




免費預(yù)覽已結(jié)束,剩余2頁可下載查看
下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認(rèn)領(lǐng)
文檔簡介
Construction Project Design Contract(Civil Building Design Contract For Construction Project)Project Name: Project Location: Contract No.: Client (Party A): Designer (Party B): Signed on: Supervised by: the Ministry of Construction of P. R. China State Administration for Industry and Commerce Party A entrusts Party B to undertake the design for _ .This Contract is made by the two parties after their mutual agreement, the two Parties hereby sign this Contract as follows:Article 1.This Contract is made on the basis of the following documents:1.1.The Contract Law of the Peoples Republic of China,The Construction Law of the Peoples Republic of China and Management Provisions on Market of Survey and Design for Construction Projects.1.2. National and local rules and regulations on the administration of survey and design for construction projects.1.3. The approval documents of construction project.Article 2.The design contents: project name, project size, design phases, investment sum, design fee. (as per Fig.1) Fig. 1Project NameProject SizeDesign Phases& ContentsFloor NumbersBuilding Area(m2)SchemeInitial DesignFinal3846 approx.PlanSection Plan ElevationSectionRenderingBuilding Structure DiagramPower Distribution DiagramWater Supply&Drainage DiagramArticle 3.Relevant documents which shall be issued by Party A to Party B:(as per Fig.2) Fig.2S/NName of DocumentsCopiesSubmission DateRemarks1Design Instructions12Plan of Property Line1Electronic Version Attached3Soil Investigation Report14Design Information of Utilities (water, electricity, & gas supply etc.)15Government Approval Documents1Electronic Version AttachedArticle 4. Design documents which shall be submitted by Party B to Party A (as per Fig.3):Fig.3S/NDesign DocumentsCopiesSubmission DateRemarks1Schematic Design Documents1Within 15 Working Days2D.D. Documents1Within 20 Working Days3Working Drawings1Within 30 Working DaysRemarks: In outside pipe network construction documents, the design belonging to Trade monopoly is not included in this Contract.Article 5. Design fee and the mode of payment: Party A shall pay the design fee of RMB_ Yuan for this project to Party B (this fee shall include taxes and all other duties that should be paid by Party B as required by the government regulations). The payment method is as per Fig.4. Fig.4S/N% of Total Design FeeAmount(Yuan)Payment Time(in accordance with the submission date of the design documents)Remarks:1. Party A shall pay the design fee of each stage when Party B submits the design document of each stage.2. Party A shall pay 100% design fee when Party B submits the last part of the working drawings.3. The design fee is fixed by initial design estimation, if there is a difference between actual design fee and estimated fee, Party B shall return the overcharge and demand payment of the shortage. The balance will be settled at the last payment.4. After the Contract is executed, the down payment is regarded as a part of the total design fee.Article 6. Responsibilities of both parties:6.1 Responsibilities of Party A: 6.1.1. According to the contents stated in Article 3 of this Contract, Party A shall submit to Party B basic materials and documents within specified time and should be responsible for the completeness, correctness and validity of the materials and documents. Party A shall not require Party B to conduct design in violation of relevant national standards.In case there is a delay of less than 15 days exceeding the specified time limit for the delivery of the above materials and documents by Party A, the time limit for Party B to deliver design documents shall be extended accordingly; in case there is a delay of more than 15 days exceeding the specified time limit for the delivery of the above materials and documents by Party A, Party B shall have the right to re-determine the time for delivery of the design documents.6.1.2 If Party A alters greatly the design project, scale, conditions which they have already entrusted to Party B, or the materials provided by Party A is wrong/incomplete or Party A makes major alterations to the approved design and the information given, as a result of which, has caused Party B to redo the design work, or has generated un-necessary abortive works, both parties shall enter into negotiation and to draw up a supplementary Contract. Party A shall compensate Party B for the additional work load in accordance to the new agreement.If Party A has agreed all the design works conducted by Party B before the conclusion of the Contract, it shall pay charges to Party B accordingly.6.1.3. Party A shall pay charges for design to Party B at the amount and date provided in this Contract. If Party A requests Party B to submit the design documents ahead of the stipulated time as mentioned in the Contract, Party A shall get the prior consent of Party B and should make additional payment for fast and immediate service.6.1.4. Party A shall provide site office and all relevant office stationary for Party Bs personnel who are being sent to work site during the construction stage.6.1.5. Party A shall protect the design copyright of Party B. Without Party Bs consent, Party A shall not revise, duplicate or transfer the design to a third party or use the design documents for other projects. If the above-mentioned is happened, Party A shall take the relative legal responsibility and Party B shall have the right to claim.6.2 Responsibilities of Party B:6.2.1. Party B shall carry out design work in accordance with technological rules and standards provided in this Contract, submit to Party A the required design documents in right content, time and copies