1、Day/Date天/日期Day 1第1天11/08/2006Test試驗(yàn)Purpose of Test試驗(yàn)?zāi)康腡est activities 試驗(yàn)活動Remarks 備注Rotor run-in:轉(zhuǎn)子試轉(zhuǎn):Crank test搖轉(zhuǎn)試驗(yàn).5.6.Liste n for rubs or unu sual no ises聽是否有摩擦和異常噪音Functional test of emerge ncy trip button緊急跳閘按鈕的功能試 驗(yàn)Purge sp eed cranking for rotor vibration check以吹掃速度搖 轉(zhuǎn),檢查轉(zhuǎn)子振動情況Mon ito

2、r LCI starti ng temp era- tures and operation監(jiān)視器 LCI 起動溫度和運(yùn)行Air blow ing the purge piping of D5 and PM4 gas fuel duri ng crank搖轉(zhuǎn)期間給D5和PM4吹 掃管鼓風(fēng)Check op erati on of lift oil and turni ng gear檢查頂軸油和盤車 的運(yùn)行.Roll up to 50 rpm trip by DCS emergency push butt on and 200 rpm and trip by GT MK 6 contr

3、ol emergency stop 通 過DCS緊急按鈕逐漸增加到 50rpm,通過GT MK6控制緊急停機(jī) 跳閘Restart, accelerate to go to Purge sp eed for 5min and select no rmal stop 重起, 加速到吹掃速度5分鐘,選擇正常停 止Restart, hold at purge sp eed and air blow ing the piping of D5 and PM4, trip by DCS customer trip (L4CT) after 30 Min crank test重起,保持在吹掃速 度,給D5和P

4、M4管道鼓風(fēng),在30 分鐘搖轉(zhuǎn)試驗(yàn)后通過DCS客戶跳閘(L4CT)跳閘Verify coast down to turning gear 核實(shí) 惰行至盤車Mon itor vibrati on levels through out the test period監(jiān)視整個試驗(yàn)期間的振動 級Use auto start-up seque nces to prepare the unit for a“-RESdart采用自動走動順序?qū)C(jī)組準(zhǔn)備好“準(zhǔn)備起動”Rub checks are p erformed 檢查摩擦ADRE vibrati on mon itor to be conn ected*連

5、接ADRE振動監(jiān)視器After Shut-down 停機(jī)后*Rein state the piping spool of D5 and PM4 pipe work after shutdown 停機(jī)后重新恢 復(fù)D5和PM5管子的導(dǎo)管5.Day 1Rotor run-第1天in:11/08/2006轉(zhuǎn)子試 轉(zhuǎn):False firing, actual first firing and FSNL 假點(diǎn)火, 實(shí)際第一 次點(diǎn)火和FSNL1. False fire 假點(diǎn)火2. Actual First Fire to FSNL 實(shí)際第一次點(diǎn)火至 FSNL.5.6.Select fire f

6、or false fire and check un it for gas leaks, and P2 pr. Check 選擇假點(diǎn)火的火,檢查機(jī)組是否漏 氣,和P2。檢查Verify unit trip and coast dow n to turni ng gear核實(shí)機(jī)組跳閘,惰行至 盤車Actual first firing and check for gas leaks at firing sp eed 實(shí)際第一次點(diǎn) 火,檢查點(diǎn)火速度時是否漏氣Accelerati on unit up to FSNL and stabilized min 4 hours thermal soak S

7、tart up heater commissi oning 將機(jī) 組加速到FSNL,至少穩(wěn)定4小時 熱浸泡Normal dow n un it and kee p turning gear on for n atural cooldow n.機(jī)組正 常停機(jī),保持盤車,自然冷卻Mon itor vibrati on levels through out the test period監(jiān)視整個試驗(yàn)期間的 振動級After Shut-down 停機(jī)后1. In stall bala nee shots if required 女口果需要,安裝平衡粒2. Rep air any leaks / def

8、ects ide ntified 修復(fù)發(fā)現(xiàn)的 泄漏/缺陷3. Rep lace or elea n the stra iners of LP Hood spray, CEP, BFP and drains spray and p erform any other maintenance items as required更 換或清潔低壓罩 噴嘴、EDP、BFP和疏水噴嘴的濾網(wǎng),根據(jù)需 要執(zhí)行其它維護(hù)項(xiàng)4. Insp ect and clea n start up temporary gas stra iners and seali ng/cooli ng air if required to

