


下載本文檔
版權說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權,請進行舉報或認領
文檔簡介
1、1.0 PURPOSETo define the procedureused to assess Finished Goods ' compliance to product and engineering specification and to confirm all design issues are closed.2.0 SCOPE2.1 This procedure applies to all factories in Asia currently supplying Finished Goods to Char-Broil.2.2 This procedure appli
2、es to any products developed by CB New ProductDevelopment Teams (NPDT) and produced by factories in Asia.2.3 This procedure is applicable to the following conditions, but not limited to:2.3.1 New design models / concepts2.3.2 Existing models that are moved to a different manufacturing location.2.3.3
3、 Existing models with major design changes.3.0 REFERENCESEngineering / Product Specification Assembly Manual Bills of MaterialWorkma nship Stan dards / Criteria for Rejecti on CFRPrints and MetrologyGraphic Art / Carton Art / Point of Purchased labels.EP Compliance ReportCross Build ProcedureCP 0004
4、4.0 RESPONSIBILITIES4.1 Product EngineeringAsia Operations Lead Organization for Engineering Pilot:4.1.1 Assign Engineering Pilot responsibilities by Manager, Product Engineering - Asia Operations.4.1.2 Conduct engineering pilot and provide report to CBNPDT, Factory Supplier and Operations TeamAsia
5、Operations for review via PDM Link.4.2 Operations, Asia Operations4.2.1 Perform or arrange to have performed the required product transit test and provide test report / results upon completion.4.3 Joint Responsibilities Product Engineering & OperationsAsia Operations4.3.1 Product Engineering and
6、 Operations TeamAsia Operations and Factory / Supplier to determine understanding of critical relationship of processes required to manufacture product.4.3.2 Review supplier metrology reports from off tool parts.4.3.3 Check drawings against off tool parts. Verify compliance between parts and drawing
7、s.4.3.4 Review T1 Report and agreed upon required changes and time to complete. Report results as part of EP Report.4.3.5 Verify views and accuracy of Instruction Manual.4.3.6 Verify BOM accuracy.4.3.7 Verify Artwork is correct and accurate.4.3.8 Review final packaging and report any noted issues or
8、 recommendations / concerns.4.3.9 Compare EP units to CFR / Workmanship Standards.4.3.10 Perform functional test (Use as a consumer would).4.3.11 Review and comment on final engineering prototype models. Report any noted issues or recommendations.4.3.12 Conduct a cross-build of EP units to confirm f
9、it and function and process capability of processes to produce components from tooling. Report any issues or recommendations.4.3.13 Submit samples to certification / third party testing as required and requested.4.4 Factory/Supplier4.4.1 To provide Product Engineering -Asia Operations with documenta
10、tion (drawings) referencing completed tooling / process plan relating to the model being reviewed.4.4.2 To conduct internal review of model and provide comments to Product Engineering -Asia Operations and US NPDT.4.4.3 For all off tool components complete metrology reports and provide First Piece In
11、spection (FPI) documentation to Product Engineering-Asia Operations and Operations Team-Asia Operations.4.4.4 To have available off tool parts and components needed to build seven to ten units.4.4.5 Complete final prototype model prior to EP.4.5 Product Data System4.5.1 To complete the product BOM
12、39;s and any revisions prior to the ProductionPilot Run.4.5.2 Complete the product instruction manual prior to EP.4.5.3 Release component prints and model files prior to and in support of initial production.4.6 NPD Team - Provide the following in support of EP.4.6.1 Product Description Statement (PD
13、S)4.6.2 Product Specification Document (PSD)4.6.3 Complete Pro E 3-D files (when applicable).4.6.4 Review and provide comments regarding Prototype Models4.6.5 Complete Product Workmanship Standards and Criteria for Rejection.5.0 Procedure5.1 All parts for engineering pilot should be 100% manufacture
14、d off final tooling.5.2 Review supplier's metrology reports and check critical dimensions of the parts perdrawing.5.3 Verify the material, material thickness, and surface finishing of the parts.5.4 Randomly select parts to assemble all units per the Instruction Manual.5.5 Check fit and function
15、of the assembled units.5.6 Compare ALL artwork to required standards, including, but not limited to the following:5.6.1 Graphic and carton art; POP; carton, rating and warning labels.5.6.2 Instruction Manuals5.7 Note any discrepancies between the Product Specification, BOM, Instruction Manual and un
16、it on EP Report Form.5.8 Compare units to CFR / Workmanship Standards.5.9 Perform functional test. (Use as consumer would)5.10 Review final packaging and make any recommendations.5.11 Engin eeri ng Team to work with Operatio ns Team-Asia and supplier factory to determine understanding of critical re
17、lationship of processes required to manufacture product.5.12 If requested, send samples to responsible US NPDT.5.13 Submit samples to certification and third party testing, as required and requested.5.14 Issue Engineering Pilot (EP) report to respective departments via PDMLink.5.15 Process after Eng
18、ineering Pilot and before Production Pilot and First Production.5.15.1 Operations, Asia Operations shall perform or arrange to have performed the product transit test and provide test report, as required.5.15.2 Supplier shall provide schedule for implementation of required improvements as per the Engineering Pilot report.5.15.3 If required, supplier shall send graphic samples to NPD Team and Product Engineering -Asia Operations for approval.5.15.4 NPD Team Quality Manager shall provide finalized Workmanship Standards and Criteria for Rejection (CFR) documentation.5.
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 個人食堂承包協(xié)議書
- 單片機原理與應用練習題與參考答案
- 人防租賃轉讓合同范本
- 熱工基礎 模擬試題
- 萬年牢說課稿
- 一周學習總結
- 一防水合同范例
- 兼職定金合同范本
- 《荊棘鳥》讀書心得
- 制作甲方合同范本
- 2025年4月自考15040習概押題及答案
- 口腔健康全身健康課件
- 2025年高考英語復習專項突破:讀后續(xù)寫提分寫作(解析版)
- 數(shù)字出版概論 課件 第一章 數(shù)字出版及其發(fā)展歷程
- 一把手講安全課件:提升全員安全意識
- CNAS實驗室內(nèi)審檢查表
- 華為全屋智能試題
- Unit 3 Food and Culture Reading and thinking閱讀課教學設計 2023-2024學年人教版高中英語選擇性必修第二冊
- 數(shù)學大觀 知到智慧樹網(wǎng)課答案
- 小兒白血病飲食
- 2024年杭州科技職業(yè)技術學院單招職業(yè)技能測試題庫及答案解析
評論
0/150
提交評論