海上風(fēng)電項(xiàng)目設(shè)計(jì)案例IfandwhenpriceauctionsareimplementedinChina….letusworktogethertomeettherequirementforlowerpricesofthe

electricity如果中國的海上風(fēng)電項(xiàng)目施行競價招標(biāo)….讓我們一起努力,滿足低上網(wǎng)電價的要求Acasestudyaboutoptimizationofthedesignpartofa

project一個海上風(fēng)電項(xiàng)目設(shè)計(jì)優(yōu)化的案例研究2018OFFSHOREWINDSUMMIT

FUZHOUJUNE14,

2018RAMBOLL

WIND/RAMBOLL風(fēng)電13,000staffengineering

consultant/13,000名工程顧問員工300staffwithinwindenergyengineering/300名員工從事風(fēng)能工程咨詢Multidisciplinary

engineering

within

wind/提供風(fēng)能多學(xué)科工程咨詢Detaileddesignformorethan50offshoreprojects

Worldwide/全球范圍內(nèi)完成超過50個海上風(fēng)電項(xiàng)目的詳細(xì)設(shè)計(jì)Detaileddesignfor11offshore

transformerplatforms/完成11個海上升壓站平臺的詳細(xì)設(shè)計(jì)DetailedDesignfor4Chineseoffshore

windprojects/完成4個中國海上風(fēng)電項(xiàng)目的詳細(xì)設(shè)計(jì)CooperationwithChinesedesigninstitutes,ChinesecontractorandChineseTurbineVendors/與中國的設(shè)計(jì)院、承包商和風(fēng)機(jī)供應(yīng)商合作ChinesenationalwindengineerinourofficeinShanghai/上海辦公室雇傭中國風(fēng)能工程師PROJECT

INFORMATION.

CURRENT

DESIGN/項(xiàng)目信息.當(dāng)前設(shè)計(jì)General

information

fromclient/客戶提供的基本信息:Distance

to

shore:28kmto

42km

/

離岸距離:28km~

42kmWater

depths:

23m

to

32m

/

水深:

23m~

32mDepthofuppersiltlayer,measuredfromtheseabedlevel:3mto12m

/上層淤泥層厚度:

3m~12mWindturbine:5to6MWclassthree-bladedup-windturbines.300MWintotal

/

風(fēng)電機(jī)組:5~

6MW3葉片上風(fēng)向風(fēng)機(jī),總裝機(jī)容量為300MWWind

turbine

foundations

info.

received

fromclient/客戶提供的風(fēng)機(jī)基礎(chǔ)信息:Plannedfoundationtype:Jackets,four-leggedapprox.weight890tonsFoundationpiles:Averageweightofasinglepileis210tonsandlength85m)

/

擬采用基礎(chǔ)類型:四樁導(dǎo)管架基礎(chǔ),導(dǎo)管架平均重量890噸,4個小樁平均重量210噸,長度85mFoundation

type

suggested

by

Ramboll:

Monopiles/Ramboll建議基礎(chǔ)類型:單樁基礎(chǔ)Offshore

Substation

info.

received

from

client

/客戶提供的海上升壓站信息:Foundation

type:Jacket,

four-legged.

Approx.

weight

2100tons

/

基礎(chǔ)類型:四樁導(dǎo)管架基礎(chǔ),大概重量2100噸Foundationjacketpiles:Averageweightofsinglepile160tonsand

length82m

/

導(dǎo)管架基礎(chǔ)樁:單個樁平均重量160噸,長度82mTopside:

Totalweight

Approx.

3500

tons

/

上部組塊:總重量約為3500噸POTENTIAL

SAVINGS

ON

WTG

FOUNDATIONS/風(fēng)機(jī)基礎(chǔ)潛在優(yōu)化MostimportantWTGFoundationsavings/最重要的風(fēng)機(jī)基礎(chǔ)優(yōu)化工程量:Substitutingjacketsbymonopilesachievingreducedsteelcostandinstallation

cost

savings./單樁基礎(chǔ)取代導(dǎo)管架基礎(chǔ)降低鋼材成本和施工成本。Monopileweightwillbeinthesameorderofmagnitudeasthetotalpinpileweight,andtherebysavethecostsoftheentirejacket,savingsome600to700tonsofsteelperturbine

position./單樁基礎(chǔ)的重量與導(dǎo)管架4個小樁的總重量近似,因此可以節(jié)約整個導(dǎo)管架的重量,每個風(fēng)機(jī)機(jī)位可以節(jié)約600~700噸鋼材。Acceleratethefabricationandinstallation