9、clea n 檢查 和清潔起動臨時氣體濾網(wǎng)和密封/冷卻空氣(如 果需要清潔的話)7.Day/Date天/日期Test試驗(yàn)Purpose of Test試驗(yàn)?zāi)康腢nit activities 機(jī)組活動Remarks 備注Purpose of Test試驗(yàn)?zāi)康腡est activities試驗(yàn)活動Remarks 備注Day 2Rotor run-第2天in:11/09/2006轉(zhuǎn)子試轉(zhuǎn);Start up and FSNL起動和FSNLTest試驗(yàn)Day/Date天/日期1. FSNL and heat soak for 4 hoursFSNL和熱浸泡4小時1. Start normally, go

10、 to FSNL and stay there if vibrati on levels acce ptable 正 常起動,至FSNL,如果振動級可 以接受,保持2. Electrical test 電氣試驗(yàn)1) Shaft voltage test 軸電壓試驗(yàn)2) AC imp eda nee test交流阻抗試驗(yàn)3) Mai n tran sformer Short circuit test with the connection of Gen erator by EX2100 power通過EX2100電力連接發(fā) 電機(jī)做主變壓器短路試驗(yàn)4) Open circuit test by E

11、X2100, The test voltage will be variable from 0V to 20.52KV(1.08PU of 19KV)通過 EX2100 做開路試驗(yàn),試驗(yàn)電壓從0V至 20.52KV(19KV 的 1.08PU/)5) Megger check for seal cas ing and bearing (T8) at collector end side 用邁格表檢 查收集器端側(cè)密封缸和軸承(T8)3. Check HRSG expansion檢查 HRSG 的膨脹4. Shutdow n unit and kee p turning gear on for n

12、 atural cool dow n.讓機(jī)組停機(jī), 保持盤車,自然冷卻5. Mon itor vibrati on levels through out the test period監(jiān)視整個試驗(yàn)期間的振 動級6. By pass valve commissioning 旁路閥 門調(diào)試After Shut-down 停機(jī)后1. In stall bala nee shots if required 女口果需要, 安裝平衡粒2. Rep air any leaks / defects ide ntified 修復(fù)發(fā) 現(xiàn)的泄漏/缺陷3. Replace or elea n the stra ine

13、r of LP Hood spray, and drains spray and p erform any other maintenance items as required更 換或清潔低 壓罩噴嘴和疏水噴嘴,根據(jù)需要執(zhí)行其它 維護(hù)項(xiàng)4. Inspect and elea n start up temporary gasstrai ners and seali ng/cooli ng air if required to clean檢查和清潔起動臨時氣體濾網(wǎng)和密封/冷卻空氣(如果需要清潔的話)After Shut-down 停機(jī)后Day 3第3天11/10/2006RotorRu n-i

14、n:;轉(zhuǎn)子試轉(zhuǎn);FSNL1. Run up to FSNL 運(yùn)行至 FSNL2. Perform off line electrical tests 執(zhí) 行脫機(jī)電氣試驗(yàn)3. Dummy synchronization test 偽同 步試驗(yàn)4. Protection test保護(hù)試驗(yàn)5. Synch check同步檢查6. EX2100 on-line test EX2100 聯(lián)機(jī) 試驗(yàn)1. Unit restart to FSNL機(jī)組重新起動至 FSNL2. EX2100 Offline test EX2100 脫機(jī)試驗(yàn)1) Manual high and low limit,手動高低極 限

15、2) Offline OEL limit test 脫機(jī) OEL 極限 試驗(yàn)3) Offline OEL trip test.脫機(jī) OEL 跳閘 試驗(yàn)4) Voltage high trip test.電壓高跳閘試驗(yàn)5) V/HZ straight time/ Reverse time trip.V/HZ正向/反向時間跳閘6) Auto High and low limit test.自動高低 極限試驗(yàn)7) PT failure Test. PT 故障試驗(yàn)8) Auto/Ma nual tran sfer test .自動 /手動傳 輸試驗(yàn)9) M1/M2 transfer test.M1/M

16、2 傳輸試驗(yàn)3. Dummy Sy nch test 偽同步試驗(yàn)4. P erform syn chr onize to grid and reverse po wer 52G trip test if vibrati on levels Acce ptable如果振動級可以接受,與電 網(wǎng)并網(wǎng),倒送電52G跳閘試驗(yàn)5. EX2100 on-li ne test (25% load)EX2100 聯(lián)機(jī)試驗(yàn)(25%負(fù)荷)6. Mon itor vibrati on levels through out the test period.監(jiān)視整個試驗(yàn)期間的振動級7. By p ass valve co

17、mmissi oning旁路閥 門調(diào)試1. In stall bala nee shots if required 女口果需要, 安裝平衡粒2. Rep air any leaks / defects ide ntified 修復(fù)發(fā) 現(xiàn)的泄漏/缺陷3. Rep lace or elea n the stra iners of LP Hood sp ray, CEP, BFP and drains spray and p erform any other maintenance items as require(更換 或清潔低壓罩噴嘴、EDP、BFP和疏水噴嘴的濾網(wǎng),根據(jù)需要執(zhí)行其它維護(hù)項(xiàng)4.

