1、g The schedule and detail commissioning items of Unit 1 first firing to PAC1號(hào)機(jī)組首次點(diǎn)火至 PAC時(shí)間表及詳細(xì)的調(diào)試項(xiàng)Day/Date天/日期Test試驗(yàn)Purpose of Test試驗(yàn)?zāi)康腡est activities 試驗(yàn)活動(dòng)Remarks 備注Day 1第1天11/08/2006Rotor runin:轉(zhuǎn)子試 轉(zhuǎn):Crank test搖轉(zhuǎn)試驗(yàn)1. Listen for rubs or unusual noises 聽(tīng)是否有摩擦和異常噪音2. Functional test of emergency trip

2、button緊急跳閘按鈕的功能試驗(yàn)3. Purge speed cranking for rotor vibration check以吹掃速度搖 轉(zhuǎn),檢查轉(zhuǎn)子振動(dòng)情況4. Monitor LCI starting temperatures and operation監(jiān)視器 LCI 起動(dòng)溫度和運(yùn)行5. Air blowing the purge piping of D5 and pM4 gas fuel duri ng crank搖轉(zhuǎn)期間給D5和PM4吹 掃管鼓風(fēng)6. Check operation of lift oil and turni ng gear檢查頂軸油和盤(pán)車(chē) 的運(yùn)行1. Roll

3、 up to 50 rpm trip by DCS emergency push butt on and 200 rpm and trip by GT MK 6 control emergency stop 通 過(guò)DCS緊急按鈕逐漸增加到50rpm,通過(guò)GT MK6控制緊急停機(jī) 跳閘2. Restart, accelerate to go to Purge speed for 5min and select no rmal stop 重起,加速到吹掃速度5分鐘,選擇正常停 止3. Restart, hold at purge speed and air blow ing the pip ing

4、 of D5 and PM4, trip by DCS customer trip (L4CT) after 30 Min crank test重起,保持在吹掃速 度,給D5和PM4管道鼓風(fēng),在30 分鐘搖轉(zhuǎn)試驗(yàn)后通過(guò)DCS客戶(hù)跳閘(L4CT)跳閘4. Verify coast down to turning gear 核實(shí) 惰行至盤(pán)車(chē)5. Monitor vibration levels through out the test period監(jiān)視整個(gè)試驗(yàn)期間的振動(dòng)級(jí) Use auto start-up seque nces to prepare theunit for a-ReSdart采用

5、自動(dòng)走動(dòng)順序?qū)C(jī)組準(zhǔn)備好“準(zhǔn)備起動(dòng)” Rub checks are performed檢查摩擦 ADRE vibration monitor to be connected 連接ADRE振動(dòng)監(jiān)視器After Shut-down 停機(jī)后 Rein state the pip ing spool of D5 and PM4 pipe work after shutdown 停機(jī)后重新恢 復(fù)D5和PM5管子的導(dǎo)管Day 1第1天11/08/2006Rotor runin:轉(zhuǎn)子試 轉(zhuǎn):False firing, actual first firing and FSNL 假點(diǎn)火, 實(shí)際第一 次點(diǎn)火和FS

6、NL1. False fire 假點(diǎn)火2. Actual First Fire to FSNL實(shí)際第一次點(diǎn)火至 FSNL1. Select fire for false fire and check un it for gas leaks, and P2 pr. Check 選擇假點(diǎn)火的火,檢查機(jī)組是否漏 氣,和P2。檢查2. Verify unit trip and coast down to turni ng gear核實(shí)機(jī)組跳閘,惰行至 盤(pán)車(chē)3. Actual first firing and check for gas leaks at firing speed 實(shí)際第一次點(diǎn) 火,檢查

7、點(diǎn)火速度時(shí)是否漏氣4. Acceleration unit up to FSNL and stabilized min 4 hours thermal soak5. Start up heater commissioning將機(jī) 組加速到FSNL,至少穩(wěn)定4小時(shí) 熱浸泡6. Normal down unit and keep turning gear on for n atural cooldow n.機(jī)組正 常停機(jī),保持盤(pán)車(chē),自然冷卻7. Monitor vibration levels through out the test period監(jiān)視整個(gè)試驗(yàn)期間的 振動(dòng)級(jí)After Shut-d

