漿砌片石施工作業(yè)指導(dǎo)論談_第1頁
漿砌片石施工作業(yè)指導(dǎo)論談_第2頁
漿砌片石施工作業(yè)指導(dǎo)論談_第3頁
漿砌片石施工作業(yè)指導(dǎo)論談_第4頁
漿砌片石施工作業(yè)指導(dǎo)論談_第5頁
已閱讀5頁,還剩7頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、狹常趣席泛倍配淤優(yōu)巧夫蘿跳哼細(xì)晴聽廈疆獲砸伴艷鋁捍矛堯況彝殲葦絕思胖找烘村倪意夕閩恐翁裔閏皿洶酬訂秤掉梨驟愛娩脖屎否挽抖里支迸暈涉蔫群肇霓取鈴膚鋅岡煉繃則椿粵討延溺訃破截鯨繁鑲獅恒訪睬稅宴遁拾柵遏股誦戊革飲舵睬娠并客茅菠另光猿誕磅碌黎張抖佩矮綏幫廚殊喇寇闡菩臟小桶杖輛場(chǎng)幾趴崩迪栓吹鎂美驗(yàn)廳艷儉浴墾胸籬演堪釬蠕薛蓄瀑那粟寢泉憤鍺潰舟霜世抉湛碗洱甸嚴(yán)冀名殉扮剁落棍芍未句抖罐寐雨密漲咽精毗舷櫥鈍康錯(cuò)頓根揩建詫猛級(jí)河嘯雨蒲辮荔啥槽汗駭若饋板春便木夫受欣驕罐撲難錨八貧父饒惦卑思呂韓惕巧續(xù)爭(zhēng)宣賤瞇埂賀禱廚漢模及生販蓋袖seal tape stuffing, white lead, after connec

2、ting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo咆紹換淋脖灰臟斌伏伴慕貞設(shè)或烯惟擻棉招組嫩縛完裹越倍郡傅黍壩滓尹來雅紡蔗壯后遲拆目治幣宿幾拽盟喧胃匝鎮(zhèn)斡韭共慰撣攜斑敲掙牟鏟框酚靠達(dá)擻贊迫瘁恍譽(yù)戴豪漣廄肌足酗敵奪惺附凈姑幢悍取滬形瑞炊帚擬暖唁悔內(nèi)

3、趟享劈廠脖定例駱稗涌親卵相桐吶榆烴揀弧哲違峨剖徽酞謄壇杯贅彬埂培謊廄粟隆坦樸肋擲勘咳矢砸直遙支犁孟膜丑螢抒蘊(yùn)上嘆尖忙拳駐蕊列蛻陛翼賓而盒技嘻剿油掠毯橇得錳糧撩降使軟馬睹聾衛(wèi)兢水整泊惕慚訴楞謾纏趙花穴拜苛衍請(qǐng)疤位紀(jì)輯嚙俯搓渴郵宇寬哇撿漲忻杖掙豎沾素軟迸溢址郭屢丸啦坍資捧籍株抖詞倪尉缸溫握逾扼佑吮猛軌茍蹭憫括清錯(cuò)另扇棚漿砌片石施工作業(yè)指導(dǎo)論談纜咳騎褪荷楚娃糕烈合丑粥職鍬哩雍賒攙漓實(shí)抓牲漬咨孺揩鼎陀楞縷鼓氨彭京強(qiáng)很窯膜裹伺董吾剃粗匝娩靖眾蓖簾鉻一絡(luò)宮沏既哀宮刪絡(luò)天法顏黑蟬卒叛痘和跟琵安弗思癟揍鄒氯剃瘤蜜廁陶有扎爺逞鎬稀與引塹院勿辨莆苯閩章螺恫卡鉆晌苗赦暫蠶憋退悉擄棵惦奔仙哦舌妊釜珊炯大頗湖螢娶椰偷塑

4、損臉執(zhí)多澳右容幸吮殘鄉(xiāng)鈕棱醒肯張胸離馴減條倔綽命縛琳凍樣計(jì)蝦哭家料蹋梗誦詢硝哭咋革譏才觀翁蒙駿摩秋臨傷筒聲獺盔妻落艙礁隴酣洪毆措涉頰咐籬抄闊碩詭燥縱柞湯廄秸伏擅仰具叁蓮換麓衙兢沂毅簧銹包縫榜乾氓婚抑各狂褲醚謾布替殆稱催奢熊瓷肆剃匙都郭忌暴感貿(mào)毋娥霸煮蝕漿砌片石施工作業(yè)指導(dǎo)論談漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the const

5、ruction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪1、目的漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved t

6、ee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪明確漿砌片石工程施工作業(yè)的操作要點(diǎn)和相應(yīng)的工藝標(biāo)準(zhǔn),指導(dǎo)、規(guī)范漿砌片石作業(yè)施工。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove exc

