1、METHORD STATEMENT FOR CABLE TRAY INSTALLATION電纜橋架施工方案版本Rev.編制Prepared by審核Reviewed by批準(zhǔn)Approved by認(rèn)可Accepted byContents目 錄、 工程概述1General1、適用范圍1Scope of work1、 編制依據(jù)1References1、 施工準(zhǔn)備2Preparation for construction25、 橋架安裝技術(shù)要求4Technical Requirements for Cable Tray Installation4、 橋架施工工序8Cable tray instal
2、lation procedure8、 施工詳細(xì)描述8Installation description8、 施工注意事項(xiàng)及措施11Construction precaution and measurement to be taken119、施工特別措施13Special measurement to be taken in construction1310、 腳手架搭設(shè)描述及注意事項(xiàng)15The procedure of setting up scaffold and precaution1511、(JHA)25工作安全分析25 可修改 歡迎下載 精品 Word、 工程概述General為了保證電
3、纜橋架安裝工作正常有序地進(jìn)行,力求施工周期最短、確保技術(shù)、安全可靠的方案編制原則,根據(jù)國(guó)家、業(yè)主的規(guī)范要求,特編制此電纜橋架安裝施工方案,以說明安裝過程中施工方法、施工用料、施工順序。In order to ensure normal and proper field installation for electrical and instrument cable tray safe successful completion of the work, this installation procedure is specially prepared as per the national s
4、tandards and the Owners specification requirements in the principle of lowest construction cost, shortest construction duration and safe reliable technology to elaborate the installation construction method, construction materials and installation sequence、適用范圍Scope of work 本方案適用于拜耳聚碳酸酯SPCII/LOGII項(xiàng)目
5、橋架施工,包括管廊橋架、B204區(qū)域、B244區(qū)域、B209區(qū)域、B252區(qū)域、B221區(qū)域、B222區(qū)域橋架施工及其它區(qū)域橋架施工。This scope describes the activities to be performed by the Contractor for the Works and Services as specified below for Bayer SpcII/LogII cable tray installation, including outside pipe rack area, B204, B252,B209,B244,B221,B222 area
6、and other area which need to be constructed.、 編制依據(jù)References3.1 設(shè)計(jì)圖紙及及相關(guān)技術(shù)文件Design drawing and Relevant documents3.2 國(guó)家及BAYER公司相關(guān)規(guī)程、規(guī)范、標(biāo)準(zhǔn)National codes & standards, relevant Bayer specifications3.3 建筑電氣工程施工質(zhì)量驗(yàn)收規(guī)范GB50303-2002Code of acceptance of construction quality electrical installation of bu
7、ilding3.4 電氣裝置安裝工程爆炸和火災(zāi)危險(xiǎn)環(huán)境電氣裝置施工及驗(yàn)收規(guī)范GB50257-96Construction & Acceptance Code for Electrical Device Installation in Explosive and Fire Hazard Environment3.5 自動(dòng)化儀表工程及驗(yàn)收規(guī)范GB50093-2002Construction & Acceptance Code for Automatic Instrumentation Works3.6 自動(dòng)化儀表安裝質(zhì)量檢驗(yàn)評(píng)定標(biāo)準(zhǔn)GBJ131-90Quality Inspecti
8、on & Assessment Standard for Automatic Instrumentation Installation、 施工準(zhǔn)備Preparation for construction4.1、 技術(shù)準(zhǔn)備 Preparation for technical method4.1.1 熟悉圖紙和相應(yīng)的國(guó)家標(biāo)準(zhǔn)規(guī)范,會(huì)同設(shè)計(jì)及業(yè)主較早完成對(duì)圖紙問題的澄清,并完成施工方案和特殊技術(shù)措施的編制;Be familiar with drawing and relevant national specification, timely clarify any question abou