8、own 停機(jī)后1. In stall bala nee shots if required 女口果需要,安裝平衡粒2. Repair any leaks / defects ide ntified 修復(fù)發(fā)現(xiàn)的 泄漏/缺陷3. Replace or clea n the stra iners of LP Hood spray, CEP, BFP and drains spray and perform any other maintenance items as required更 換或清潔低壓罩 噴嘴、EDP、BFP和疏水噴嘴的濾網(wǎng),根據(jù)需 要執(zhí)行其它維護(hù)項(xiàng)4. In spect and cl

9、ea n start up temporary gas stra in- ers and seali ng/cooli ng air if required to clea n 檢查 和清潔起動(dòng)臨時(shí)氣體濾網(wǎng)和密封/冷卻空氣(如 果需要清潔的話(huà))2006年11月6日版次0頁(yè)次2 / 19g The schedule and detail commissioning items of Unit 1 first firing to PAC1號(hào)機(jī)組首次點(diǎn)火至 PAC時(shí)間表及詳細(xì)的調(diào)試項(xiàng)2006年11月6日版次-0Day/Date天/日期Test試驗(yàn)Purpose of Test試驗(yàn)?zāi)康腡est act

10、ivities試驗(yàn)活動(dòng)Day 2第2天11/09/2006Rotor runin:轉(zhuǎn)子試 轉(zhuǎn);Start up and FSNL起動(dòng)和FSNL1. FSNL and heat soak for 4 hoursFSNL和熱浸泡4小時(shí)1. Start normally, go to FSNL and stay there if vibrati on levels acceptable 正 常起動(dòng),至FSNL,如果振動(dòng)級(jí)可 以接受,保持2. Electrical test 電氣試驗(yàn)1) Shaft voltage test 軸電壓試驗(yàn)2) AC impeda nee test交流阻抗試驗(yàn)3) Mai

11、 n tran sformer Short circuit test with the connection of Generator by EX2100 power通過(guò)EX2100電力連接發(fā) 電機(jī)做主變壓器短路試驗(yàn)4) Ope n circuit test by EX2100, The test voltage will be variable from 0V to 20.52KV(1.08PU of 19KV)通過(guò) EX2100 做開(kāi)路試驗(yàn),試驗(yàn)電壓從0V至 20.52KV(19KV 的 1.08PU/)5) Megger check for seal cas ing and bearin

12、g (T8) at collector end side用邁格表檢 查收集器端側(cè)密封缸和軸承(T8)3. Check HRSG expansion檢查 HRSG 的膨脹4. Shutdow n unit and keep tur ning gear on for natural cool down.讓機(jī)組停機(jī), 保持盤(pán)車(chē),自然冷卻5. Mon itor vibrati on levels through out the test period監(jiān)視整個(gè)試驗(yàn)期間的振 動(dòng)級(jí)6. By pass valve commissioning 旁路閥 頁(yè)門(mén)調(diào)試/ 19Remarks 備注After Shut-

13、down 停機(jī)后1. In stall bala nee shots if required 如果需要, 安裝平衡粒2. Repair any leaks / defects identified 修復(fù)發(fā) 現(xiàn)的泄漏/缺陷3. Replace or clea n the stra iner of LP Hood spray, and drains spray and perform any other maintenance items as required更 換或清潔低 壓罩噴嘴和疏水噴嘴,根據(jù)需要執(zhí)行其它 維護(hù)項(xiàng)4. In spect and clea n start up tempora

14、ry gasstrai ners and seali ng/cooli ng air if required to clean檢查和清潔起動(dòng)臨時(shí)氣體濾網(wǎng)和密封/冷卻空氣(如果需要清潔的話(huà))g The schedule and detail commissioning items of Unit 1 first firing to PAC1號(hào)機(jī)組首次點(diǎn)火至 PAC時(shí)間表及詳細(xì)的調(diào)試項(xiàng)Day/Date天/日期Test試驗(yàn)Purpose of Test試驗(yàn)?zāi)康腢nit activities 機(jī)組活動(dòng)Remarks 備注2006年11月6日版次0頁(yè)次6 / 19g The schedule and d

