




版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、8758 engineering proposalproposal for basic design package for deepwater pipe lay crane vessel12 july 2005current and future market situation focuses on water depth (2,000m) operational conditions distance and lay-speed wide range of pipe diameters (up to 60”) autonomy and pipe storage requirements
2、dp2 compliant system as a minimum, dp3 in futureflexibilitythe (future) pipe lay marketdpv7500 - principal dimensions and performanceprincipal dimensions and performancelength pp185.0 minstalled power8x5,120 kwlength oa204.2 mdp thrusters2x5,000 kw, azibreadth m39.2 m (dp3 compliant)4x4,500 kw, azid
3、epth m14.0 m2x3,000 kw, tunneldraft pipe laying7.0-8.0 mtransit speed12 knotsdraft lifting8.0-9.0 mwater depthup to 2,500 maccommodation330 pobpipe lay systems-lay doublecrane capacity up topipe diameter4-60fixed4,000 mttensioners2x275 mtslewing3,000 mta&r winch675 mtfiring line5 double joint we
4、lding stationspayload20,000 mt1 ndt& repair and 2 coating stationspipe storage9,000 mt2 double joint preparation factoriesdpv7500 general arrangementcooec main requirements water depth1,500 m pipe diameter4”- 60” (including coating) pipe lay speed60” 3km/day in single joint configuration, provis
5、ions for double jointing pipe lay spread7 single joint welding station, 1 ndt and repair, 2 coating station tension3 sets stingerfixed pipe storage1,300 m2 easy conversion to r-lay and j-lay transit speed12 knots accommodation 300 pob dp systemdp2-compliant crane capacity2,000 mt in fixed modedpv500
6、0 general arrangementdpv5000 principal dimensions and performanceprincipal dimensions and performancelength pp172.6 minstalled power6x5,200 kwlength oa189.3 mdp thrusters2x4,500 kw, azibreadth m36.0 m4x3,500 kw, azidepth m13.0 m2x1,500 kw, tunneldraft design7.0-10.0 mtransit speed12 knotswater depth
7、up to 1,500 maccommodation300 pobpipe lay systems-lay doublepipe diameter4-60crane capacity up totensioners3x125 mtfixed2,000 mta&r winch425 mtslewing1,600 mtfiring line7 single joint welding stations(3 to 4 double joint welding stations)payloadappr 15,000 mt 1 ndt& repair and 2 coating stat
8、ionspipe storageappr 5,000 mt1 or 2 double joint preparation factoriesdpv7500 - dpv5000 performance comparisondpv7500 dpv5000 water depth2,500 m1,500 m pipe lay speed5 dj welding stations3 (4) dj welding stations (or 7 single) 9,000 mt pipe storage5,000 mt pipe storage tension capacity 2x275mt = 550
9、mt3x125mt = 375mt a&r winch675mt425mt accommodation 330 pob300 pob dp systemdp3 compliantdp2 compliant propulsion/dp32.0 mw26.0 mw installed power41.0 mw31.2 mw max crane load4,000 mt fixed2,000 mt fixed3,000 mt slewing1,600 mt slewingdpv7500 - dpv5000 project schedule1. delivery of existing app
10、roved basic design package dpv7500 4 weeks document renumbering to cooec project requirements conversion to word, autocad and excel format submittal to ccs2. delivery of customized concept and basic design package (dpv5000) 22 weeks concept design 4 weeks cooec concept approval 1 week delivery of sh
11、ipyard tender package 12 weeks after concept approval finalizing complete basic design package 5 weeks after shipyard tender packagerecommendation to cooec deepwater pipe lay projectadvantages of the dpv 7500 traject: large capacity and most flexible pipe-lay vessel, suitable for almost all kind of pipe-lay projects worldwide existing class a
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 關(guān)于汽車商業(yè)險(xiǎn)合同范本
- 農(nóng)資銷售合同范本
- 即期買賣合同范本
- 副經(jīng)理合同范本
- 包工頭安全合同范本
- 兼職司機(jī)租車合同范本
- 買賣棉絮合同范本
- 單位與單位合同范本
- 原版裝修合同范本
- 業(yè)務(wù)服務(wù)咨詢合同范本
- 全新版大學(xué)高階英語(yǔ):綜合教程 第3冊(cè) Unit 6 China Rejuvenated課件
- 2024年下半年江蘇省鹽城市射陽(yáng)縣人民政府項(xiàng)目辦公室招聘易考易錯(cuò)模擬試題(共500題)試卷后附參考答案
- 醫(yī)療行業(yè)信息安全等級(jí)保護(hù)
- 新公務(wù)員法培訓(xùn)講稿
- 用人部門面試官培訓(xùn)
- 荊州市國(guó)土空間總體規(guī)劃(2021-2035年)
- 2024年政府辦事-戶口管理考試近5年真題集錦(頻考類試題)帶答案
- 鋰離子電池制造中的電池市場(chǎng)動(dòng)態(tài)分析考核試卷
- 2024年內(nèi)蒙古中考語(yǔ)文試卷五套合卷附答案
- 園林綠化養(yǎng)護(hù)標(biāo)準(zhǔn)及經(jīng)費(fèi)測(cè)算
- 結(jié)構(gòu)力學(xué)本構(gòu)模型:粘彈性模型:粘彈性模型的數(shù)值模擬技術(shù)
評(píng)論
0/150
提交評(píng)論