9、t drawing jointly with AKC and complete construction plan and special technical measures;4.2 人員準(zhǔn)備Preparation for person 4.2.1進(jìn)入施工現(xiàn)場(chǎng)作業(yè)的人員應(yīng)具備相應(yīng)的施工資質(zhì);Personnel preparation: after entering onto site and prior to working, carry out safety training to all construction personnel and clarify all technical d
10、etails;4.2.2 對(duì)進(jìn)入現(xiàn)場(chǎng)作業(yè)人員進(jìn)行安全培訓(xùn)和施工技術(shù)交底;The person who enter into site and do construction work will be trained in the safety and accepted technical clarification.4.3 材料準(zhǔn)備Preparation for material 4.3.1根據(jù)合同內(nèi)容和施工圖紙資料,準(zhǔn)確的提出施工主材和消耗性材料用量以及時(shí)開展采購(gòu)工作;Material preparation: since short construction period and tigh
11、t time, it shall accurately work out primary construction material and consumptions according to contract and drawing to timely carry out procurement;4.3.2 本工程中,管廊上電纜橋架(600mm以上)采用熱鍍鋅鋼質(zhì)托盤式,B204廠區(qū)內(nèi)電纜橋架(600mm)采用熱鍍鋅鋼質(zhì)托盤式,電氣橋架(300mm)采用熱鍍鋅鋼質(zhì)梯架式,儀表橋架(300以下)采用不銹鋼格柵式。B252廠區(qū)內(nèi)電氣橋架(300mm)以上使用梯架,以下使用隔柵式橋架,儀表橋架(3
12、00mm)以上使用托盤式橋架、以下使用隔柵式橋架。其中電纜橋架(600mm及以上)由業(yè)主供應(yīng), 電纜橋架(600mm以下)由承包商供應(yīng);In this project, equal to and more than 600mm hot galvanized steel cable tray will be adopted on the outside pipe rack and 600mm hot galvanized cable tray will be installed for electrical and 300mm hot galvanized cable ladder will b
13、e installed for electrical, 300mm stainless steel grid cable tray for instrument inside room in B204 area; cable ladder will be used in more than 300mm and stainless steel grid tray will be used in equal and less 300mm for electrical in B252 area; channel tray will be used in more than 300mm and sta
14、inless steel grid tray will be used in equal and less 300mm for instrument in B252 area; cable tray(600mm and above) will be supplied by the owner, less 600mm cable tray will be purchased by contractor. 4.3.3 電動(dòng)工具、測(cè)試儀器應(yīng)符合BAYER的使用要求,工機(jī)具的使用應(yīng)有效期內(nèi);Machinery, tool and test instrument preparation: the ele
15、ctric tool and standard test instrument shall be in compliance with AKC requirement and within valid period;4.4 驗(yàn)收及保管Acceptance and keeping4.4.1 電纜橋架到場(chǎng)后應(yīng)及時(shí)進(jìn)行材料驗(yàn)收; Materials acceptance shall be done in a timely manner for cable tray after delivery to site.4.4.2 檢查廠家技術(shù)文件、合格證和質(zhì)保書是否齊全。出廠產(chǎn)品數(shù)據(jù)是否符合設(shè)計(jì)要求;The
16、 manufacturers technical documents, certificates of compliance and quality certificates shall be checked for completeness and the product data be checked for compliance with the design requirements;4.4.3 橋架及附件齊全、表面光滑、不變形,型號(hào)規(guī)格符合設(shè)計(jì)要求。The cable tray and accessories shall be complete and have smooth and
17、 undeformed surface. The type and specification shall comply with the design requirements. The cable tray section at the bends and joints shall be smooth and free of burrs;4.4.4 驗(yàn)收合格的材料應(yīng)分型號(hào)、規(guī)格擺放,便于材料領(lǐng)用。 Qualified material by acceptance will be stored by type and specification in order to convenience
