




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、plc in the ice storage central air-conditioning system of control 1 introduction in plc in 30 years which developed, it passes through develops unceasingly, already could unify simulates i/o, the network corresponds as well as uses new programming standard like iec 61131-3. however, engineers only m
2、ust use digital i/o and few simulations i/o number as well as simple programming skill on potential 80% industrial application. plc has been widely used in all industrial sectors. according to "the united states market information" world plc and software market report, in 1995 the global s
3、oftware plc and its economies of scale of about 5 billion us dollars 5. as electronic technology and the development of computer technology, because uses traditional the tool to be possible to solve 80% industrial application, like this intensely needs to have low cost simple plc; thus promoted the
4、low cost miniature plc growth, it has the useful trapezoidal logical programming digital i/o. however, this has also created the discontinuity in the control technology, on the one hand 80% application need to use the simple low cost controller, but on the other hand other 20% application then have
5、surpassed the function which the tradition control system can provide. engineer is developing these 20% application to need to have the higher circulation speed, the senior control algorithm, the more simulations function as well as can well and the enterprise network integration.in 80 and the 90
6、9;s, these must develop "20% application" engineers had considered uses pc in the industry control. pc provides the software function may carry out the senior task, provides the rich programming and the user environment, and the pc cots part enables control engineer the technology which de
7、velops unceasingly to use in other applications. these technologies including floating point processor; high speed i/o main line, like pci and ethernet; fixed data memory; software development kit. moreover pc also can provide the incomparable flexibility, highly effective software as well as senior
8、 low cost hardware. ice thermal storage air conditioning is the central power grid could be redundant-night ice electricity in the form of cold storage, in the daytime peak hours of electricity to provide air-conditioning services melting ice. as most parts of our country at night than during the da
9、y much lower price, using ice cold storage central air-conditioning can greatly reduce user operating costs. ice storage central air-conditioning system configuration of equipment than conventional air conditioning system to increase some, require a higher degree of automation, but it automatically
10、to meet the requirements of the air-conditioned buildings all day every day under the conditions of the energy he has exhausted all, the biggest limits to save operating costs. the plc functions are greatly enhanced, with the following characteristics:(1) high reliability. plc benefited from the hig
11、h-reliability hardware and software on a series of anti-jamming measures and the cycle of its special scanning methods of work. (2) with rich i / o interface module. plc for different industrial field signal and the corresponding i / o modules and industrial devices or equipment at the scene of a di
12、rect connection. in addition to improving performance, it also has a variety of man-machine dialogue interface modules to the industrial composition of local area networks, it also multiple communications network interface module.(3) modular structure. to meet the needs of various industrial control
13、, in addition to a small plc unit, the vast majority of plc are modular structure. plc various components, including the cpu, power supply, i / o, etc. is modular in design from the rack and cables will connect each module, the system's size and function in accordance with the needs of users of
14、its own portfolio. (4) easy to learn programming. most of the plc programming relay control circuit similar to the ladder diagram form, the user, do not have computer expertise, it is easy to general engineering and technical personnel understand and master. (5) installation is simple and easy maint
15、enance. plc does not require specialized equipment room in a variety of industrial environments can be directly run. various modules are run and fault indication devices, user-friendly understanding of the operation and find fault. the modular structure, so any failure of a module, users can replace
16、 the module, allowing the system to rapidly resume operation.second, the characteristics and application of industrial pc 2 control system the control system consists of the crew (floor control workstation) and pc (central management workstation), with the crew using programmable logic controller (p
17、lc) with the touch screen, pc using industrial-grade computers and printers, system configuration necessary if the annex communications equipment interfaces, network interface cards, modems and so on, to achieve the parameters of the storage system and intelligent automatic operation. under the crew
18、 at the scene and touch-screen systems can control, parameter settings and data. pc remote management and print, it contains the crew and all of the features touch screen. following the system as a whole crew of industrial programmable logic controller as the core, to achieve automatic control. cont
19、rol equipment and devices including: detection sensor components, electric valves, converter, etc. under the 2.1-systems (regional workstations) 2.1.1 tp21 touch screen tp27 used as a color touch-screen operator panel, completely replace conventional button, lights device, the control cabinet interv
20、iewed more tidy. moreover, tp27 touch screen at the scene showed that the state can be realized, system settings, mode selection, parameter setting, fault recording, record load, time-of-day, real-time data, load curve and reporting statistics, and other functions, chinese intuitive and friendly use
