獸醫(yī)免疫學(xué)在線作業(yè)B_第1頁
獸醫(yī)免疫學(xué)在線作業(yè)B_第2頁
獸醫(yī)免疫學(xué)在線作業(yè)B_第3頁
獸醫(yī)免疫學(xué)在線作業(yè)B_第4頁
獸醫(yī)免疫學(xué)在線作業(yè)B_第5頁
已閱讀5頁,還剩18頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡介

1、獸醫(yī)免疫學(xué)在線作業(yè)B 獸醫(yī)免疫學(xué)_在線作業(yè)_B最終成績:75. 0 一單項(xiàng)選擇題 1. (5.0分)制備單克隆抗體可采用的技術(shù)是()。 免疫小鼠后采集血液分離血清技 術(shù) 淋巴細(xì)胞雜交瘤技術(shù) 免疫親和層析技術(shù) 普通細(xì)胞培養(yǎng)技術(shù) 知識(shí)點(diǎn):3. 2.3單克隆抗體的制備過程 用戶解答:淋巴細(xì)胞雜交瘤技術(shù) 2. (5.0分)在抗慢性細(xì)菌感染的免疫中()。 非特異性免疫起決定作用 細(xì)胞免疫起決定作用 體液免疫起決定作用 以上都不對(duì) 知識(shí)點(diǎn):6特異性免疫應(yīng)答 用戶解答:細(xì)胞免疫起決定作用 3 of support and hanger Cable hole plugging gaps should use

2、qualified fireproof materials, block surface should have sufficient strength, surface appearance When cables pass through the firewall, of lax structure of local fire safety clamps Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent w

3、ith the core wire specifications, contact is good, no cracks, break Tinned copper nose clean solder full exterior surface is smooth without burrs Control cable Assembly should be fastened, dense, solid, clean, and beautiful Secondary wiring the cable terminations should be arranged by the actual loc

4、ation of the device line cards, the wiring from the upper to the lower, from left to right in the order Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant 5 thermal process

5、control measures for quality problems 5 1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems Plant for local Panel after inst

6、allation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector Instrument pi

7、pe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong Requirements for welding personnel certified, and welding

8、 before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal imme

9、diately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall (5.0分)下列哪種物質(zhì)本身沒有免疫原性,() r 抗體 r 補(bǔ)體 弗氏完全佐劑 r 多糖 知識(shí)點(diǎn)

10、:1.2影響免疫原性的因素 用戶解答:弗氏完全佐劑 (5.0分)酶聯(lián)免疫吸附試驗(yàn)間接法所用的酶標(biāo)記物是()。 酶標(biāo)記抗原 酶標(biāo)記抗補(bǔ)體抗 體 酶標(biāo)記抗體 酶標(biāo)記抗免疫球蛋口抗體 知識(shí)點(diǎn):10.1免疫血清學(xué)技術(shù) 用戶解答:酶標(biāo)記抗免疫球蛋口抗體 5. (5. 0 分) Coombs試驗(yàn)可用來檢測(cè)()。 不完全抗原 不完全抗體 完全抗體 of support and hanger Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient streng

11、th, surface appearance When cables pass through the firewall, of lax structure of local fire safety clamps Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break Tinned

12、 copper nose clean solder full exterior surface is smooth without burrs Control cable Assembly should be fastened, dense, solid, clean, and beautifu1. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, f

13、rom left to right in the order Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant 5 thermal process control measures for quality problems 3 1 control thermal duct system lea

14、kage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems Plant for local Panel after installation, in conjunction with the quality Department to check its overall

15、 quality, poor-quality parts replacement Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector Instrument pipe welding, construction workers and technicians on every road, every inst

16、rument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out constructi

17、on, welding quality inspection and acceptance every day to ensure that the welding All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indic

18、ator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall r 完全抗原 知識(shí)點(diǎn):11經(jīng)典的免疫學(xué)反應(yīng) 用戶解答:不完全抗體 6. (5.0分)用疫苗進(jìn)行預(yù)防接種的方法是()。 人工主動(dòng)免疫 嚴(yán) 天然被動(dòng)免疫 嚴(yán) 人工被動(dòng)免疫 廣; 天然主動(dòng)免疫 知識(shí)點(diǎn):9. 2疫苗與免疫預(yù)防 用戶解答:人工主動(dòng)免疫 7

