1、精選優(yōu)質(zhì)文檔-傾情為你奉上Translation:Construction Contract  Party A:  (Developer)Party B:  (Contractor)This contract is signed by the two Parties Party A and Party B according to the Contract Law of the

2、 Peoples Republic of China, the Contraction law of the Peoples Republic of China , and other relevant national laws and regulations, as well as the specific nature of this project. On the ba

3、sis of honesty and credit, equality, voluntariness, party A and party B have reached consensus through negotiations and signed this contract. 1. Project Introduction  1.1Name of Project: 1.2Location of Project: From to .1.3Scope and content of the

4、60;project:  .1.4The design of construction drawings: .2. Nature of Contracting: Contract for labor and materials .3. Construction period This project will take 20 days after the receive of the beginning notice from Party A (including reception time after completion),and includin

5、g the beginning date and completion date.4. Quality of Project Quality of Project: qualified .5. Contract Amount5.1Contract Amount: be RMB 400,000 Yuan tentatively (The actual settlement shall prevail).5.2Adjustment of contract amount: .6. Final Audi

6、t of the project6.1The condition and steps for Party A pay the project funds to Party B:Party A agrees to pay Party B for RMB150,000Yuan three days after the beginning of the project,the balance will be paid 97% after the qualified completion, and 3% warranty guarantee fee will be paid one

7、 years if there is no quality problem.6.2Mode of payment: .6.3Party B shall submit to Party A equivalent invoice before Party As each period payment, otherwise, Party A can refuse to pay until the receiving of the Party Bs invoice.6.4The invoice provided by Party B should be valid. Any fal

8、ls invoice provided by Party B which are found by relevant office, the Party B should not only provide the valid invoice to Party A, but also bear the responsible caused by the invalid invoice.7. Variation of design and visa 7.1During the process of the project, any con

9、tract list, technology checking list ( not include the variation, addition, substitution, and reduction on the drawings and project fee) concerning about this project shall only be regarded as effective with the confirmation of the representative Party A in writing

10、. 7.2 Any variation notice list, technology checking list, contract list, technology checking list ( include the drawings design) concerning about this project shall only be regarded as effective with the confirmation of the seal of Party A. 7.3In the event of Party

11、0;B fails to complete the project according to the drawing variation, Party B shall pay to Party Aas penalty for the breach.Party B will also bear the responsible and the reworking fee caused by the c

12、ontinued working regardless of the new design. 7.4Party B shall take full responsibility for any loss caused by delaying for more than  days applying for extension vise from Party A days after the receiving of changed design.

13、 8. Acceptance and Final Audit of the project8.1 Acceptance of the project8.1.1This project should meet the national quality acceptance standards and should be accepted at the first inspection af

14、ter completion. The Quality Acceptance Criteria of Construction of nation must be regarded as the acceptance standards for the project. Party B shall inform Party A in writing of a

15、ll kinds of inspection and acceptance  within 3 days.Party A shall arrange inspection and acceptance within  3  working days after receiving the notification.8.1.2Party B shall be&

16、#160;responsible for the re-inspection cost, and the project period shall not be extended.8.2 Final Audit of the projectIf the result of re-inspection has passed acceptance standards,&#

17、160;Party B shall submit the audit report and materials to Party A for verification within 7 days. (the materials include ).9. Obligations of Party A and Party B9.1. Obligations of Party A: 9.1.1.Party A appoints   as the on-site representative 

18、to supervise the fulfillment of contract obligations, to oversee the quality control and check the project progress, and to handle issues such as acceptance and variations and

19、 withdraw the representative at any time.9.1.2. Days before beginning of the project, Party A shall provide Party B .9.1.3. Party A shall confirm the variation and suggestion days after providing to design drawings and scheme to Party B. 9.1.4.Party A shall be responsible for coordinating the relati

20、onship with the engining. 9.2. Obligations of Party B9.2.1.Party B appoints WangZhirong as the on-site representative of Party B to take charge of fulfilling the contract obligations. The on-site 

21、;representative of Party B shall organize the construction according to contract requirements so that the project can be completed according to the quality and quantity requir

22、ements and on a timely manner.9.2.2.Party B shall observe safety policies of on-site management by the state and Guangxi , Nanning government authorities and shall independently and fully assumes responsible for the

23、 loss caused by violation. 9.2.3Party B shall observe policies of on-site management by the state and local government authorities as well as Party A's rules and regulations; Party&