21、r interface. 2.1.2 siemens plc simatic s7-300 series plc applied to all walks of life, all kinds of occasions in the detection, monitoring and control automation, its powerful features to both operate independently, or linked to a network able to achieve complex control functions. the product featur
22、es photoelectric isolation, and high electromagnetic compatibility; high industrial applicability, allowing the ambient temperature of 60 ; has a strong anti-jamming and anti-vibration and impact resistance, in the harsh environment of the work has been widely applications. i also means freedom of c
23、ommunications s7-300 plc, a very unique features, it makes s7-300 plc with any communication protocol can open other equipment, communications controller, or plc s7-300 can be defined by the users themselves communications protocols (for example ascii protocol), baud rate of 1.5 mbit / s (adjustable
24、). thus the scope of the communications can be greatly increased, the control system configuration more flexible and convenient. any serial interface with peripherals, such as: printer or bar code readers, the drive, a modem (modem), the upper pc can be connected to the machine. users can program to
25、 develop communication protocol to exchange data (such as: ascii character code), rs232 interface with the equipment available pc / ppi free cable linking communications communication. chip and chip holderslntegrated circuis are usually called ics or chips. thay are complex circuits, which have benn
26、 etched onto tiny chips of semiconductor(silicon). the chip is packaged in a plastic holder with pins spaced on a 0.1(2.54mm)grid, which will fit the holes on stipboard. very fine wires inisde the package link the chip to the pins.1) pin numbersthe pins are numbered anti-clockwise around the ic(chip
27、) starting near the notch or dot. it shows the numbering for 8-pin and 14-pin ics, but the principle is the same for all sizes.2) chip holders(dil sockets)ics(chip)are easily damageded by heat when soldering and their short pins cannot be protected with a heat sink. instead we use a chip holder, str
28、ictly called a dil socket(dil=dual in-line), which can be safely soldered onto the circuit board. the chip is pushed into the holder when all solding is complete.chip holders are only nedded when solding so they are not used on breaboards.commercially produced circuit boards often have chips soldere
29、d directly to the board without a chip holder ,usually this is done by a machine which is able to work very quickly .please donnot attemp to do this yourself because you are likely to destory the chip and it will be different to remove without damage by de-soldering.3) removing a chip from its holde
30、r4) if you need to remove a chip it can be gently prized out of the holder with a small flat-blade screwdriver. carefully lever up each end by inserting the screwdriver blade between the chip and its holder and gently twisting the screwdrive. take care to statre lifting at both ends before you attem
31、pt to remove the chip,otherwise you will bend and possibly break the pins.5) bipolar integrated circuits mos integrated circuitshistorically, bipolar integrated circuits used to be much more popular than mos integrated circuits,particularly for small-sace logic circuits. there were two major reasons
32、 for this: first, bipolar-junction transistors originally could be manufactured more reliably than mos transistors,and second , they were faster, as the reliabitity of mos transistors improved, and as integrated circuits became more complex , which made the lower power and small size of mos logic mo
33、re important, the popularity of bjt logic decreased, however, bjt technology is still popular for the highest frequency logic circuits. when the pc offline, under the control of the next crew, the entire system can operate normally. pc system 2.2 (central management workstation) pc 2.2.1 pc that is
34、by control centre, mainly by the pc and laser printer components, simatic wincc software platform used by the entire chinese user interface, friendly man-machine dialogue. management and operation, can be observed by pc-display all kinds of information to understand the current and previous controll
35、ed the entire ice storage system and the operation of all parameters, and equipment through the mouse print management and the implementation of tasks. 2.2.2 wincc software platform wincc software in the field of automation can be used for all operator control and monitoring tasks. process control c
36、an be in the events clearly show, can show that the current state records in accordance with the order, all the recorded data can be displayed or select summary form, or may be required for editing, and output print statements and trends . wincc able to control the process of the critical early stag
37、es of the report, and the signal can be displayed on the screen, and can also use voice demonstrated. it support the use of on-line help and operational guidelines to eliminate fault. wincc a specialized workstations can be used to control the process so that the important process information is not
38、 shielded. - aided software strategy assurance process is not illegal access, and provide for the industrial environment no wrong in the operation. wincc is micrsoft windows98 or windows nt4.0 operating system, running on a pc object-oriented class 32 applications, through windows ole and odbc stand
39、ard mechanism, as an ideal communications partners to enter windows world, and therefore can be easily wincc to integrate a company-wide data processing system. 3 ice storage system control 3.1 control objectives, scope and mainly controlled equipment storage control system control purposes: through
40、 the refrigeration host, ice storage devices, plate heat exchanger, the system pumps, cooling towers, piping system regulating valve control, ice storage system adjustment of the status of the operation mode, in the most economical circumstances to the terminal to provide a stable water supply tempe
41、rature. at the same time, improve the level of automation, improve the management efficiency and reduce labor intensity management. control of the ice storage system, including the entire state of the parameters, equipment status and control, the main control equipment: duplex status console, electr
