BE多層共擠吹膜機(jī)沖料程序_第1頁
BE多層共擠吹膜機(jī)沖料程序_第2頁
BE多層共擠吹膜機(jī)沖料程序_第3頁
BE多層共擠吹膜機(jī)沖料程序_第4頁
全文預(yù)覽已結(jié)束

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡介

1、Purge procedure, materials and operating temperatures吹膜設(shè)備沖料程序Materialin thedie模頭內(nèi)的原料Purge Material 沖洗原料Typical operating temperatures oC典型操作溫度Z1Z2Z3Z4LDPEShut down layer/ line withLDPE以LDPE關(guān)閉層或生產(chǎn)線180200195200HDPEUse 0.3 0.5 MI LDPE until LLDPE is completely out. No need to purge system if HDPE is go

2、ing to be run the next day 使用0.30.5MI的LDPE直至LLDPE完全清出,如第二天仍要 運(yùn)行,就不用沖洗系統(tǒng)205220210205LLDPEUse 0.3 0.7 MI LDPE untilLLDPE is completelyout.用0.30.7MI 的 LDPE,直至 LLDPE完全清出205220210205NYLON1. Increase temps 10 degreesC before introducing purge235250255260resin. Purge resin may be 0.3 0.7 MI LDPE or blends

3、of LDPE and Tie at 50/50 ratio.For blend, about 50kg is required initially then continue with LDPE until complete. After completing disco purge process, add about 15 kg blend of Tie and LDPE to flush out any remaining PA.(PA 6227(PA 6,66232237243Procedure for PA6,66 is similar except the temperature

4、 profiles are normally lower. 在放入沖料原料前升高溫度 10 度, 沖洗原料可以用是 0.30.7MI 的 LDPE,或 LDPE 和 TIE 各50% 比例混合原料 ,對于混合原料 ,一 開始需要 50公斤,然后繼續(xù)使用 LDPE直至完全清出,完成”迪斯 科”沖料程序后,加入15公斤Tie 和LDPE的混合料沖出殘留的尼 龍.對于共聚尼龍的沖料程序類 似,除了溫度通常需低一點(diǎn) .2. Go to Shut down procedures 2 .執(zhí)行關(guān)機(jī)程序 2EVOHUse 0.3 0.7 MI LDPE; follow same procedure outli

5、ned forNylon. 用 0.30.7MI 的 LDPE 與 尼龍程序相同195205 210 210Tie MaterialUse 0.3 0.7 MILDPE用0.30.7MI 的LDPEPETUse 0.3 0.7 MI250260 260 260LDPE用0.30.7MI 的LDPEPPUse 0.3 0.7 MI LDPE, if PP200225 220 210is the next material to be run after 0.3 0.7 MI LDPE, then use 1-1.5 LDPE as the transition material to purge

6、 out the 0.3 LD before PP is introduced.用 0.30.7MI 的 LDPE,如果 PP 是0.30.7MILDPE 之后要 運(yùn)行的 原料撚后用11.5的LDPE作為 轉(zhuǎn)變(過渡原料,在導(dǎo)入PP前沖 止沖清洗 0.3LDMetalloceneSUse 0.3 0.7 MILDPE用0.30.7MI 的LDPE205220210205PVDCUse 2 MI LDPE用2MI的DPE150155155155Note: The above operating temperatures can be changed depending on processing

7、 conditions, and grades of resins and applications.注意;以上操作溫度可以根據(jù)處理環(huán)境或再生料視應(yīng)用等級進(jìn)行調(diào)節(jié)Shut down procedures: 關(guān)機(jī)程序1. Before introducing the purge material increase the temperatures 510oC for PA, EVOH and PET resins. This will lower the viscosity of the polymers being purged to avoid wetted-surface freezing

8、 when the cooler higher viscosity resin passes over the system. For Polyolefin resins, temperature change is not necessary.對于PA、EVOH和PET原料在導(dǎo)入沖洗原 料前升高溫度510度,這將降低要 沖洗的聚 合物的粘性以避免當(dāng)冷卻的高粘性 原料通 過系統(tǒng)的表面凝固。對 于 聚烯烴原料,溫度不 需要改變。2. Run extruders (only for the layers with the difficult-to-purge resins such as PA,

9、EVOH and PET at the highest rate possible for about 10 minutes limited only by pressure and bubble instability. Continue the process with disco purging. e.g. Ext at 80 rpms for two minute3s0trhpemn s for twominutes. Repeat steps until all traces of previous materials are gone . Purging can begin lat

10、er for the other layers that are normally not difficult topurge. 當(dāng)壓力和氣泡不穩(wěn)定時,以高速運(yùn)行擠出機(jī)(只對于難以沖洗的原料 層 如口;尼龍、EVOH、PET)大約10分鐘,然后繼續(xù)以迪斯科沖料程序進(jìn)行,如;擠 出機(jī)以80rpm,運(yùn)轉(zhuǎn)用2分鐘,然后擠出機(jī)以30rpm,運(yùn)轉(zhuǎn)用2分鐘,反復(fù) 多次 交換進(jìn)行,直至以前的原料完全被沖出。隨后開始對一般不容易沖洗的 其它層 進(jìn)行沖洗3. When no more trace of the previous material is visible, decrease the extruder

11、 and die temperatures in increments of 20 to 25oC for 15 to 20 minutes until temps reach 120oC. Reduce output as pressure builds to avoid failure of rupture discs and stoppage of extruders due to motor over loads. When it is no longer possible to maintain a bubble, rotate the screws slowly until the

12、 temperatures are at the suggested values. This procedure must be followed to get the dies below 200oC beforeshuttingpowerofftothesystem.當(dāng)看不出以前原料的痕跡時,在1520分鐘之內(nèi)降低擠出機(jī)和模頭的溫度,每 次2025度,直到溫度達(dá)到120度,隨著壓力的 升高,降低了產(chǎn)量,以避免破裂轉(zhuǎn)盤故 障 和由于 馬達(dá)超負(fù)荷而導(dǎo)致擠出機(jī)停機(jī),當(dāng)不能再維持氣泡狀態(tài)時,緩慢旋轉(zhuǎn)螺桿 直至 溫度達(dá)到建議值。關(guān)閉系統(tǒng)之前,必需按照 此步驟使將模頭溫度降至200度以下 。4. W

13、hen procedures 1-3 are completed, stop the extruders and decrease temperatures to 90oC. Shut the power off when the extruders are at 90oC. (If the planned shut down is withpower onbut for more than 12 hours, leave system temperature at 60oC. The die temperature can be higher than 100oC at this point because of its mass and the fact that there is no cooling. 完成13步 驟后,停止擠出機(jī),降低溫度至 90度,當(dāng)擠出機(jī)溫度達(dá)到90度時 關(guān) 閉電源

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論