19、. 特夫素(tuftsin)是在下列哪種外周免疫器官中產(chǎn)生的,() (5. 0 分) 扁桃體 脾臟 淋巴結(jié) r 哈德氏腺 知識(shí)點(diǎn):4.1免疫器官 用戶解答:脾臟 of support and hanger Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance When cables pass through the firewall, of lax structure of local

20、 fire safety clamps Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break Tinned copper nose clean solder full exterior surface is smooth without burrs Control cable A

21、ssembly should be fastened, dense, solid, clean, and beautifu1. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order Fixed to maintain consistent spacing between lines, flat

22、, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant 5 thermal process control measures for quality problems 3 1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality

23、and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement Supply good quality of purchasing instrument a

24、nd ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding followin

25、g the end of each review, responsibility and prevention of welding, welding wrong Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding All

26、unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer

27、to review and then transported for the construction. Amount of insulation materials shall 8. (5.0分)是下列哪種免疫球蛋白所具有的特殊分子結(jié)構(gòu),() r 血清型IgA IgE 分泌型IgA IgG 知識(shí)點(diǎn):2免疫球蛋白與抗體 用戶解答:分泌型I胡 9. (5.0分)下列關(guān)于抗原決定簇的描述中錯(cuò)誤的是()。 決定簇的大小受免疫活 性細(xì)胞膜受體和抗體分子的抗原結(jié)合點(diǎn)所制約 每個(gè)抗原分子上抗原決定簇的數(shù)U就是該抗原的抗原價(jià) 多特異性決定簇一定是多價(jià)的 多價(jià)抗原一定是多特異性決定簇 知識(shí)點(diǎn):1.6重要的抗原

28、 用戶解答:多價(jià)抗原一定是多特異性決定簇 10. (5. 0 分) 補(bǔ)體參與下列哪一反應(yīng),() ADCC反應(yīng) 凝集反應(yīng) 細(xì)胞溶解反應(yīng) of support and hanger Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance When cables pass through the firewall, of lax structure of local fire safety c

29、lamps Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break Tinned copper nose clean solder full exterior surface is smooth without burrs Control cable Assembly should

30、 be fastened, dense, solid, clean, and beautiful Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order Fixed to maintain consistent spacing between lines, flat, should be aro

31、und the corner in the same location, same shape, to ensure that the wiring process neater and more elegant 5 thermal process control measures for quality problems 3 1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment t

32、o the site to check its seal, acceptance, in order to fundamentally solve oil spill problems Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of

33、the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of e

34、ach review, responsibility and prevention of welding, welding wrong Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding All unreleased mat

35、erial sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and

36、then transported for the construction. Amount of insulation materials shall r 沉淀反應(yīng) 知識(shí)點(diǎn):4. 4補(bǔ)體系統(tǒng) 用戶解答:細(xì)胞溶解反應(yīng) 11. (5.0分)組成補(bǔ)體攻膜復(fù)合體的是()。 r C3bBb r C4b2b C56789 r C4b3b 知識(shí)點(diǎn):11.3補(bǔ)體參與的反應(yīng) 用戶解答:C56789 12. (5.0分)機(jī)體免疫應(yīng)答過強(qiáng)會(huì)導(dǎo)致()。 r 嚴(yán)重感染 r 免疫缺陷病 廣 自身免疫病 過敬性疾病 知識(shí)點(diǎn):7抗感染免疫 用戶解答:過敬性疾病 13. of support and hanger Cable

37、hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance When cables pass through the firewall, of lax structure of local fire safety clamps Thermoplastics production, to comply with the process, no bubbles in the thermoplastics p

38、ipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break Tinned copper nose clean solder full exterior surface is smooth without burrs Control cable Assembly should be fastened, dense, solid, clean, and beautiful Secondary wiring the cable terminations should

39、 be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and

40、more elegant 5 thermal process control measures for quality problems 5 1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems P