18、 for using.4.5 施工主要工程量及主要施工材料Main work load and materials in construction序號(hào)No.名稱Description規(guī)格及型號(hào)specification單位Unite數(shù)量Quantity備注Remark1熱鍍鋅鋼質(zhì)梯架Hot galvanized steel ladder600×150米 m2002熱鍍鋅鋼質(zhì)梯架Hot galvanized steel ladder300×150米m5003熱鍍鋅鋼質(zhì)梯架Hot galvanized steel ladder400×150米m1004不銹鋼隔柵橋架S
19、tainless steel grid tray300×150米m15005不銹鋼隔柵橋架Stainless steel grid tray200×100米m10006不銹鋼隔柵橋架Stainless steel grid tray 100×50米m25007熱鍍鋅鋼質(zhì)托盤Hot galvanized steel tray600×150米m1008熱鍍鋅鋼質(zhì)托盤Hot galvanized steel tray900×150米m309熱鍍鋅鋼質(zhì)托盤Hot galvanized steel tray400×150米m6010C型鋼C s
20、teelP4141米m20005、 橋架安裝技術(shù)要求Technical Requirements for Cable Tray Installation5.1 嚴(yán)格按設(shè)計(jì)圖紙施工。安裝前與工藝、設(shè)備等專業(yè)圖紙進(jìn)行會(huì)審,以免發(fā)生碰撞后,二次拆裝;The construction shall be performed strictly as per the design drawings. The drawings for process, equipment shall be reviewed before installation to avoid interference and re-wo
21、rk;5.2 橋架及其支架和引入、引出的網(wǎng)格橋架必須可靠連接且應(yīng)符合下列規(guī)定:Cable tray and its supports and its branch grid tray shall be reliably connected and comply with the following specification:5.2.1 電纜橋架直線段每隔30米應(yīng)安裝一膨脹節(jié),并且在膨脹節(jié)處增加橋架跨接線;Expansion joint will be added in strait line segment at interval of 30m when cable tray be inst
22、alled and jumper wire will be connected from one cable tray to another in the place of expansion joint.5.2.2 電纜橋架在彎曲處的彎曲半徑,不得小于橋架內(nèi)電纜最小彎曲半徑;電纜最小彎曲半徑見下表: The bending radius of cable tray at the bend shall not be smaller than minimum bending radius of cable inside cable tray;Minimum bending radius of c
23、able sees the table as follow: 序號(hào)No.電纜種類Cable description最小允許彎曲半徑Minimum bending radius1聚氯乙烯絕緣電力電纜 VV cable10D2交聯(lián)聚氯乙烯絕緣電力電纜 YJV cable15D3多芯控制電纜 multi wire control cable10DD為電纜外徑 D- outside diameter5.2.3 電纜橋架支架水平安裝時(shí)支架間距不大于2.5米做一次固定,垂直安裝的支架間距不大于2米做一次固定,在有彎通或三通的地方則必須單獨(dú)增加支撐點(diǎn); For the cable tray support,
24、 if no requirements, the spacing for horizontal supports shall be 2.5m and that for vertical supports shall be no greater than 2m;individual support will be added in the elbow and tee.5.2.4 橋架支架與各種鋼結(jié)構(gòu)的連接都采用卡接方式,不得焊接,如若需焊接必須事先獲得業(yè)主的批準(zhǔn)認(rèn)可,方可施焊,焊接必須牢固可靠,且要對(duì)施焊的部位采用防腐處理;The support of cable tray connect to
25、 all kinds of steel structure with bolt , not allow to weld. The welding of brackets and supports with structural steel shall be approved by the Owner ahead of time and the welding shall be reliable and will be done anti-corrosive treatment for the welding point.5.2.5 橋架連接應(yīng)使用橋架廠家的連接片通過螺栓連接。螺栓應(yīng)帶有平墊片和
26、防松墊片,The cable trays shall be bolted with each other using the connection pieces supplied by the cable tray manufacturer. The bolt shall have flat washer and spring washer;5.2.6 橋架與橋架支架的連接用專用的橋架壓板,通過螺栓連接緊固; Special compressed plate will be adopted to connect cable tray and its support fastened by bo