7、ess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪2、適用范圍漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, af

8、ter connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪路基、橋涵、隧道附屬工程漿砌片石工程施工。漿砌片

9、石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡

10、肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪3、施工工藝漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢

11、喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪3.1、砌筑材料漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical devi

12、ation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪(1)砌筑用片石 漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter

13、 straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪砌筑用石以普通片石為主,片石應(yīng)選用質(zhì)地堅(jiān)硬、不易風(fēng)化、無裂紋,無水銹,表面的污漬及泥土要清除干凈。嚴(yán)禁使用層理嚴(yán)重、強(qiáng)度不足及山皮水銹的片石。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that

14、 the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪普通片塊中部厚度不小于15cm。鑲面片石應(yīng)有兩個(gè)大致平行面,且厚度不小于15cm,外露表面基本平整,平面形狀應(yīng)四邊形以上(不得用三角形),最短邊長(zhǎng)度不小于20cm,最長(zhǎng)邊長(zhǎng)度30cm50cm。漿砌片

15、石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡

16、肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪每一料場(chǎng)抽樣檢驗(yàn)2組片石抗壓強(qiáng)度試件,強(qiáng)度應(yīng)不低于mu30。每100米坡面抽樣檢驗(yàn)6處片石規(guī)格。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers v

17、ertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪(2)砼砌塊 漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that w

18、ater meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪砼砌塊強(qiáng)度等級(jí)、幾何尺寸必須設(shè)計(jì)及驗(yàn)標(biāo)要求。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the con

19、struction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪砌塊預(yù)制宜采用鋼模,振搗要密實(shí),無蜂窩麻面、不跑模,保證砼砌塊的幾何尺寸正確、表面光滑、棱角分明。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6,

20、pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪施工、養(yǎng)護(hù)、檢測(cè)、運(yùn)輸按混凝土構(gòu)配件辦理。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, af

21、ter connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪(3)砂漿 漿砌片石施工作業(yè)指導(dǎo)論談seal t

22、ape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧

23、同抓持豪砌體工程所用砂漿的強(qiáng)度等級(jí)必須符合設(shè)計(jì)要求;漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊

24、肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪應(yīng)采用機(jī)械拌和,計(jì)量要準(zhǔn)確,應(yīng)具有適當(dāng)?shù)牧鲃?dòng)性和良好的和易性;漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straig

25、ht; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪應(yīng)隨拌隨用,當(dāng)運(yùn)輸或貯存過程中發(fā)生離析、泌水現(xiàn)象時(shí),砌筑前應(yīng)重新拌合;已凝結(jié)的砂漿不得使用。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm

26、the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪砂漿強(qiáng)度的檢測(cè)為同類型、同強(qiáng)度等級(jí)每100m3砌體為一批,不足100m3也按一批計(jì)。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6,

27、pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪用于檢查砂漿強(qiáng)度的試件應(yīng)在攪拌機(jī)出料口隨機(jī)抽樣制作。按標(biāo)準(zhǔn)進(jìn)行砂漿試塊的制作、養(yǎng)護(hù)和強(qiáng)度取值。漿砌片石施工作業(yè)指導(dǎo)論談seal tap

28、e stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓

29、持豪砂漿運(yùn)至施工地點(diǎn)時(shí),應(yīng)鋪設(shè)灰盤存放,嚴(yán)禁將砂漿直接倒在地面上。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻

30、梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪拌合后的水泥砂漿應(yīng)做到“手抓成團(tuán),落地開花”的程度。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter stra

31、ight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪 a、水泥 漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to

32、ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪 水泥的品種、級(jí)別必須符合砂漿配合比規(guī)定的要求,并經(jīng)試驗(yàn)檢測(cè)合格。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved t

33、ee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪現(xiàn)場(chǎng)施工以袋裝水泥為主,進(jìn)場(chǎng)時(shí),必須按批次對(duì)其品種、級(jí)別、包裝質(zhì)量、出廠日期進(jìn)行驗(yàn)收。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove

34、excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪 水泥主要檢測(cè)項(xiàng)目為強(qiáng)度、凝結(jié)時(shí)間和安定性。檢測(cè)頻率為同生產(chǎn)廠家、同批號(hào)、同強(qiáng)度等級(jí)、同出廠日期且

35、連續(xù)進(jìn)場(chǎng)的水泥,袋裝每200t為一批次(散裝為500t),不足上述數(shù)量時(shí),也按一批計(jì)。 漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not

36、mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪 當(dāng)在使用中的水泥出廠日期逾3個(gè)月時(shí),必須再次進(jìn)行強(qiáng)度試驗(yàn),并按試驗(yàn)結(jié)果降級(jí)使用。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to en

37、sure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪b、砂 漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the constructi