according to the clause of Article 4 and shall be responsible for the quality of the design documents.6.2.2. The design life of the construction project shall be 50 years.6.2.3. Upon delivery of the design documents, Party B shall attend the approval meetings held by Party A and the relevant competent authorities and shall be responsible for making the necessary adjustments, revisions and supplements which does not exceed the scope of the documents of design requirements as originally defined based on the comments of such meetings.6.2.4. Party B is not allowed to disclose and transfer any product drawing, technical and economic data which are provided by Party A to a third party. In case that the above-mentioned is happened, Party B shall take the relative legal responsibility and Party A shall have the right to claim.6.2.5. Party B is not allowed to subcontract the design work completely or partially to any third party without the permission of Party A.Article 7.Default Responsibility:7.1. During the performance of the Contract, if Party A requires to terminate or cancel the Contract before Party B starts the design work, Party B will not return the down payment already paid by Party A; if Party B has started the design work, Party A shall pay for the actual workload already done by Party B. When the actual workload of the design is less than half of the work at the stage, Party A shall pay half of the payment for the design work at the stage. When the actual workload of the design is more than half of the work at the stage, Party A shall pay all the payment for the design work at the stage.7.2. Party A shall pay charges for design to Party B at the amount and date provided in this Contract. For each day of overdue payment, 2 of the overdue payment shall be paid by Party A and the time for delivery by Party B shall be extended accordingly. Where the delay of payment has exceeded 30 days, Party B shall have the right to suspend the performance of the work at the next stage and give written notice to Party A. In case the higher authority or competent department of design approval would not approve the design documents or the engineering construction of this Contract is suspended or stopped, Party A shall pay the due design fee to Party B7.3. Party B shall be responsible for correcting any omission or mistake in their design documents before the construction. If the design mistake made by Party B has caused losses to Party A, Party B shall not only be responsible for taking the remedial measures, but also shall deduct the design fee for the part of such losses and shall pay compensation to Party A according to the degree of such loss. The amount of the compensation shall be discussed and determined by the Parties as 100% _of the actual loss.7.4. If it is Party Bs own fault to have delayed the submission of the design documents according to the stipulated time as described in Article 4, Party B shall deduct 2 of the due amount of the design fee on a daily basis for the delay period.7.5. After the Contract comes into force, Party B may require termination or cancellation of the Contract and shall return the down payment in double.Article 8. Other provisions:8.1. When Party A requires Party B to send site personnel to the construction site for a long period, the two parties shall negotiate for these additional works and sign a supplementary service contract.8.2. Party A shall pay for all the relevant publications and standard collections of drawings issued by the state and local government which are needed by Party B for the purpose of designing the project. If Party B is requested to submit design documents, of which, the number of copies are more than those stipulated in Article 4 of this Contract, Party A shall pay for those additional copies.8.3. In the projects of the Contract, Party B shall not appoint manufacturers or designers of construction materials and equipments. Where there is a necessity that Party B shall cooperate with Party A in ordering the construction materials and equipments, the relevant fee shall be paid by Party A.8.4. If Party A entrusts Party B to undertake work and services which are beyond this Contract, Party A shall pay additional fee.8.5. When this Contract can not be executed because of the unforeseeable natural forces, the two parties shall timely negotiate to solve the problem.8.6. If any dispute arises during the execution of this Contract, it shall be settled by friendly consultation, In case that such consultation fails, it shall be submitted to the Beijing Arbitration Committee or brought to the Peoples Court.8.7. This Contract shall be made in 6 copies. Party A shall hold 3 copies. Party B shall hold 3 copies.8.8. This Contract is prepared in both Chinese and English languages, in the event of conflicts in any of the provisions between the two versions; provisions specified in the Chinese language version shall take precedence. 8.9. This Contract shall come into force when Party A has paid the down payment to Party B and both parties have stamped and signed it.8.10. This Contract
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 綠色環(huán)保材料運用測試試題及答案
- 精準(zhǔn)備考注冊土木工程師考試試題及答案
- 護理單位面試題及答案
- 安全工程師考試新趨勢2025年試題及答案
- 理化檢測面試試題及答案
- 智能汽車技術(shù)測試與分析試題及答案
- 物流管理商務(wù)英語考試試題及答案
- 未來電動車的生產(chǎn)流程優(yōu)化研究試題及答案
- 注冊土木工程師復(fù)習(xí)經(jīng)驗總結(jié)試題及答案
- 電動汽車的市場潛力與行業(yè)預(yù)測試題及答案
- 北京2025年中國環(huán)境監(jiān)測總站招聘(第二批)筆試歷年參考題庫附帶答案詳解
- 美國加征關(guān)稅從多個角度全方位解讀關(guān)稅課件
- “皖南八校”2024-2025學(xué)年高一第二學(xué)期期中考試-英語(譯林版)及答案
- 防洪防汛安全教育知識培訓(xùn)
- 安寧療護人文關(guān)懷護理課件
- 2025年廣東廣州中物儲國際貨運代理有限公司招聘筆試參考題庫附帶答案詳解
- 商場物業(yè)人員缺失的補充措施
- 2021年妊娠期血壓管理中國專家共識
- 一種基于STM32的智能門鎖系統(tǒng)的設(shè)計-畢業(yè)論文
- 人體穴位與天體對應(yīng)解密
- 機械行業(yè)六個典型事故案例分享
評論
0/150
提交評論