1、國(guó)家安全生產(chǎn)監(jiān)督管理局辦公樓抗震加固及維修改造工程越南福和閘堰項(xiàng)目植樹施工方案中國(guó)水利水電建設(shè)集團(tuán)國(guó)際工程有限公司越南福和閘堰項(xiàng)目部二O一年九月十五日1、概述及主要工程量越南福和閘堰項(xiàng)目植樹面積49.27公頃。分布于左岸進(jìn)場(chǎng)道路旁邊,業(yè)主管理房周 圍,和土壩下游區(qū)域。2、施工工藝流程及主要施工方法施工工藝流程:表(層)面處理t測(cè)量定位t挖種植穴t樹苗檢查t植樹t養(yǎng)護(hù)。2.1表(層)面處理:需要植樹的部位用推土機(jī)大致推平,鏟除表面的雜草,灌木等影響樹木生長(zhǎng)的雜物。2.2定點(diǎn)放樣測(cè)量人員進(jìn)行定點(diǎn)的放樣,嚴(yán)格按照一公頃面積植樹440棵放樣(即植樹間距4.77 米),測(cè)量后做明顯標(biāo)記。2.3挖種植穴:
2、種植穴直徑60cm深度為60cm要求坑壁光滑,上下面口徑基本一致。2.4樹苗檢查樹干挺直,沒有明顯彎曲,無蛀干害蟲和未愈合的機(jī)械損傷;樹冠豐滿,枝條分布 均勻、無嚴(yán)重病蟲危害,樹葉正常;根系發(fā)育良好、無嚴(yán)重病蟲危害;土球大小為苗木 胸徑的10倍以上。2.5植樹2.5.1種植的質(zhì)量標(biāo)準(zhǔn):種植的苗木品種為景觀樹柚樹,苗木的本身與地面垂直,沒有傾斜;嚴(yán)格按照測(cè)量定點(diǎn)種植,橫平豎直,樹木應(yīng)在一條直線上;樹苗高度為1.5米左右,相鄰兩株高差不超過30cm種植深淺與原土痕持平;保持樹苗土球完好,包裝物應(yīng)取出。2.5.2種植的程序和方法:樹木入穴后,土球放穩(wěn),樹干直立,拆除并取出包裝物;種植后在樹木四周筑成
3、高5- 10cm的灌水土堰,方便澆水;種植后需要支撐的樹木,用樹枝或者竹竿支撐牢固, 使樹木保持直立;新植樹木 24小時(shí)內(nèi)澆第一遍水,三日內(nèi)澆第二遍水,十日內(nèi)澆上第 三遍水,三遍水后轉(zhuǎn)入后期養(yǎng)護(hù);每次澆水后均整堰、堵漏、培土、扶直樹干,第三遍 水后封堰。2.6養(yǎng)護(hù):新植樹苗完成后進(jìn)行養(yǎng)護(hù),主要項(xiàng)目包括:澆水、防治病蟲、補(bǔ)栽未成活樹苗、直至交付驗(yàn)收。3、施工設(shè)備及人員配置3.1施工設(shè)備序號(hào)機(jī)械設(shè)備名稱規(guī)格型號(hào)單位數(shù)量備注1自卸汽車10t臺(tái)12推土機(jī)SD23臺(tái)13水泵2寸臺(tái)54全站儀PENTAX臺(tái)1R -322NX5水桶/只若干序號(hào)機(jī)械設(shè)備名稱規(guī)格型號(hào)單位數(shù)量備注6鋤頭/把若干7鐵锨/把若干3.2
4、主要?jiǎng)趧?dòng)力配置主要?jiǎng)趧?dòng)力配置表序號(hào)工種數(shù)量(人)備注1自卸汽車駕駛員12推土機(jī)駕駛員13測(cè)量工44普工25合計(jì)3110Con tract 1A Phuoc Hoa HeadworksConstruction Method for Tree PlantingED國(guó)2K電建設(shè)集園國(guó)際工程有眼處司SIKOHYDRO CORPORATION LTD.September 15 th 20111、General including main construction quantitiesThe tree planting area for the Vietnam Phuoc Hoa headworks o
5、ccupied 49.27hamainly distributed at two sides of the left bank access road, the surroundingof the Employer ' s management house and the downstream area of the earth dam.2、Construction Process and Main MethodCon structi on Process:Surface Treatme nt Survey for positi oning Pit Excavati on Check
6、ing of theSapli ng Pla nti ng Maintenance2.1 Surface Treatme ntLevel the planting area by bulldozer, and remove the weeds and bushes atthe surface which will impact the growing of the trees.2.2 Setti ng OutSetting out by the survey staff, strictly keeping the spacing by 4.77m basedon 440 trees per h
7、a, and make marks after setting out.2.3 Excavati on of the Pla nting Pits:The pla nti ng pits will be excavated with dia 60cm and 60cm of depth, withsmooth walls, con siste nt dime nsions for the ope ning and the bottom part.2.4 Checking of the SaplingSapli ng should be straight body, no obvious ben
8、ding, no harm by the in sects or physical surface injury; rich crown with evenly distributed branches without any disease or harmful in sects, with healthy leaves; grow n root without any disease or harmful in sects;soil ball should be 10 times larger tha n the diameterof the breast branch of the sa