42、ic valves, cooling towers, cooling water pumps, ice storage devices, the primary glycol pump, plate heat exchanger , sub-glycol pumps. 3.2 control control functions include the ice storage system stability, and economic operation of the required functions. 3.2.1 status of the conversion function dep
43、ending on the season and machinery operation, automatic control system with the following conditions conversion functions: a) duplex host ice conditions at the same time cooling mode; b) duplex status of a separate ice-making mainframe model; c) ice-storage devices and host joint cooling mode; d) of
44、 ice-melting separate cooling mode; e) for the console alone cold model. 3.2.2 the status of the start-up and shutdown, display and alarm functions fault control system according to the chronological layout with load forecasting software, mainframe and external control refrigeration equipment start-
45、up and shutdown of the surveillance equipment and the number of working conditions and operating parameters, such as: - commitment refrigeration console, status and fault alarm - refrigeration mainframe operating parameters - the protection of water cooling host - host for refrigeration / return wat
46、er temperature, pressure telemetry and display; - commitment chilled water pumps, status and fault alarm - glycol pump start-up and shutdown, status and fault alarm - start-up and shutdown cooling pumps, status and fault alarm - bypass pipe pressure measurement and display of pressure - the cooling
47、tower fan commitment, status and fault alarm; - for the cooling tower / backwater temperature control and display; - for / return water temperature, pressure telemetry control and display - the import and export side of plate heat exchanger temperature control and display; - ice storage devices impo
48、rt and export control and telemetry temperature display; - chilled water backwater flow control and display; - electric valve switch valve position adjustment and control and display; - outdoor temperature and humidity control and telemetry showed - ice storage and display of measurement - the end o
49、f cold load control. 3.2.3 data recording and printing functions control system for the monitoring of the needs of the trends point to the entire record, the control system can be the load throughout the year (including the maximum daily load and the load throughout the day) and equipment uptime as
50、tables and charts record for users . all monitoring points and the calculated data can be automatically print regularly. 3.2.4 manual / automatic conversion function flexible control system configuration manual / automatic conversion function. 3.2.5 optimized control function according to outdoor te
51、mperature, weather, weather trends, the historical record, such as mainframe data automatically select the priority or ice-melting priority. in the end load to meet under the premise of the daily use of the cold storage end, as far as possible to run mainframe. give full play to ice cold storage sys
52、tem advantages, saving operating costs. 3.2.6 automatic functionality from the pc system can work, in accordance with timetable for the automatic ice-making and control system operation, the conversion status of the system for automatic fault diagnosis, and remote alarm. touch screen display systems
53、 operations, processes, each node parameters and operating records, the police records. 3.2.7 holidays function set according to the timetable system can be run automatically, but also to pre-set holidays, and ice control certificates and certificates of ice time, the system does not require the hol
54、idays when the supply of cooling air-conditioned places to stop. 3.2.8 operating under the crew function lower-color touch-screen operator interface figure 1. under the crew operating functions are as follows: a) human-computer dialogue. operation can be carried out through the touch panel interacti
55、ve, user interface completely in the culture, with tips, help, parameter settings, key settings, fault enquiries, history and so on. b) system settings. including operation password settings, run setup, operation of the timetable set record overflow processing, automatic / manual / test selection, h
56、oliday settings, the system parameter settings (including the junction temperature, pressure, the media flow, reservoir ice, ice rate, the ice-melting rate of valve opening, the terminal load.) c) fault records, running records, historical records. remote control 3.3 control system through the telep
57、hone line or broadband network, and expert system connectivity, the system operation control, parameter changes, such as data acquisition, allowing the system to constantly improve and upgrade version of the software, allows users to get a better service. the purpose of the remote control users can
58、pstn (public switched transport network) on the remote frozen station at the remote monitoring. it may be remote debugging, remote monitoring and timely online maintenance, and so on, thus greatly mitigate the intensity of the work, lower cost of the project. 3.4 control system expansion control system design friendly interface, plc and touch screen can be extended, the content can be extended, parameters can be modified through the 485 communication interface or communications protocol bas cold storage and ice-c
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 全面營銷報(bào)告范文
- 2025年度跨境電商資金入股合作框架協(xié)議
- 2025年度藥店負(fù)責(zé)人薪酬福利與培訓(xùn)聘用合同
- 二零二五年度武漢租賃房屋租客信用評估合同
- 二零二五年度知識產(chǎn)權(quán)法律顧問合同示范文本
- 二零二五年度企業(yè)員工聘用合同協(xié)議書(含培訓(xùn)服務(wù))
- 二零二五年度柴油罐租賃與安全培訓(xùn)服務(wù)協(xié)議
- 2025年度智能交通系統(tǒng)分紅協(xié)議書
- 二零二五年度國有企業(yè)混合所有制改革股權(quán)轉(zhuǎn)讓協(xié)議書
- 浙江國企招聘2024寧波中浦投資控股集團(tuán)有限公司招聘29人筆試參考題庫附帶答案詳解
- 調(diào)機(jī)品管理規(guī)定
- 教學(xué)課件-古文陋室銘劉禹錫課件
- 主題班會教學(xué)課件:禁毒教育主題班會(共38張)
- 道路、橋梁、隧道、地鐵施工標(biāo)準(zhǔn)化手冊(專業(yè)篇)
- 初中人音版音樂七年級下冊.第二單元長江之歌.(14張)ppt課件
- NancyDrew分析
- 離心式排風(fēng)機(jī)安裝施工方案及技術(shù)措施
- 中西紀(jì)年對照表
- 粵勞社[2002]246號關(guān)于職工在機(jī)關(guān)事業(yè)單位與企業(yè)之間流動時(shí)社會保險(xiǎn)關(guān)系處理意見的通知
- 員工晉升審批表
- 通信防雷與接地系統(tǒng)PPT學(xué)習(xí)教案
評論
0/150
提交評論