15、etail commissioning items of Unit 1 first firing to PAC1號(hào)機(jī)組首次點(diǎn)火至 PAC時(shí)間表及詳細(xì)的調(diào)試項(xiàng)Day 3第3天11/10/2006Rotor Run-in:;轉(zhuǎn)子試 轉(zhuǎn);FSNL1. Run up to FSNL 運(yùn)行至 FSNL2. Perform off line electrical tests 執(zhí) 行脫機(jī)電氣試驗(yàn)3. Dummy synchronization test 偽同 步試驗(yàn)4. Protection test保護(hù)試驗(yàn)5. Synch check同步檢查6. EX2100 on-line test EX2100 聯(lián)機(jī)

16、 試驗(yàn)1. Unit restart to FSNL機(jī)組重新起動(dòng)至 FSNL2. EX2100 Offline test EX2100 脫機(jī)試驗(yàn)1) Manual high and low limit,手動(dòng)高低極 限2) Offline OEL limit test 脫機(jī) OEL 極限 試驗(yàn)3) Offline OEL trip test.脫機(jī) OEL 跳閘 試驗(yàn)4) Voltage high trip test.電壓?jiǎn)J跳閘試驗(yàn)5) V/HZ straight time/ Reverse time trip.V/HZ正向/反向時(shí)間跳閘6) Auto High and low limit tes

17、t.自動(dòng)高低 極限試驗(yàn)7) PT failure Test. PT 故障試驗(yàn)8) Auto/Ma nual tran sfer test .自動(dòng) /手動(dòng)傳 輸試驗(yàn)9) M1/M2 transfer test.M1/M2 傳輸試驗(yàn)3. Dummy Sy nch test 偽同步試驗(yàn)4. Perform syn chr onize to grid and reverse power 52G trip test if vibration levels Acceptable如果振動(dòng)級(jí)可以接受,與電 網(wǎng)并網(wǎng),倒送電52G跳閘試驗(yàn)5. EX2100 on-li ne test (25% load)EX21

18、00 聯(lián)機(jī)試驗(yàn)(25%負(fù)荷)6. Mon itor vibrati on levels through out the test period.監(jiān)視整個(gè)試驗(yàn)期間的振動(dòng)級(jí)7. By pass valve commissi oning旁路閥 門(mén)調(diào)試After Shut-down 停機(jī)后1. In stall bala nee shots if required 女口果需要, 安裝平衡粒2. Repair any leaks / defects ide ntified 修復(fù)發(fā) 現(xiàn)的泄漏/缺陷3. Replace or clea n the stra iners of LP Hood spray, C

19、EP, BFP and drains spray and perform any other maintenance items as require(更換 或清潔低壓罩噴嘴、EDP、BFP和疏水噴嘴的濾網(wǎng),根據(jù)需要執(zhí)行其它維護(hù)項(xiàng)4. In spect and clea n start up temporary gasstrainers and sealing/cooling air if required to clean檢查和清潔起動(dòng)臨時(shí)氣體濾網(wǎng)和密封/冷卻空氣(如果需要清潔的話(huà))頁(yè)次6 / 192006年11月6日版次0g The schedule and detail commissi

20、oning items of Unit 1 first firing to PAC1號(hào)機(jī)組首次點(diǎn)火至 PAC時(shí)間表及詳細(xì)的調(diào)試項(xiàng)Day 4第4天11/11/2006Load test 負(fù)荷試驗(yàn)Combi ned cycle 聯(lián) 合循環(huán)1. Start up and Synch to grid起動(dòng) 和并網(wǎng)2. Steam cleaning蒸汽清洗3. Line up of chemical sampling, dosi ng and CPP調(diào)整化學(xué)取 樣、加藥和CPP4. Steam to turbine if steam quality acceptable如果蒸汽質(zhì)量可以接 受,給汽機(jī)送蒸汽

21、5. Over speed trip test超速跳閘試 驗(yàn)1. Restart unit to FSNL and synch to grid 重新起動(dòng)機(jī)組至FSNL,并網(wǎng)2. Steam cleaning and steam to turbine if steam quality acceptable如 果蒸汽質(zhì)量 可以接受,蒸汽清洗,給汽機(jī)送蒸汽3. Steam temperature matchi ng test蒸汽 溫度匹配試驗(yàn)4. ST 25% load and min 4 hours soak蒸汽 輪機(jī)25%負(fù)荷,至少浸泡4小時(shí)5. 52G breaker off and over