18、Inspect and elea n start up temporary gasstrai ners and seali ng/cooli ng air if required to clean檢查和清潔起動臨時氣體濾網(wǎng)和密封/冷卻空氣(如果需要清潔的話)Day 4第4天11/11/2006Load test負(fù)荷試驗(yàn)Comb inedcycle 聯(lián)合循環(huán).5.Start up and Synch to grid 起動 和并網(wǎng)Steam clea ning 蒸汽清洗Line up of chemical samp li ng, dosi ng and CPP調(diào)整化學(xué)取 樣、加藥和

19、CPPSteam to turb ine if steam quality acce ptable如果蒸汽質(zhì)量可以接 受,給汽機(jī)送蒸汽Over sp eed trip test 超速跳閘試 驗(yàn)1.2.3.Restart unit to FSNL and synch to grid 重新起動機(jī)組至FSNL,并網(wǎng)Steam clea ning and steam to turb ine if steam quality acce ptable如果蒸汽質(zhì)量 可以接受,蒸汽清洗,給汽機(jī)送蒸汽Steam temp erature matchi ng test蒸汽 溫度匹配試驗(yàn)4. ST 25% load

20、 and min 4 hours soak蒸汽 輪機(jī)25%負(fù)荷,至少浸泡4小時5. 52G breaker off and over speed trip test 52G斷路器斷開,超速跳閘試驗(yàn)6. Monitor vibration levels through out the test period監(jiān)視整個試驗(yàn)期間的振動級1. In stall bala nee shots if required 女口果需要, 安裝平衡粒2. Rep air any leaks / defects ide ntified 修復(fù)發(fā) 現(xiàn)的泄漏/缺陷3. Rep lace or clea n the stra

21、 iner of LP Hood sp ray, and drains spray and p erform any other maintenance items as required更 換或清潔低 壓罩噴嘴和疏水噴嘴,根據(jù)需要執(zhí)行其它 維護(hù)項(xiàng)4. Inspect and clea n start up temporary gas strai ners and seali ng/cooli ng air if required to clean檢查和清潔起動臨時氣體濾網(wǎng)和密封 / 冷卻空氣(如果需要清潔的話)Day/Date天/日期Test試驗(yàn)Purpose of Test試驗(yàn)?zāi)康腢nit

22、 activities 機(jī)組活動Remarks 備注Day 5 第5天DLN tun-11/12/2006ing PPM mode to base LoadDLN調(diào) 整PPM 模式至基本負(fù)荷1.2.Combi ned cycle base load (PPM) op eration聯(lián)合循環(huán)基本負(fù)荷(PPM)運(yùn)行P relimi nary DLN tuning up base load with strai ner (PPM)帶濾網(wǎng) 初步DLN調(diào)整基本負(fù)荷1.2.3.Restart unit and load to comb ined cycle base load with PPM重新起動機(jī)組

23、,加 載至聯(lián)合循環(huán)基本負(fù)荷PPMPerform DLN tuning 執(zhí)行 DLN 調(diào)整 Performa nee heater commissi oning 執(zhí) 行加熱器調(diào)試Day 6第6天11/13/2006PPM base load for 30 hours PPM負(fù) 荷30小 時Combi ned CycleBase Load 聯(lián) 合循環(huán)基 本負(fù)荷1.2.Combi ned cycle base load (PPM) op eration聯(lián)合循環(huán)基本負(fù)荷(PPM)運(yùn)行Con ti nue to run 30 hours at PPM base load繼續(xù)以PPM基本負(fù)荷 運(yùn)行30小時

24、3. EX2100 step res ponse test (25%, 50%, 75% and 100%).EX2100階躍響應(yīng)試驗(yàn)(25%, 50%, 75% 和 100%)4. PT failure test at on-li ne con diti on (25% only)聯(lián)機(jī)狀態(tài)下PT故障試驗(yàn)(僅25%)5. HRSG safety valve test if any HRSG安 全閥門試驗(yàn)(如果有的話)6. P erform no rmal shutdow n afterwards and mon itor flame out at correct sp eed during u