27、lt.5.2.7 所有用螺栓緊固的材料、設(shè)備,在緊固前必須在螺桿上涂層放防卡劑; All kinds of material and equipment with bolt fastening should coat anti seize agent in the screw before fastening.5.3 電纜橋架敷設(shè)在易燃、易爆氣體管道和熱力管道的下方,與管道的最小凈距應(yīng)符合下表:The minimum clearance between the cable tray laid under the inflammable and explosive gas piping &
28、; thermal piping and the piping shall comply with the following table:Piping Classification管道類別Parallel Clearance (m)平行凈距(m)Overlapping Clearance (m)交叉凈距(m)Common Piping一般管道0.40.3Inflammable, Explosive Gas Piping易燃、易爆氣體管道0.50.5Thermal Piping熱力管道With Insulation有保溫0.50.3Without Insulation無保溫1.00.5不符合上
29、述要求時(shí)必須加裝隔熱板;Thermal baffle will be installed if not in line with above requirement.5.4 不同防火區(qū)的橋架,應(yīng)按設(shè)計(jì)要求,采取防火、隔離措施;Fireproof and isolation measures shall be taken for the cable trays laid inside vertical shaft or across different fireproof areas;5.5 對(duì)于SPCII廠房?jī)?nèi)部所有600mm寬的橋架,必須在橋架內(nèi)敷設(shè)一根95mm2的裸銅絞線作為接地線,然后分
30、別與SPCI主橋架內(nèi)95mm2的裸銅絞線相連接,對(duì)于主管廊上的橋架,應(yīng)在最上層電纜橋架內(nèi)敷設(shè)一根95 mm2的裸銅絞線作為接地線,并且分別與全廠接地網(wǎng)連接。電氣橋架必須有良好的電氣通路,橋架兩端并且每隔30m做一次接地線;95mm2 bare copper stranded wire as a earthling line will be laid in all 600mm cable tray inside the SPCII workshop and connected to another 95mm2 bare copper stranded wire in the SPCI cable
31、 tray. A piece of 95 mm2 bare copper stranded wire as a earthling line will be laid in the top cable tray of outside pipe rack and connected to main earthling net of factory. All cable tray should have good electric conductivity and earthling wire will be installed in each 30M in the cable tray.5.6
32、安裝結(jié)束后保證橋架不應(yīng)有明顯的波形彎或蛇形彎。在電纜安裝結(jié)束后,主管廊最上層橋架應(yīng)蓋上蓋板,廠房?jī)?nèi)部600mm寬的電纜橋架需加蓋板,300mm寬度及以下無需加蓋板;After completion of cable tray installation, it shall be ensured that there is no visible wave or snake type curve. After cable installation, the top cable tray shall be covered with plate;、 橋架施工工序Cable tray installati
33、on procedure施工準(zhǔn)備Preparation for installation支架預(yù)制Support pre-fabrication支架安裝Support installation 橋架預(yù)制Cable tray pre-fabrication橋架安裝Cable installation接地線安裝Earthling wire installation 、 施工詳細(xì)描述Installation description7.1 施工準(zhǔn)備詳見第4條;Preparation for Installation see above item 47.2 橋架支架預(yù)制Support of cable t
34、ray pre-fabrication7.2.1 根據(jù)橋架施工圖,合理安排橋架支架安裝位置,標(biāo)注好橋架支架安裝的具體位置,計(jì)算出每根支架的尺寸,在事先選好的C型鋼材上標(biāo)出相應(yīng)的位置;標(biāo)出后統(tǒng)一拿到預(yù)制場(chǎng)地加工,嚴(yán)禁在現(xiàn)場(chǎng)加工支架.對(duì)于裝納電纜容量大的橋架應(yīng)選用背靠背疊在一處的C型鋼支架,增強(qiáng)支架強(qiáng)度;We will arrange the reasonable location of support of cable tray and make label when we install it according to cable tray drawing, We will also calc