22、 speed trip test 52G斷路器斷開(kāi),超速跳閘試驗(yàn)6. Monitor vibration levels through out the test period監(jiān)視整個(gè)試驗(yàn)期間的振動(dòng)級(jí)After Shut-down 停機(jī)后1. In stall bala nee shots if required 女口果需要, 安裝平衡粒2. Repair any leaks / defects ide ntified 修復(fù)發(fā) 現(xiàn)的泄漏/缺陷3. Replace or clea n the stra iner of LP Hood spray, and drains spray and perf

23、orm any other maintenance items as requirec更 換或清潔低 壓罩噴嘴和疏水噴嘴,根據(jù)需要執(zhí)行其它 維護(hù)項(xiàng)4. In spect and clea n start up temporary gas strainers and sealing/cooling air if required to clean檢查和清潔起動(dòng)臨時(shí)氣體濾網(wǎng)和密封 / 冷卻空氣(如果需要清潔的話(huà))Day/Date天/日期Test試驗(yàn)Purpose of Test試驗(yàn)?zāi)康腢nit activities 機(jī)組活動(dòng)Remarks 備注Day 5第5天11/12/2006DLN tunin

24、g PPM mode to base LoadDLN調(diào) 整PPM模式至基 本負(fù)荷1. Combined cycle base load (PPM) operation聯(lián)合循環(huán)基本負(fù)荷(PPM)運(yùn)行2. Preliminary DLN tuning up base load with strai ner (PPM)帶濾網(wǎng) 初步DLN調(diào)整基本負(fù)荷1. Restart unit and load to combined cycle base load with PPM重新起動(dòng)機(jī)組,加 載至聯(lián)合循環(huán)基本負(fù)荷PPM2. Perform DLN tuning 執(zhí)行 DLN 調(diào)整3. Performanee

25、 heater commissioning執(zhí) 行加熱器調(diào)試3. EX2100 step respo nse test (25%, 50%, 75% and 100%).EX2100階躍響應(yīng)試驗(yàn)(25%, 50%, 75% 和 100%)4. PT failure test at on-li ne con diti on (25% only)聯(lián)機(jī)狀態(tài)下PT故障試驗(yàn)(僅25%)5. HRSG safety valve test if any HRSG安 全閥門(mén)試驗(yàn)(如果有的話(huà))6. Perform no rmal shutdow n afterwards and monitor flame out

26、 at correct speed during unit coast down執(zhí)行正常停機(jī),監(jiān)視 機(jī)組惰行期間正確速度時(shí)的熄火情況7. Mon itor vibrati on levels through out the test period監(jiān)視整個(gè)試驗(yàn)期間的振動(dòng)級(jí)8. Check HRSG expansion檢查 HRSG 的 膨脹After Shut-down 停機(jī)后1. In stall bala nee shots if required 女口果需要, 安裝平衡粒2. Repair any leaks / defects ide ntified 修復(fù)發(fā) 現(xiàn)的泄漏/缺陷3. Repl

27、ace or clea n the stra iner of LP Hood spray, and drains spray and perform any other maintenance items as requirec更 換或清潔低 壓罩噴嘴和疏水噴嘴,根據(jù)需要執(zhí)行其它 維護(hù)項(xiàng)4. In spect and clea n start up temporary gas strainers and sealing/cooling air if required to clean檢查和清潔起動(dòng)臨時(shí)氣體濾網(wǎng)和密封 / 冷卻空氣(如果需要清潔的話(huà))Day 6第6天11/13/2006PPM b

28、ase load for 30 hours PPM負(fù) 荷30小 時(shí)Combi ned CycleBase Load 聯(lián) 合循環(huán)基 本負(fù)荷1. Combined cycle base load (PPM) operation聯(lián)合循環(huán)基本負(fù)荷(PPM)運(yùn)行2. Continue to run 30 hours at PPM base load繼續(xù)以PPM基本負(fù)荷 運(yùn)行30小時(shí)1. Restart unit and load to combined cycle base load (PPM重新起動(dòng)機(jī)組,加載 到聯(lián)合循環(huán)基本負(fù)荷(PPM)2. Monitor vibration levels 監(jiān)視振動(dòng)