schedule./減小加工制造和施工周期。Jacket MonopileMONOPILE

FOUNDATIONSDETAILEDDESIGN/單樁基礎(chǔ)的詳細(xì)設(shè)計(jì)SavingsachievedbyDetailedDesignoftheprimarysteelformonopilefoundations/單樁基礎(chǔ)主體鋼結(jié)構(gòu)的詳細(xì)設(shè)計(jì)降低成本:Load

iterations

forseveral

turbine

positions

in

the

wind

farm./選擇風(fēng)電場中幾個不同的機(jī)位進(jìn)行載荷迭代。Individualdesignforeachturbinepositioninordertooptimize

steelconsumption./為節(jié)約鋼材,每個機(jī)位基礎(chǔ)進(jìn)行單獨(dú)設(shè)計(jì)。Individual

design

of

each

steel

cansection

of

the

monopiles./單樁基礎(chǔ)的每個筒節(jié)截面進(jìn)行單獨(dú)設(shè)計(jì)。Optimizationofnumberofcircumferentialweldsbetweencansectionsofthe

monopiles./優(yōu)化單樁基礎(chǔ)不同筒節(jié)之間的環(huán)焊縫。SCFfactors

for

attachment

welds

to

the

primary

steel./主體鋼結(jié)構(gòu)上焊接預(yù)埋件的應(yīng)力集中系數(shù)計(jì)算。Driveability

analysis

forthe

individual

monopiles

to

save

fatigue

life./每個單樁基礎(chǔ)單獨(dú)進(jìn)行可打性分析確保疲勞損傷的安全性。POTENTIALSAVINGSONOFFSHORE

SUBSTATION/海上升壓站潛在優(yōu)化Expectedsteelsavingscomparedtotheexisting300MW

design/與當(dāng)前300MW設(shè)計(jì)相比,預(yù)計(jì)可節(jié)省工程量:Jacket~500

tons/導(dǎo)管架基礎(chǔ)~500噸Topside~700to~1000tons/上部組快~700至~1000噸2018OFFSHOREWINDSUMMIT

FUZHOUJUNE14,

20183.

POTENTIAL

SAVINGS

CONT./潛在優(yōu)化比較COMPARISON

BETWEENARAMBOLL450MWOSS(FIG.1)

ANDTHE300MWOSS

(FIG.2)TRUESCALE

/RAMBOLL

450MW上海上升壓站(FIG.1)

和當(dāng)前300MW海上升壓站(FIG.2)比較基于真實(shí)比例模型Fig.1ARamboll450MW

OSSDesign/Ramboll

450MW

海上升壓站設(shè)計(jì)Fig.2

Existing

300MWOSS

Design/當(dāng)前300MW海上升壓站設(shè)計(jì)2018OFFSHOREWINDSUMMIT

FUZHOUJUNE14,

20183.

POTENTIAL

SAVINGSCONT./潛在優(yōu)化比較COMPARISON

BETWEENARAMBOLL450MWOSS(FIG.1)

ANDTHE300MWOSS

(FIG.2)-

TRUESCALE

/RAMBOLL

450MW上海上升壓站(FIG.1)

和當(dāng)前300MW海上升壓站(FIG.2)比較-

基于真實(shí)比例模型Fig.1ARamboll450MWDesign/Ramboll

450MW設(shè)計(jì)Total

weight:

2500t

(5,6tons

perMW)

/總重量:2500噸

(5.6噸/MW)Decksize:17mx33

mJacket,

four-legged.

Approx.

1600tons

/甲板面積:

17mx

33m,四樁導(dǎo)管架基礎(chǔ),重量約為1600噸Fig.2

Existing300MW

Design/當(dāng)前300MW設(shè)計(jì)Total

weight:

3500t

(11,7tons

perMW)/總重量:3500噸(11.7噸/MW)Decksize:41mx43

mJacket,

four-legged.

Approx.

2100tons/甲板面積:41mx

43

m,四樁導(dǎo)管架基礎(chǔ),重量約2100噸POTENTIAL

SAVINGS

FOR

THE

OSS

–VISUALIZATION/海上升壓站潛在優(yōu)化

視覺Ramboll‘sprojectedOSSsize(Green)positionedinsidetheinitialconceptualdesign(White)/Ramboll設(shè)計(jì)的海上升壓站尺寸(綠色)位于最初的概念設(shè)計(jì)升壓站(

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論