24、#160;B shall compensate for the losses to any facilities, equipment or pipelines both inside and outside of the construction yard caused by party B. 9.2.4.During construction,

25、 Party B should make such adjustment to the construction plan and the progress schedule per Party A's instruction and change-orders.9.2.5. Party B should transfer the construction site w

26、ithin days after the qualified completion. 10.Agreement on SafetyParty B must strictly adhere to the Safety and Technical Standards of Construction and Infrastructure Installation and regulation of China, Guangxi Zh

27、uang Autonomous Region, Nanning Safety Standards  and other relevant regulations and standards.the construction spot should meet all standards  of the People's Republic of China. And bearing the safety

28、 fees which are not caused by party A.11.The concerning material supply 11.1. Party A or Party B should be responsible for the material ,equipments,which should meet the qualified design request with qualification guarantee books.11.2. Any material,equipment which is bought by the Party B, if not ag

29、ree with the quality request or specification contain difference,should forbid any usage.the Party B should rebuy the equipment and bear the responsibility to make sure no delay on the project.if Party B refuses to change the materials, Party A has the right to terminate the contract and asks for lo

30、ss from Party B.11.3 Any material,equipment which is bought by the Party A, if not agree with the quality request or specification contain difference,should forbid any usage.the Party A should rebuy the equipment and bear the responsibility to make sure no delay on the project.12. Warranty12.1.Warra

31、nty scope: as state in the contract.12.2.Warranty period: 1 year after the qualified completion.12.3During the warranty period, Party B shall fix within 2 days after receiving the notice from Party A. In the event of Party B fails to fix the defects

32、on a timely manner, Party A has the right to hire a third Party to do the repair, and any costs incurred shall be burdened by Party B.12.4. Mode of notices: phone, fax, e-mail, and so on.12.4.1 in the way of call the phone or faxing: Party B s TEL: ,Fax: . These contact ways will be regard

33、ed as the evidence of warranty notice to Party B after the calling and faxing.12.4.2.in the way of posting: Party B s address: . These contact ways will be regarded as the evidence of warranty notice to Party B after e-mailing.12.4.3. in the way of e-mailing: Party B s e-mail: . These cont

34、act ways will be regarded as the evidence of warranty notice to Party B after e-mailing.12.4.4. The fees of noticing Party B will be borne by Party B.12.5. Project quality retention fee(tip: the blue words will be suite for under the condition of withing the Project quality retention fee)12.5.1

35、Project quality retention fee: , which will be deduce from the project funds of Party B.12.5.2 After the expire date, Party A will return the rest of the quality retention fees without interest to Party B. This will be applied by Party B within ten days after the completion of qualified project.13.

36、Liabilities for Breach13.1.In the event of Party A fails to make payment according to the payment terms, Party A should pay a late fee to Party B;  Daily r

37、ate of the late fee is  % of the   payment. If the delay of the payment is caused by Party A and is delayed for more than   days, then Party 

38、;B can terminate this contract.13.2In the event of Party B fails to complete the project according to the construction period in the contract, Party B shall pay % of

39、 the total contract amount for each day overdue as penalty for the breach. Daily rate of the late fee is  % of the  payment.13.3.Party A can terminate this

40、 contract and Party B shall take full responsibility for any loss caused by this when one of these condition takes place.13.3.1 Overdue over days.13.3.2Party B  transfers the contract and any

41、0;part of the contract and its corresponding to any third party without Party A's consent in writing. 13.3.3.Be ordered to shut down by the administrative organ caused by Party B over days.13.3.4.Safety and qual

42、ity accidents.13.3.5. The materials provided by Party B differs from the QA certificate and the Report of Quality Assurance Test. And Party B can not make change on these material.13.4.Party B sh

43、ould make salary/wages payment to all construction staffs in time on a monthly basis, and will be fully responsible for any liabilities caused by any loss or damage&

44、#160;to Party A as a result of Party B's failure to pay salaries and wages according to the requirements. In the event of migrant workers create a disturbance on group site, Party A'

45、s premises, office space, Party B should paid penal sum Yuan each time. 13.5.In the event any Party shall fail to complete the work in time owing to reasons that the contractor shall be held liab

46、le, the Party shall pay a penalty for RMB Yuan, and bear all be loss of the other Party.13.6. penal sums and other penalty fees that Party B should to Party A , Party A can take out the same amount of money directly from the project fees. (including quality retention

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

最新文檔

評論

0/150

提交評論