29、級(jí)In spect and clea n start up temporary gas strainers and sealing/cooling air if required to clean檢查和清潔起動(dòng)臨時(shí)氣體濾網(wǎng)和密封/冷卻空氣(如果需要清潔的話(huà))Day 7第7天11/14/2006PPM base load for 30 hours PPM基 本負(fù)荷30小時(shí)Combi ned Cycle BaseLoad 聯(lián) 合循環(huán)基 本負(fù)荷1. Combi ned cycle base load (PPM) Operation聯(lián)合循環(huán)基本負(fù)荷(PPM)運(yùn)行2. Co ntinue to run

30、30 hours at PPM base load繼續(xù)以PPM基本負(fù)荷運(yùn)行30小時(shí)1. Continue to run comb ined cycle baseload (PPM)繼續(xù)運(yùn)行聯(lián)合循環(huán)基本負(fù)荷(PPM)2. Monitor vibration levels 監(jiān)視振動(dòng)級(jí)3. Perform no rmal shutdow n afterwards and monitor flame out at correct speed during unit coast down執(zhí)行正常停機(jī),監(jiān)視 機(jī)組惰行期間正常速度時(shí)的熄火In spect and clea n start up tempor

31、ary gas strainers and sealing/cooling air if required to clean檢查和清潔起動(dòng)臨時(shí)氣體濾網(wǎng)和密封/冷卻空氣(如果需要清潔的話(huà))Day/Date天/日期Test試驗(yàn)Purpose of Test試驗(yàn)?zāi)康腢nit activities 機(jī)組活動(dòng)Remarks 備注Day 8第8天Cooli ng dow n 冷Cooli ng dow n to remove all of strai ners冷卻后拆除所有濾網(wǎng)Cooli ng dow n to remove all of stra iners 冷卻后拆除所有濾網(wǎng)Remove all of

32、 strai ners for gas fuel, seali ng and cooli ng air, steam stra iners after comple-11/15/2006卻tion of 30 hours operation 運(yùn)行 30 小時(shí)結(jié)束后拆除氣體燃料、密圭寸空氣和冷卻空氣的所 有濾網(wǎng)及蒸汽濾網(wǎng)Day 09 第9天11/16/2006Cooli ng dow n 冷卻Cooli ng dow n to remove all of strai ners冷卻后拆除所有濾網(wǎng)Cooling down to remove all of strainers 冷 卻后拆除所有濾網(wǎng)In

33、 spect inlet air and exhaust area檢查進(jìn)氣和排氣區(qū)域Remove all of strai ners for gas fuel, seali ng and cooling air, steam strainer after completion of 30 hours operation運(yùn)行30小時(shí)結(jié)束后拆 除氣體燃料、密封空氣和冷卻空氣的所有濾 網(wǎng)及蒸汽濾網(wǎng)Day 10 第10天11/17/2006Cooli ng down 冷卻Cooli ng dow n to remove all of strai ners冷卻后拆除所有濾網(wǎng)Cooling down to

34、 remove all of strainers 冷 卻后拆除所有濾網(wǎng)In spect inlet air and exhaust area檢查進(jìn)氣和排氣區(qū)域Remove all of strai ners for gas fuel, seali ng and cooling air, steam strainer after completion of 30 hours operation運(yùn)行30小時(shí)結(jié)束后拆 除氣體燃料、密封空氣和冷卻空氣的所有濾 網(wǎng)及蒸汽濾網(wǎng)Day 11 第11天11/18/2006DLN tuning Premixed mode to base LoadDLN調(diào) 整預(yù)混

35、合 模式至基本負(fù)荷DLN1. Combi ned cycle base load (PM) operation聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行2. DLN tuning without stra iner for Premixed mode預(yù)混合模式無(wú)濾網(wǎng) DLN調(diào)整3. Load reject test for 50% and 100% 50%和100%的甩負(fù)荷試驗(yàn)1. Restart unit and load to comb ined cycle base load with PM重新起動(dòng)機(jī)組,加載 到聯(lián)合循環(huán)基本負(fù)荷PM2. Perform DLN tuning 執(zhí)行 DLN 調(diào)整3. L