41、lant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision

42、sleeve connector Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong Requirements for welding pe

43、rsonnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the s

44、upervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall 既具有喬噬殺菌作用乂具有抗原加工遞呈作

45、用的細(xì)胞是()。 (5. 0 分) 巨噬細(xì)胞 嚴(yán) 中性粒細(xì)胞 r; B細(xì)胞 樹突狀細(xì)胞 知識(shí)點(diǎn):6特異性免疫應(yīng)答 用戶解答:巨噬細(xì)胞 二多項(xiàng)選擇題 1. (5. 0 分) 下列哪些因素可以引起免疫失敗,()。 長途運(yùn)輸后馬上進(jìn)行免疫 畜舍消毒后馬上進(jìn)行滅活疫苗 的免疫 動(dòng)物機(jī)體微量元素缺乏 同時(shí)免疫兩種弱毒疫苗 母源抗體水平較高時(shí)免疫 知識(shí)點(diǎn):9疫苗與免疫預(yù)防 用戶解答:長途運(yùn)輸后馬上進(jìn)行免疫丨動(dòng)物機(jī)體微量元素缺乏丨同時(shí)免疫兩 種弱毒疫苗丨母源抗體水平較高時(shí)免疫 of support and hanger Cable hole plugging gaps should use qualifie

46、d fireproof materials, block surface should have sufficient strength, surface appearance When cables pass through the firewall, of lax structure of local fire safety clamps Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the

47、core wire specifications, contact is good, no cracks, break Tinned copper nose clean solder full exterior surface is smooth without burrs Control cable Assembly should be fastened, dense, solid, clean, and beautiful Secondary wiring the cable terminations should be arranged by the actual location of

48、 the device line cards, the wiring from the upper to the lower, from left to right in the order Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant 5 thermal process control

49、measures for quality problems 5 1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems Plant for local Panel after installation

50、, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector Instrument pipe weldi

51、ng, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong Requirements for welding personnel certified, and welding before

52、welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately

53、sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall 2. (5. 0 分) Fc片段的生物學(xué)活性包括()o 決定Ig分子的親細(xì)胞性 與Ig通過粘膜進(jìn)入外分泌液有關(guān) 與

54、補(bǔ)體結(jié)合、活化補(bǔ)體有關(guān) 是決定各類Ig抗原特異性的部位 與Ig選擇性通過胎盤有關(guān) 知識(shí)點(diǎn):3抗體的人工制備 用戶解答:決定血分子的親細(xì)胞性丨與I呂通過粘膜進(jìn)入外分泌液有關(guān)丨與 補(bǔ)體結(jié)合、活化補(bǔ)體有關(guān)丨是決定各類Ig抗原特異性的部位丨與Ig選擇性通過 胎盤有關(guān) 3. (5.0分)下列關(guān)于沉淀反應(yīng)與凝集反應(yīng)的描述中正確的是()。 沉淀原分子 較小,而凝集原 分子較大 沉淀原與凝集原相比單位體積內(nèi)總面積較小 沉淀原是可溶性的,而凝集原一般是顆粒性的 r 沉淀反應(yīng)時(shí)通常要稀釋抗原 凝集反應(yīng)時(shí)通常要稀釋抗原 知識(shí)點(diǎn):11. 2沉淀反應(yīng) 用戶解答:沉淀原分子較小,而凝集原分子較大丨沉淀原是可溶性的,而凝

55、集原一般是顆粒性的丨凝集反應(yīng)時(shí)通常要稀釋抗原 4. of support and hanger Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance When cables pass through the firewall, of lax structure of local fire safety clamps Thermoplastics production, to compl

56、y with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break Tinned copper nose clean solder full exterior surface is smooth without burrs Control cable Assembly should be fastened, dense, solid, clean, and be

57、autifu1. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, sam

58、e shape, to ensure that the wiring process neater and more elegant 5 thermal process control measures for quality problems 5 1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance

59、, in order to fundamentally solve oil spill problems Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small

60、as possible, selection of high quality, high precision sleeve connector Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and preventio

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論