25、nit coast down執(zhí)行正常停機(jī),監(jiān)視 機(jī)組惰行期間正確速度時的熄火情況7. Mon itor vibrati on levels through out the test period監(jiān)視整個試驗(yàn)期間的振動級8. Check HRSG expansion檢查 HRSG 的膨脹1. Restart unit and load to combined cycle base load (PPM重新起動機(jī)組,加載 到聯(lián)合循環(huán)基本負(fù)荷(PPM)2. Monitor vibration levels 監(jiān)視振動級1. In stall bala nee shots if required 女口果需

26、要, 安裝平衡粒2. Rep air any leaks / defects ide ntified 修復(fù)發(fā) 現(xiàn)的泄漏/缺陷3. Rep lace or clea n the stra iner of LP Hood sp ray, and drains spray and p erform any other maintenance items as required更 換或清潔低 壓罩噴嘴和疏水噴嘴,根據(jù)需要執(zhí)行其它 維護(hù)項(xiàng)4. Inspect and clea n start up temporary gas strai ners and seali ng/cooli ng air if

27、 required to clean檢查和清潔起動臨時氣體濾網(wǎng)和密封 / 冷卻空氣(如果需要清潔的話)Inspect and clea n start up temporary gas strai ners and seali ng/cooli ng air if required to clean檢查和清潔起動臨時氣體濾網(wǎng)和密封/冷卻空氣(如果需要清潔的話)Day 7第7天11/14/2006PPM base load for 30 hours PPM基 本負(fù)荷30小時Combi nedCycleBaseLoad 聯(lián) 合循環(huán)基 本負(fù)荷1. Combi ned cycle base load

28、(PPM) Op eration聯(lián)合循環(huán)基本負(fù)荷(PPM)運(yùn)行2. Co ntinue to run 30 hours at PPM base load繼續(xù)以PPM基本負(fù)荷運(yùn)行30小時1. Continue to run comb ined cycle base load (PPM)繼續(xù)運(yùn)行聯(lián)合循環(huán)基本負(fù)荷(PPM)2. Monitor vibration levels 監(jiān)視振動級3. P erform no rmal shutdow n afterwards and mon itor flame out at correct sp eed during unit coast down執(zhí)行正常

29、停機(jī),監(jiān)視 機(jī)組惰行期間正常速度時的熄火Inspect and clea n start up temporary gas strai ners and seali ng/cooli ng air if required to clean檢查和清潔起動臨時氣體濾網(wǎng)和密封/冷卻空氣(如果需要清潔的話)Day/Date天/日期Test試驗(yàn)P urpose of Test試驗(yàn)?zāi)康腢nit activities 機(jī)組活動Remarks 備注Day 8第8天11/15/2006Cooli ng dow n 冷卻Cooli ng dow n to remove all of strai ners冷卻后拆除

30、所有濾網(wǎng)Cooli ng dow n to remove all of stra iners 冷卻后拆除所有濾網(wǎng)Remove all of stra iners for gas fuel, seali ng and cooli ng air, steam stra iners after completion of 30 hours op eration 運(yùn)行 30 小時結(jié)束 后拆除氣體燃料、密封空氣和冷卻空氣的所 有濾網(wǎng)及蒸汽濾網(wǎng)Day 09 第9天11/16/2006Cooli ng down 冷卻Cooli ng dow n to remove all of strai ners冷卻后拆

31、除所有濾網(wǎng)Cooling down to remove all of strainers 冷 卻后拆除所有濾網(wǎng)Inspect inlet air and exhaust area檢查進(jìn)氣和排氣區(qū)域Remove all of stra iners for gas fuel, seali ng and cooli ng air, steam stra iner after compl eti on of 30 hours op eratio n運(yùn)行30小時結(jié)束后拆 除氣體燃料、密封空氣和冷卻空氣的所有濾 網(wǎng)及蒸汽濾網(wǎng)Day 10 第10天 11/17/2006Cooli ng down 冷卻Coo

32、li ng dow n to remove all of strai ners冷卻后拆除所有濾網(wǎng)Cooling down to remove all of strainers 冷 卻后拆除所有濾網(wǎng)Inspect inlet air and exhaust area檢查進(jìn)氣和排氣區(qū)域Remove all of stra iners for gas fuel, seali ng and cooli ng air, steam stra iner after compl eti on of 30 hours op eratio n運(yùn)行30小時結(jié)束后拆 除氣體燃料、密封空氣和冷卻空氣的所有濾 網(wǎng)及蒸汽