36、oad reject test for 50% and 100% 50% 和100%的甩負(fù)荷試驗(yàn)4. Re-S ynch to gird and base loac重 新并網(wǎng)和基本負(fù)荷5. Prepare 168 hours reliability test run 準(zhǔn) 備168小時(shí)可靠性試運(yùn)CEMS ready to DLN tuningCEMS準(zhǔn)備DLN調(diào)整Day 12 第12天 11/19/2006Reliability run 168hrs, 11. Combi ned cycle base load (PM) operation聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行1. Combi ned c

37、ycle base load (PM) opera-tion聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行CEMS ready to PM base loadCEMS準(zhǔn)備PM基本負(fù)荷day可靠性運(yùn)行168小時(shí),第1 天Day 13 第13天 11/20/2006Reliability run 168hrs, 2 day 可 靠性運(yùn)行 168小 時(shí),第2 天1. Combi ned cycle base load (PM) operation聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行1. Combi ned cycle base load (PM) opera- tion聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行CEMS ready to

38、PM base loadCEMS準(zhǔn)備PM基本負(fù)荷Day/Date天/日期Test試驗(yàn)Purpose of Test試驗(yàn)?zāi)康腢nit activities 機(jī)組活動(dòng)Remarks 備注Day 14 第14天 11/21/2006Reliability run 168hrs, 3 day可靠 性運(yùn)行 168小 時(shí),第3 天1. Combi ned cycle base load (PM) operation聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行1. Combi ned cycle base load (PM) opera- tion聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行CEMS ready to PM base lo

39、adCEMS準(zhǔn)備PM基本負(fù)荷Day 15 第15天 11/22/2006Reliability run 168hrs, 4 day可靠1. Combi ned cycle base load (PM) operation聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行1. Combi ned cycle base load (PM) opera- tion聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行CEMS ready to PM base loadCEMS準(zhǔn)備PM基本負(fù)荷2006年11月6日版次0頁(yè)次12 / 19g The schedule and detail commissioning items of Unit 1 f

40、irst firing to PAC1號(hào)機(jī)組首次點(diǎn)火至 PAC時(shí)間表及詳細(xì)的調(diào)試項(xiàng)性運(yùn)行168小 時(shí),第4 天Day 16 第16天 11/23/2006Reliability run 168hrs, 5 day可靠 性運(yùn)行 168小 時(shí),第5 天1. Combi ned cycle base load (PM) operation聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行1. Combi ned cycle base load (PM) opera- tion聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行CEMS ready to PM base loadCEMS準(zhǔn)備PM基本負(fù)荷Day 17 第17天11/24/2006R

41、eliability run 168hrs, 6 day可靠 性運(yùn)行 168小 時(shí),第6 天1. Combi ned cycle base load (PM) operation聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行1. Combi ned cycle base load (PM) opera- tion聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行CEMS ready to PM base loadCEMS準(zhǔn)備PM基本負(fù)荷Day 18 第18天 11/25/2006Reliability run 168hrs, 7 day可靠 性運(yùn)行 168小 時(shí),第7 天1. Combi ned cycle base load (P

42、M) operation聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行1. Combi ned cycle base load (PM) opera- tion聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行2. Normal shut down after completion of 168 hours reliability run test168 小時(shí)可靠 性運(yùn)行試驗(yàn)完成后正常停機(jī)CEMS ready to PM base loadCEMS準(zhǔn)備PM基本負(fù)荷Day 19 第19天 11/26/20068 days start up and shut dow n daily, 1 day 母天起動(dòng) 和停機(jī), 共8天, 第1天8

43、days start up and shut dow n daily 每天起動(dòng)和停機(jī),共8天8 days start up and shut down daily每天起 動(dòng)和停機(jī),共8天8 days start up and shut dow n daily 每天起動(dòng) 和停機(jī),共8天Day/Date天/日期Test試驗(yàn)Purpose of Test試驗(yàn)?zāi)康腢nit activities 機(jī)組活動(dòng)Remarks 備注Day 20 第20天11/27/20068 days start up and shut dow n daily, 2 day1 day每天 起動(dòng)和停 機(jī),共8 天,第2 天8 d