9、pli ng.2.5 Pla nti ng2.5.1 Quality Stan dard:The category of the sapling to plant is teak as Iandscape trees. The sapling itself should be plated vertically toward the land without any slant. The trees should be planted strictly according to the setting out points, ordered in rows and lines with tre
10、es on a straight line; the height of the sapli ng should be about 1.5m and the height differeneebetween saplings should be no larger than30cm; the planting depth should be leveled with the surrounding earth; the soil ball of the sapling should be finely kept without any packing material.2.5.2 Pla nt
11、ing Process and Method :After saplings are buried in the pit, the soil ball should be steady withupright branch after removal of the packing; earth ridge around the saplingswill be built at 5 to 10cm height to make watering easier; for the tree whichn eeds to be supported after pla nted,using bran c
12、hes or bamboo sticks forenhancing to keep the sapling straight; first watering should be carried out within 24 hrs for the new planted sapling, second watering is within 3 days, third watering is within 10days, last maintenance period will be carried out after the third time watering. Earth ridge ar
13、ound the tree should be done trim, seal water lose, earth backing and upright support during every watering, and earth ridge will be sealed after the third time wateri ng.2.6 Maintenance :The maintenance works for the new planted saplings will be carried out after they are put into the planting pit.
14、 The maintenance works consist of continuing wateri ng, disease and in sect con trol, sec ond time pla nt for the failure sapli ngs, un til delivery.3、Arrangement of the Machines and Labor Force 3.1 Con structi on Mach inesNo.Machi ne ItemSpecificationUnitQtyRemarks1Dump Truck10tSet12BulldozerSD23Set13Pump2寸Set54Total StationPENTAXSet1R -322NX5Water Barrel/
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年新婚姻法離婚協(xié)議書定制與婚姻解除后續(xù)事務(wù)處理合同3篇
- 二零二五年度城市景觀鋁合金門窗設(shè)計(jì)與安裝工程合同3篇
- 2025年新能源汽車租賃與綠色出行教育合作合同3篇
- 2025年訴訟保全擔(dān)保流程執(zhí)行與風(fēng)險(xiǎn)控制合同3篇
- 二零二五年度旅游管理體系認(rèn)證咨詢服務(wù)協(xié)議3篇
- 2025年水泥生產(chǎn)廢水處理合作合同3篇
- 二零二五年度路燈照明產(chǎn)品售后服務(wù)合同4篇
- 2025年度高新技術(shù)成果轉(zhuǎn)化貸款借款合同4篇
- 二零二五年度清潔服務(wù)合同-體育館運(yùn)動(dòng)場(chǎng)清潔與消毒
- 2025年度綠色環(huán)保公寓購(gòu)置合同范本4篇
- 2025年河北供水有限責(zé)任公司招聘筆試參考題庫(kù)含答案解析
- Unit3 Sports and fitness Discovering Useful Structures 說課稿-2024-2025學(xué)年高中英語人教版(2019)必修第一冊(cè)
- 農(nóng)發(fā)行案防知識(shí)培訓(xùn)課件
- 社區(qū)醫(yī)療抗菌藥物分級(jí)管理方案
- NB/T 11536-2024煤礦帶壓開采底板井下注漿加固改造技術(shù)規(guī)范
- 巴布亞新幾內(nèi)亞離網(wǎng)光儲(chǔ)微網(wǎng)供電方案
- 高度限位裝置類型及原理
- 中文版gcs electrospeed ii manual apri rev8v00印刷稿修改版
- 新生兒預(yù)防接種護(hù)理質(zhì)量考核標(biāo)準(zhǔn)
- 除氧器出水溶解氧不合格的原因有哪些
- 沖擊式機(jī)組水輪機(jī)安裝概述與流程
評(píng)論
0/150
提交評(píng)論