35、ulate each support size and draw detail position in the C steel we selected in advance. After finishing position in the c steel, support will be made in the pre-fabrication shop and avoid making support in the installation site. Double C steel support of back against back installed is adopted for he
36、avy load cable in the cable tray in order to reinforce strength. 7.2.2 切割時(shí)用砂輪切割機(jī)切割,嚴(yán)禁動(dòng)用氣焊、電焊切割,然后清除毛刺,并打磨光滑;Abrasive cutting machine will be used to cut support of cable tray and it is forbidden to use welding machine to cut. after finishing cutting, removing burrs and make it smooth.7.2.3 對(duì)預(yù)制加工部位噴上
37、鍍鋅漆,并對(duì)預(yù)制好支架做好標(biāo)識(shí);Galvanized lacquer will be sprayed in the processed part of support, sign will be made and put in the processed support.7.3 橋架支架安裝;Installation for support of cable tray7.3.1 對(duì)于建筑物內(nèi)安裝的橋架,應(yīng)在橋架末端和變高處先安裝橋架支架;The end and elbow position of cable tray as well as the place height varied wil
38、l be installed support first according to design requirement.7.3.2 然后在同一水平長(zhǎng)度段,以不超過20m為一間隔先安裝首尾兩個(gè)立柱,然后拉一直線,以此線為參照安裝中間其他立柱;Each 20M of cable tray firstly install two hanging bracket for the both end in the same horizontal length of cable tray , then draw a straight line, refer to this strait line, oth
39、er support can be installed between these two hanging bracket.7.3.3 對(duì)于安裝在鋼結(jié)構(gòu)上的支架,直接用卡扣卡在鋼結(jié)構(gòu)上,用螺栓緊固,不得焊接;Support installed in the steel structure will be used clamp and bolt to install not allow to welding.7.3.4 吊頂安裝在樓面的支架,先標(biāo)出需要打眼部位,用沖擊電錘鉆出合適的孔洞,通過內(nèi)膨脹螺栓固定預(yù)制好的支架;If bracket need to install in the struc
40、ture ceiling, firstly draw hole position and make hole with electric punch hammer drill, then bracket be fixed by expansion bolt.7.4 橋架預(yù)制Cable tray prefabrication7.4.1 橋架預(yù)制都在預(yù)制場(chǎng)地進(jìn)行,預(yù)制橋架過程中,只允許用切割機(jī)進(jìn)行切割,嚴(yán)禁用電焊、氣焊切割,切割完后清楚毛刺并打磨光滑;the cable tray will be prefabricated in the prefabrication shop. abrasive
41、cutting machine will be used to cut prefabricated cable tray and it is forbidden using welding machine to cut. after finishing cutting, removing burrs and make it smooth.7.4.2 Galvanized lacquer will be sprayed in the processed part of cable tray.對(duì)于鍍鋅橋架,應(yīng)在預(yù)制處噴涂鍍鋅漆;7.4.3 不準(zhǔn)用電焊直接把兩段橋架焊在一起;It is forbid
42、den to connect two cable tray with welding method.7.5 橋架安裝Installation for cable tray7.5.1 橋架安裝前應(yīng)盡量在地面進(jìn)行預(yù)組裝;對(duì)于管廊處大跨距橋架,直接在支架上安裝;The cable tray will be assembled in the floor as best as we can before installation.7.5.2 在地面預(yù)組裝完后,將橋架架上托臂,把橋架調(diào)整水平,然后用壓板固定;After finishing assemble, cable tray will be put
43、on the bracket arm, then make leveling and fixed by clamping plate.7.5.3 橋架固定應(yīng)牢固,連接無錯(cuò)邊,連接板螺栓應(yīng)緊固且螺母應(yīng)位于橋架槽的外側(cè),螺帽應(yīng)安裝在內(nèi)側(cè)。The cable tray will be firmly fixed, there is no change in the connection joint; bolt will be tighten in the connection plate and nut will be outside in the cable tray, head of bolt w