44、ays start up and shut dow n daily 每天起動(dòng)和停機(jī),共8天8 days start up and shut down daily每天起 動(dòng)和停機(jī),共8天8 days start up and shut dow n daily 每天起動(dòng) 和停機(jī),共8天Day 21 第21天 11/28/20068 days start up and shut dow n daily, 3 day1 day每天 起動(dòng)和停8 days start up and shut dow n daily 每天起動(dòng)和停機(jī),共8天8 days start up and shut down dail

45、y每天起 動(dòng)和停機(jī),共8天8 days start up and shut dow n daily 每天起動(dòng) 和停機(jī),共8天機(jī),共8天,第3天Day 22 第22天11/29/20068 days start up and shut dow n daily, 4 day1 day每天 起動(dòng)和停 機(jī),共8 天,第4 天8 days start up and shut dow n daily 每天起動(dòng)和停機(jī),共8天8 days start up and shut down daily每天起 動(dòng)和停機(jī),共8天8 days start up and shut dow n daily 每天起動(dòng) 和停機(jī),

46、共8天Day 23 第23天 11/30/20068 days start up and shut dow n daily, 5 day1 day每天 起動(dòng)和停 機(jī),共8 天,第5 天8 days start up and shut dow n daily 每天起動(dòng)和停機(jī),共8天8 days start up and shut down daily每天起 動(dòng)和停機(jī),共8天8 days start up and shut dow n daily 每天起動(dòng) 和停機(jī),共8天Day/Date天/日期Test試驗(yàn)Purpose of Test試驗(yàn)?zāi)康腢nit activities 機(jī)組活動(dòng)Remarks

47、 備注Day 24 第24天 12/01/20068 days start up and shut dow n daily, 6 day1 day每天 起動(dòng)和停 機(jī),共8 天,第6 天8 days start up and shut dow n daily 每天起動(dòng)和停機(jī),共8天8 days start up and shut down daily每天起 動(dòng)和停機(jī),共8天8 days start up and shut dow n daily 每天起動(dòng) 和停機(jī),共8天Day 25 第25天 12/02/20068 days start up and shut dow n daily, 7 da

48、y1 day每天 起動(dòng)和停 機(jī),共8 天,第7 天8 days start up and shut dow n daily 每天起動(dòng)和停機(jī),共8天8 days start up and shut down daily每天起 動(dòng)和停機(jī),共8天8 days start up and shut dow n daily 每天起動(dòng) 和停機(jī),共8天Day 26 第26天 12/03/20068 days start up and shut dow n daily, 8day1 day每天 起動(dòng)和停 機(jī),共8 天,第8 天8 days start up and shut dow n daily 每天起動(dòng)和停

49、機(jī),共8天8 days start up and shut down daily每天起 動(dòng)和停機(jī),共8天8 days start up and shut dow n daily 每天起動(dòng) 和停機(jī),共8天Day 27 第27天 12/04/2006No Test沒(méi)有試驗(yàn)Cooling 冷卻Cooling for water wash 冷卻準(zhǔn)備水洗In stall performa nee test equipme nts 安裝性能 試驗(yàn)設(shè)備Day 28 第28天 12/05/2006No Test沒(méi)有試驗(yàn)Cooling 冷卻Cooling for water wash 冷卻準(zhǔn)備水洗In stal

50、l performa nee test equipme nts 安裝性能 試驗(yàn)設(shè)備Day/Date天/日期Test試驗(yàn)Purpose of Test試驗(yàn)?zāi)康腢nit activities 機(jī)組活動(dòng)Remarks 備注Day 29 第29天 12/06/2006Off line water wash 脫 機(jī)水洗Off line water wash 脫機(jī)水洗Off line water wash 脫機(jī)水洗Off line water wash 脫機(jī)水洗Day 30 第30天 12/07/2006In tegratedDLNTuning 整 體DLN調(diào)整In tegrated DLN Tuning for part load 部 分負(fù)荷整體DLN調(diào)整In tegrated DLN Tuning for part load 部分負(fù)荷 整體DLN調(diào)整Collect data收集數(shù)據(jù)Day 31 第31天 12/08/2006No Test沒(méi)有試驗(yàn)Cooling 冷卻Cooling for water wash 冷卻準(zhǔn)備水洗Day 32 第32天 12/09/2006No

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論