33、濾網(wǎng)Day 11 第11天11/18/2006DLN tuning Premixed mode to1. Combi ned cycle base load (PM) op eration聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行2. DLN tuning without stra iner for P remixed mode預(yù)混合模式無濾網(wǎng)1. Restart unit and load to comb ined cycle base load with PM重新起動機(jī)組,加載 到聯(lián)合循環(huán)基本負(fù)荷PM2. Perform DLN tuning 執(zhí)行 DLN 調(diào)整3. Load reject test f

34、or 50% and 100% 50%CEMS ready to DLN tuningCEMS準(zhǔn)備DLN調(diào)整base LoadDLN調(diào)整預(yù)混合 模式至基 本負(fù)荷DLNDLN調(diào)整3. Load reject test for 50% and 100%50%和100%的甩負(fù)荷試驗(yàn)和100%的甩負(fù)荷試驗(yàn)4. Re-S ynch to gird and base load重 新并 網(wǎng)和基本負(fù)荷5. Prepare 168 hours reliability test run 準(zhǔn) 備168小時可靠性試運(yùn)Day 12 第12天 11/19/2006Reliability run 168hrs, 1 day

35、可靠 性運(yùn)行 168小 時,第1 天1. Combi ned cycle base load (PM) op eration聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行1. Comb ined cycle base load (PM) op era- tion聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行CEMS ready to PM base loadCEMS準(zhǔn)備PM基本負(fù)荷Day 13 第13天 11/20/2006Reliability run 168hrs, 2 day 可 靠性運(yùn)行 168小 時,第2 天1. Combi ned cycle base load (PM) op eration聯(lián)合循環(huán)基本負(fù)荷(PM)

36、運(yùn)行1. Combi ned cycle base load (PM) op era- tion聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行CEMS ready to PM base loadCEMS準(zhǔn)備PM基本負(fù)荷Day/Date天/日期Test試驗(yàn)P urpose of Test試驗(yàn)?zāi)康腢nit activities 機(jī)組活動Remarks 備注Day 14 第14天11/21/2006Reliability run 168hrs, 3 day可靠 性運(yùn)行 168小 時,第3 天1. Combi ned cycle base load (PM) op eration聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行1. Com

37、bi ned cycle base load (PM) op era- tion聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行CEMS ready to PM base loadCEMS準(zhǔn)備PM基本負(fù)荷Day 15 第15天11/22/2006Reliability run 168hrs, 41. Combi ned cycle base load (PM) op eration聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行1. Comb ined cycle base load (PM) op era- tion聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行CEMS ready to PM base loadCEMS準(zhǔn)備PM基本負(fù)荷day可靠

38、性運(yùn)行168小時,第4 天Day 16 第16天 11/23/2006Reliability run 168hrs, 5 day可靠 性運(yùn)行 168小 時,第5 天1. Combi ned cycle base load (PM) op eration聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行1. Combi ned cycle base load (PM) op era- tion聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行CEMS ready to PM base loadCEMS準(zhǔn)備PM基本負(fù)荷Day 17 第17天 11/24/2006Reliability run 168hrs, 6 day可靠 性運(yùn)行 168小

39、 時,第6 天1. Combi ned cycle base load (PM) op eration聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行1. Combi ned cycle base load (PM) op era- tion聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行CEMS ready to PM base loadCEMS準(zhǔn)備PM基本負(fù)荷Day 18 第18天11/25/2006Reliability run 168hrs, 7 day可靠 性運(yùn)行 168小 時,第7 天1. Combi ned cycle base load (PM) op eration聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行1. Comb ine

40、d cycle base load (PM) op era- tion聯(lián)合循環(huán)基本負(fù)荷(PM)運(yùn)行2. Normal shut dow n after compl eti on of 168 hours reliability run test168 小時可靠 性運(yùn)行試驗(yàn)完成后正常停機(jī)CEMS ready to PM base loadCEMS準(zhǔn)備PM基本負(fù)荷Day 19 第19天 11/26/20068 days start up and shut dow n daily, 1 day 每天起動8 days start up and shut dow n daily 每天起動和停機(jī),共8天8