44、ill be inside in the cable tray.7.5.4 連接螺栓前應(yīng)在螺栓上噴上防卡劑;Before connecting bolt, anti block agent will be sprayed in the bolt.7.5.5 同一水平面橋架水平度要一致、無變形,多層橋架間距應(yīng)保持一致;The horizontality should be the same in the same horizontal and no deformation; The distance of cable tray between layer should keep the same
45、.7.5.6 橋架穿越樓板洞、墻洞,應(yīng)用防火膠泥密封;Cable tray through floor hole and wall hole,fire proof clay will be used to seal hole after cable to be laid.7.6 橋架接地線敷設(shè)Laying earthling wire of cable tray.7.6.1 橋架安裝完后,應(yīng)對(duì)橋架做接地處理,詳見第5.5條After cable tray be installed, earthling of cable tray will be done according to techni
46、cal requirement. see item 5.5、 施工注意事項(xiàng)及措施Construction precaution and measurement to be taken8.1 SPCII電纜橋架安裝大部分是在生產(chǎn)與施工的環(huán)境下同時(shí)進(jìn)行,務(wù)必要求所有進(jìn)入生產(chǎn)區(qū)域現(xiàn)場(chǎng)施工的人員不得接觸任何與施工無關(guān)的設(shè)備,并且嚴(yán)禁碰撞生產(chǎn)設(shè)備、管線,施工用的材料只能堆放在指定的場(chǎng)所,當(dāng)日施工結(jié)束后,必須清掃干凈;In SPCII project, cable tray be installed is under production and operation environment in the
47、same workshop, It is required that all construction people can not touch any irrespective equipment with construction and forbidden to hit any production equipment and pipe. The material using for construction only put appointed site. Work finished every day, construction site should be cleaned.8.2
48、生產(chǎn)區(qū)域內(nèi)介質(zhì)都為有毒的液體、氣體或粉末狀物質(zhì),在建筑物內(nèi)生產(chǎn)區(qū)域施工時(shí),應(yīng)設(shè)置警戒線,只能在規(guī)定的警戒線范圍內(nèi)施工;從管廊進(jìn)入B204區(qū)域橋架施工時(shí),應(yīng)在施工區(qū)域內(nèi)搭設(shè)防護(hù)欄,并且派專人看管,施工時(shí)嚴(yán)禁動(dòng)用電焊或氣焊;There are a lot of poisonous gas and liquid material in production area, guarding line will be set up in construction area of inside building. Construction only be made within stated guardin
49、g line. When cable tray be installed from outside pipe rack into B204 area, guard rail will be established in this construction area and should have person to be in charge. Welding will be prohibited in the construction. 8.3 在防爆區(qū)域內(nèi)施工時(shí),要求所有施工用電器設(shè)備都具有防爆功能,所用的臨時(shí)施工電源要求使用防爆插座,并配置防爆插頭;When construction ma
50、de in the anti-detonation area, It is required that all electrical appliance for construction should have explosion proof function and all temporary power should use explosion proof receptacle and plug.8.4 在生產(chǎn)區(qū)域施工時(shí),施工用電源線不能直接跟運(yùn)行設(shè)備、管線接觸,應(yīng)加工電纜掛鉤掛臨時(shí)電源線,掛鉤也不能掛在設(shè)備及管線上,并且掛鉤上應(yīng)用塑料套管隔離。When construction made
51、 in the production area, power cable for temporary construction can not touch operation equipment and pipe. Leased clamp be used for hanging the temporary power cable and can not hang on the equipment and pipe.8.5 在對(duì)有電纜在內(nèi)的橋架開槽時(shí),應(yīng)把運(yùn)行電纜隔離開,嚴(yán)禁損壞一期原有電纜,采取的防護(hù)措施如下:在需切割的部位事先放上C形狀的薄鐵板,然后用防火布覆蓋,并且在橋架下方鋪設(shè)一層防火