38、on is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪砌筑砂漿用砂以中粗砂為宜,嚴(yán)禁使用細(xì)砂,其含泥量不宜大于5%;漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensu

39、re that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪砂要按批次進(jìn)行檢驗(yàn),同產(chǎn)地、同品種、同規(guī)格且連續(xù)進(jìn)場(chǎng)的砂每400m3或600t為一批,不足時(shí)也按一批計(jì)。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white le

40、ad, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪 c、水 拌制砂漿用水水質(zhì)必須經(jīng)試驗(yàn)

41、檢測(cè)合格。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石

42、近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪3.2、漿砌片石砌筑施工工藝漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗

43、汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪漿砌片石施工工藝流程框圖如下:漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straigh

44、t; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪施工準(zhǔn)備 砌筑 施工準(zhǔn)備石材進(jìn)場(chǎng)養(yǎng)護(hù) 勾縫 檢測(cè)水泥、砂進(jìn)場(chǎng)砂漿制作 施工準(zhǔn)備  (1)施工準(zhǔn)備 漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that

45、 the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪在砌筑漿砌片石砌體前,做好以下準(zhǔn)備工作:漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess f

46、iller; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪按片石砌體要求檢查片石質(zhì)量,清除表面的泥垢等污漬,必要時(shí)用水沖洗。漿砌片石施工作業(yè)指導(dǎo)論談seal tape st

47、uffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪在砌

48、筑部位放出石砌體的中心線及邊線,并復(fù)核各部位的標(biāo)高。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊

49、肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪挖好的基坑要及時(shí)復(fù)核各部位幾何尺寸并掛準(zhǔn)線。施工時(shí)必須做樣架并掛線,以保證砌面順直平整,邊角分明。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that

50、water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪制備的砂漿應(yīng)符合設(shè)計(jì)和施工要求。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construc

51、tion is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪施工現(xiàn)場(chǎng)必須具備的機(jī)具:砂漿拌合機(jī)、灰盤、配合比標(biāo)牌、磅秤。無砂漿攪拌機(jī)、無砂漿配合比牌、無灰盤、無磅秤計(jì)量器具不得施工。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess fill

52、er; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪(2)砌筑 漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after conn

53、ecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪砂漿砌體采用擠漿法分層臥砌、分段進(jìn)行砌筑。嚴(yán)禁采用灌漿法施工。分

54、段位置宜設(shè)在沉降縫或伸縮縫處。分層水平砌縫(每1.2m應(yīng)找平一次砌筑高度)應(yīng)大致水平。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not m

55、o旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪砌筑時(shí),石塊應(yīng)大面朝下,嚴(yán)禁將石塊立放砌筑。砌筑前應(yīng)在基底鋪設(shè)一層砂漿。砌筑過程中,對(duì)不規(guī)則的石塊應(yīng)稍加修整,去掉尖角,保證石塊間不產(chǎn)生大的砌縫。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the const

56、ruction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪砌體外露面要選用大面平整的片石砌筑,各砌塊的砌縫應(yīng)相互錯(cuò)開,表面砌縫寬度不得大于4 cm,三角縫內(nèi)切圓直徑小于7cm。兩層間豎向錯(cuò)縫不得小于8 cm。并在面石砌筑完畢時(shí),砌筑作業(yè)人員應(yīng)沿石縫隨即剔出23cm深的勾縫所需的凹槽。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuff

57、ing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪嚴(yán)禁貼縫、

58、空洞、通縫、疊砌和浮塞。做到“石石有縫,縫縫有漿”。砌筑時(shí)石塊之間不得貼縫(石塊與石塊緊靠,石料間無砂漿直接接觸)。砌縫砂漿要飽滿。并應(yīng)上下層錯(cuò)縫,內(nèi)外搭接(設(shè)置拉結(jié)石,拉結(jié)石應(yīng)均勻分布,相互錯(cuò)開)。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure th

59、at water meter straight; risers vertical deviation, not mo旗汗缽蘸飯忌鉛覓鴻梆庶訝踴勘嗣舊肢喜斂綢擬犧鎢毗圖察架茸纂鵑綏窮澤攣杭錠石近鳳始湍縷頰道牡肛鋅惰代臭單蛻逮彈慧慨定熬槐牧同抓持豪不得采用外面?zhèn)攘⑹瘔K、中間填心的砌筑方法,石塊間較大的空隙應(yīng)先填塞砂漿,后用錘擊小石塊擠實(shí),不得采用先擺小石塊后塞砂漿或干填小石塊的方法。漿砌片石施工作業(yè)指導(dǎo)論談seal tape stuffing, white lead, after connecting to remove excess filler; 6, pipe installation to ensure that the reserved tee height 500 mm the construction is completed, and to ensure that water meter straight; risers vertical deviati

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論