41、 days start up and shut dow n dail y 每天起 動和停機(jī),共8天8 days start up and shut dow n daily 每天起動 和停機(jī),共8天和停機(jī), 共8天,第1天Day/Date天/日期Test試驗(yàn)P urpose of Test試驗(yàn)?zāi)康腢nit activities 機(jī)組活動Remarks 備注Day 20 第20天 11/27/20068 days start up and shut dow n daily, 2 day1 day每天 起動和停 機(jī),共8 天,第2 天8 days start up and shut dow n da

42、ily 每天起動和停機(jī),共8天8 days start up and shut dow n daily 每天起 動和停機(jī),共8天8 days start up and shut dow n daily 每天起動 和停機(jī),共8天Day 21 第21天11/28/20068 days start up and shut dow n daily, 3 day1 day每天 起動和停 機(jī),共8 天,第3 天8 days start up and shut dow n daily 每天起動和停機(jī),共8天8 days start up and shut dow n daily 每天起 動和停機(jī),共8天8

43、days start up and shut dow n daily 每天起動 和停機(jī),共8天Day 22 第22天11/29/20068 days start up and shut dow n daily, 4 day1 day每天 起動和停 機(jī),共8 天,第4 天8 days start up and shut dow n daily 每天起動和停機(jī),共8天8 days start up and shut dow n daily 每天起 動和停機(jī),共8天8 days start up and shut dow n daily 每天起動 和停機(jī),共8天Day 23 第23天 11/30/2

44、0068 days start up and shut dow n daily, 5 day1 day每天 起動和停 機(jī),共8 天,第5 天8 days start up and shut dow n daily 每天起動和停機(jī),共8天8 days start up and shut dow n daily 每天起 動和停機(jī),共8天8 days start up and shut dow n daily 每天起動 和停機(jī),共8天Day/Date天/日期Test試驗(yàn)Purpose of Test試驗(yàn)?zāi)康腢nit activities 機(jī)組活動Remarks 備注Day 24 第24天 12/01

45、/20068 days start up and shut dow n daily, 6 day1 day每天 起動和停 機(jī),共8 天,第6 天8 days start up and shut dow n daily 每天起動和停機(jī),共8天8 days start up and shut dow n daily 每天起 動和停機(jī),共8天8 days start up and shut dow n daily 每天起動 和停機(jī),共8天Day 25 第25天 12/02/20068 days start up and shut dow n daily, 7 day1 day每天 起動和停 機(jī),共8

46、 天,第7 天8 days start up and shut dow n daily 每天起動和停機(jī),共8天8 days start up and shut dow n daily 每天起 動和停機(jī),共8天8 days start up and shut dow n daily 每天起動 和停機(jī),共8天Day 26 第26天 12/03/20068 days start up and shut dow n daily, 8day1 day每天 起動和停 機(jī),共8 天,第8 天8 days start up and shut dow n daily 每天起動和停機(jī),共8天8 days star

47、t up and shut dow n daily 每天起 動和停機(jī),共8天8 days start up and shut dow n daily 每天起動 和停機(jī),共8天Day 27 第27天 12/04/2006No Test 沒有試驗(yàn)Cooling 冷卻Cooling for water wash 冷卻準(zhǔn)備水洗In stall p erforma nee test equipments 安裝性能 試驗(yàn)設(shè)備Day 28 第28天 12/05/2006No Test 沒有試驗(yàn)Cooling 冷卻Cooling for water wash 冷卻準(zhǔn)備水洗In stall p erforma

48、nee test equipments 安裝性能 試驗(yàn)設(shè)備Day/Date天/日期Test試驗(yàn)Purpose of Test試驗(yàn)?zāi)康腢nit activities 機(jī)組活動Remarks 備注Day 29 第29天 12/06/2006Off line water wash 脫 機(jī)水洗Off line water wash 脫機(jī)水洗Off line water wash 脫機(jī)水洗Off line water wash 脫機(jī)水洗Day 30 第30天 12/07/2006In tegrated DLNTuning 整 體DLN調(diào)整In tegrated DLN Tuning for part load 部 分負(fù)荷整體DLN調(diào)整In tegrated DLN Tuning for part load 部分負(fù)荷 整體DLN調(diào)整Collect data收集數(shù)據(jù)Day 31 第31天 12/08/2006No Test沒有試驗(yàn)Cooling 冷卻Cooling for water wash 冷卻準(zhǔn)備水洗Day 32 第32天 12/09/2006No Test 沒有試驗(yàn)Cooling 冷卻Cooling for water wash 冷卻準(zhǔn)備水洗Day 3

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論