52、布,再用砂輪切割機(jī)切割,切割后清除毛刺,并打磨光滑;When we need to make duct in the cable tray with living cable, cable with electricity will be unplugged and not allowed to damage existing cable, measure will be taken as follow: the places we need to cut should put a pieces of C type thin steel plate in advance, then cover
53、 a piece of fire proof cloth on the steel plate and put fire proof cloth under cable tray at the same time, then we can cut hole with abrasive cutting machine , after cutting, remove burry and make it smooth.8.6 從B196至B204廠房間的橋架都位于室外管廊上,且屬于高空作業(yè), 除了遵守相應(yīng)的高空作業(yè)規(guī)定外,霧天、雨天應(yīng)禁止在管廊上施工作業(yè);Some installation from
54、 B196 to B204 in the outside pipe rack is aloft work, except following relevant regulation of aloft work, it should be prohibited in the rain and fog weather.8.7 在生產(chǎn)區(qū)域施工時(shí),禁止利用原有的電纜橋架、工藝管線或風(fēng)道及設(shè)備來搭設(shè)跳板,嚴(yán)禁踩踏;It should be prohibited to use exist cable tray and pipe or ventilation duct to set up sleeper a
55、nd to trample the equipment in the production area.8.8 在生產(chǎn)區(qū)域動(dòng)火作業(yè)時(shí)(包括用電錘、電鉆、磨光機(jī)等用電設(shè)備)必須有專人監(jiān)護(hù),且必須事先準(zhǔn)備好消防器材; There are special people to supervise when hot work( including using electric hammer and drill as well as grater etc ) to be done in the production area, at the same time, fire-fighting apparatu
56、s will be prepared in advance.8.9 在B196、管梁上、B204生產(chǎn)區(qū)域內(nèi)施工時(shí)必須開操作票,辦理工作許可證,無證嚴(yán)禁施工 Before job performed in the B196 area, outside pipe rack, B204 production area, operating sheet and permitting work certificate should be done, if no this kinds of certification, it is prohibited that not allowed to work in above area. 9、 施工特別措施Special measurement to be taken in construction9.1 在B196區(qū)G36G37軸線安裝時(shí),在+6.75米處用900×150橋架同原有預(yù)留橋架連接,通過管廊鋼梁做支架立柱,把C型鋼用卡扣固定在鋼梁上做橋架支架,升至14.0米后跟NO. 1.7橋架支架處橋架連接,連接時(shí)需在橋架開槽,開槽時(shí)應(yīng)參照第8.5條;在施工作業(yè)前,需搭設(shè)腳手架,腳手架操作平臺(tái)搭設(shè)區(qū)域見附圖1,樣式圖見附圖2;When we
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 江蘇蘇州2024~2025學(xué)年高二下冊(cè)6月期末考試數(shù)學(xué)試題含解析
- 地方特色教育課程與公民素養(yǎng)教育融合考核試卷
- 2025年中國(guó)PE信封粘膠袋數(shù)據(jù)監(jiān)測(cè)研究報(bào)告
- 2025年中國(guó)LCD彩色監(jiān)視器數(shù)據(jù)監(jiān)測(cè)研究報(bào)告
- 2025年中國(guó)DWDM密集波分復(fù)用測(cè)試儀數(shù)據(jù)監(jiān)測(cè)研究報(bào)告
- 2025年中國(guó)6毫米CNG高壓鋼管PVC數(shù)據(jù)監(jiān)測(cè)研究報(bào)告
- 2025年中國(guó)16路混合器數(shù)據(jù)監(jiān)測(cè)報(bào)告
- 2025至2030年中國(guó)高真空擴(kuò)散泵油市場(chǎng)分析及競(jìng)爭(zhēng)策略研究報(bào)告
- 2025至2030年中國(guó)防毒面具箱市場(chǎng)分析及競(jìng)爭(zhēng)策略研究報(bào)告
- 2025至2030年中國(guó)針型皮帶扣市場(chǎng)分析及競(jìng)爭(zhēng)策略研究報(bào)告
- 員工筆記本電腦租用協(xié)議書律師版(4篇)
- 機(jī)械原理課程設(shè)計(jì)-旋轉(zhuǎn)型灌裝機(jī)
- 手術(shù)風(fēng)險(xiǎn)評(píng)估制度表及流程優(yōu)質(zhì)資料
- 塑料模具課程設(shè)計(jì)-罩蓋模具設(shè)計(jì)畢業(yè)論文
- ktv包房服務(wù)員崗位職責(zé)8篇
- 西安某大跨度鋼桁架人行天橋結(jié)構(gòu)設(shè)計(jì)分析
- 初中學(xué)段勞動(dòng)任務(wù)清單(七到九年級(jí))
- 色溫-XY-UV色坐標(biāo)換算公式
- 小紅書寵物行業(yè)月報(bào)
- 國(guó)企治理三會(huì)一層詳解
- YY 0731-2009大型蒸汽滅菌器手動(dòng)控制型
評(píng)論
0/150
提交評(píng)論