攻螺絲固定后點(diǎn)刷防銹漆。g)接縫處理:紙面石膏板安裝完畢后,自攻螺絲應(yīng)進(jìn)行防銹處理(防銹漆最好采用銀灰色),并用膩?zhàn)诱移?。紙面石膏板之間的接縫采用專用補(bǔ)縫膏填補(bǔ)(分三次進(jìn)行),要求填補(bǔ)密實(shí),平整,待補(bǔ)縫膏干燥后,粘貼專用貼縫帶。注意:檢修口、風(fēng)口等的加固采用木龍骨固定兩側(cè)。5.3、質(zhì)量管理及控制措施項(xiàng)目工長(zhǎng)認(rèn)真學(xué)習(xí)施工圖紙、相關(guān)技術(shù)標(biāo)準(zhǔn)、施工規(guī)范和操作規(guī)程。由項(xiàng)目工長(zhǎng)向勞務(wù)工長(zhǎng)技術(shù)交底,勞務(wù)工長(zhǎng)向班組長(zhǎng),班組長(zhǎng)對(duì)班組作業(yè)人員的交底。嚴(yán)格執(zhí)行施工中各工序的自檢、互檢、交接檢制度,對(duì)操作人員,實(shí)行定部位定人,層層把關(guān)。5.3.1、質(zhì)量要求質(zhì)量要求符合建筑裝飾裝修工程質(zhì)量驗(yàn)收規(guī)范(GB50210-2001)的規(guī)定。 主控項(xiàng)目吊頂標(biāo)高、尺寸、起拱和造型應(yīng)符合設(shè)計(jì)要求。 檢驗(yàn)方法:觀察;尺量檢查。飾面材料的材質(zhì)、品種、規(guī)格、圖案和顏色應(yīng)符合設(shè)計(jì)要求。 檢驗(yàn)方法:觀察;檢查產(chǎn)品合格證書(shū)、性能檢測(cè)報(bào)告、進(jìn)場(chǎng)驗(yàn)收記錄和復(fù)驗(yàn)報(bào)告。暗龍骨吊頂工程的吊桿、龍骨和飾面材料的安裝必須牢固。 檢驗(yàn)方法:觀察;手扳檢查;檢查隱蔽工程驗(yàn)收記錄和施工記錄。吊桿、龍骨的材、規(guī)格、安裝間距及連接方式應(yīng)符合設(shè)計(jì)要求。金屬吊桿、龍骨應(yīng)經(jīng)過(guò)表面防腐處理;木吊桿、龍骨應(yīng)進(jìn)行防腐、防火處理。 檢驗(yàn)方法:觀察;尺量檢查;檢查產(chǎn)品合格證書(shū)、性能檢測(cè)報(bào)告、進(jìn)場(chǎng)驗(yàn)收記錄和隱蔽工程驗(yàn)收記錄。石膏板的接縫應(yīng)按其施工工藝標(biāo)準(zhǔn)進(jìn)行板縫防裂處理。安裝雙層石膏板時(shí),面層板與基層板的接縫應(yīng)錯(cuò)開(kāi),并不得在同一根龍骨上接縫。 檢驗(yàn)方法:觀察。一般項(xiàng)目飾面材料表面應(yīng)潔凈、色澤一致,不得有翹曲、裂縫及缺損。壓條應(yīng)平直、寬窄一致。 檢驗(yàn)方法:觀察;尺量檢查。飾面板上的燈具、煙感器、噴淋頭、風(fēng)口篦子等設(shè)備的位置應(yīng)合理、美觀,與飾面板的交接應(yīng)吻合、嚴(yán)密。 檢驗(yàn)方法:觀察。金屬吊桿、龍骨的接縫應(yīng)均一致,角縫應(yīng)吻合,表面應(yīng)平整,無(wú)翹曲、錘印。木質(zhì)吊桿、龍滑應(yīng)順直,地劈裂、變形。吊頂內(nèi)填充吸聲材料的品種和鋪設(shè)厚度應(yīng)符合設(shè)計(jì)要求,并應(yīng)有防散落措施。 檢驗(yàn)方法:檢查隱蔽工程驗(yàn)收記錄和施工記錄。允許偏差項(xiàng)目允許偏差值(mm)表面平整度3接縫直線度3接縫高低差15.3.2、質(zhì)量保證措施a)、根據(jù)質(zhì)量保證體系,建立崗位責(zé)任制及質(zhì)量監(jiān)督制度,明確分工,落實(shí)施工質(zhì)量控制責(zé)任。b)、嚴(yán)格按工序質(zhì)量控制程序進(jìn)行施工,確保施工質(zhì)量。c)、施工過(guò)程中建立有效的質(zhì)量信息反饋、定期質(zhì)量檢查制度。5.3.3 質(zhì)量通病的預(yù)防與控制a) 、吊頂龍骨架不平整:墻面四周未彈標(biāo)高控制線;吊桿或吊筋間距過(guò)大、吊筋不垂直,使龍骨受力不均勻;主龍骨與主吊掛、副龍骨與主龍骨沒(méi)連接緊密;主龍骨不順直、龍骨接頭安裝不平;橫撐龍骨下料不對(duì),過(guò)大或過(guò)小、或橫撐龍骨截面切割產(chǎn)生的毛刺未處理平整。預(yù)防措施:施工前,根據(jù)設(shè)計(jì)標(biāo)高,將控制標(biāo)高線彈出,尺寸準(zhǔn)確;按規(guī)范要求,使主龍骨吊筋的間距控制在800mm之間,保證吊筋在一條直線上且每根均垂直;施工時(shí),保持主龍骨與主吊掛、副龍骨與主龍骨連接緊密,間隙控制在1mm以內(nèi);橫撐龍骨嚴(yán)格按副龍骨的間
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 防水行業(yè)面試題及答案
- 曲藝表演考試題及答案
- 文化繁榮面試題及答案
- 循環(huán)能力測(cè)試題及答案
- java字符串有關(guān)面試題及答案
- 烘焙師考試題庫(kù)及答案
- 煙廠模擬測(cè)試題及答案
- 考研藥學(xué)面試題及答案
- 金融行業(yè)面試題及答案
- 2025年刺繡機(jī)電控項(xiàng)目立項(xiàng)申請(qǐng)報(bào)告模范
- 2025屆中考化學(xué)預(yù)熱模擬卷 【吉林專用】
- 小學(xué)生籃球課課件下載
- 2025年中國(guó)AI智能鼠標(biāo)行業(yè)市場(chǎng)全景分析及前景機(jī)遇研判報(bào)告
- 2025年湖北省新華書(shū)店(集團(tuán))有限公司市(縣)分公司招聘筆試參考題庫(kù)含答案解析
- 2025至2030中國(guó)軍用推進(jìn)劑和炸藥行業(yè)產(chǎn)業(yè)運(yùn)行態(tài)勢(shì)及投資規(guī)劃深度研究報(bào)告
- EPC總承包管理實(shí)施方案
- 2025年數(shù)智供應(yīng)鏈案例集-商務(wù)部
- 2025年江蘇南京市河西新城區(qū)國(guó)有資產(chǎn)經(jīng)營(yíng)控股集團(tuán)招聘筆試參考題庫(kù)附帶答案詳解
- 跟著音樂(lè)游中國(guó)智慧樹(shù)知到期末考試答案章節(jié)答案2024年廣州大學(xué)
- 人工智能智慧樹(shù)知到期末考試答案章節(jié)答案2024年復(fù)旦大學(xué)
- 激光切割機(jī)日常保養(yǎng)表
評(píng)論
0/150
提交評(píng)論