1、GZD-420×110振動(dòng)喂料機(jī)使用說明1. 機(jī)器的用途本機(jī)是利用振動(dòng)原理進(jìn)行給料的設(shè)備,適用于選礦,建材,硅酸鹽和化學(xué)工業(yè),以下道工序遞給(帶篩分)粒度不大于580mm的礦石和巖石。2. 機(jī)器型號(hào)及說明主要技術(shù)參數(shù)機(jī)器料槽尺寸(長(zhǎng)寬)4200×1100mm最大給料尺寸580mm偏心軸轉(zhuǎn)速810 r/min給料能力120240t/h電動(dòng)機(jī)型號(hào)、功率、轉(zhuǎn)速Y160-4/15KW1400r/min重量4600KG3. 工作原理與結(jié)構(gòu)特征GZD-420×110型振動(dòng)喂料機(jī)主要由振動(dòng)機(jī)架、彈簧、振動(dòng)器、電機(jī)振動(dòng)架及電機(jī)組成。激振器是由二個(gè)特定位置的偏心軸以齒輪相嚙合組成,

2、裝置時(shí)必須使兩齒輪按標(biāo)記相嚙合,通過電動(dòng)機(jī)驅(qū)動(dòng),使兩偏心軸旋轉(zhuǎn),從而產(chǎn)生巨大合成的直線激振力,使機(jī)體在之承彈簧上作強(qiáng)制振動(dòng),物料則以此振動(dòng)為動(dòng)力,在料槽上作滑動(dòng)及拋擲運(yùn)動(dòng),從而使物料前移而達(dá)到給料目的。當(dāng)物料通過槽體上的篩條時(shí),較小的料可同篩條間隙而落下,可不經(jīng)過下道的破碎工序,起了篩分的效果。4. 機(jī)器的安裝調(diào)試與運(yùn)轉(zhuǎn)本機(jī)由制造廠裝配合成臺(tái)供應(yīng),并經(jīng)過空車實(shí)驗(yàn)。用戶收貨后,應(yīng)仔細(xì)檢查,以便發(fā)現(xiàn)和排除在運(yùn)輸中可能帶來的問題。機(jī)器的安裝,調(diào)試和試運(yùn)轉(zhuǎn)應(yīng)注意: 由于本機(jī)振動(dòng)較大,故建議將機(jī)器安裝在混泥土基礎(chǔ)上,基礎(chǔ)高度、深度和面積應(yīng)按土質(zhì)條件,單獨(dú)計(jì)算。建議基礎(chǔ)重量大致為機(jī)器重量的1.5倍。機(jī)器安

3、裝尺寸可參閱基礎(chǔ)圖。喂料機(jī)基礎(chǔ)高度及出料形式根據(jù)地形條件采用鋼結(jié)構(gòu)或混凝土臺(tái)增減高度以使用下道工序的要求。(用戶自定) 本機(jī)的排料溜槽均屬機(jī)器的附屬固定裝置,與喂料機(jī)體的豎直方向間隙應(yīng)保持90mm,水平方向的間隙應(yīng)保持30mm。安裝電機(jī)及支架,應(yīng)使電機(jī)槽輪與激振器槽輪中心線與水平線均成45度,電機(jī)支撐板與電機(jī)支架底板成15-20度,并注意符合圖中所振動(dòng)器的旋轉(zhuǎn)方向。激振器中注入潤(rùn)滑油,機(jī)器安裝調(diào)整妥后,進(jìn)行試運(yùn)轉(zhuǎn)??蛰d試車應(yīng)達(dá)到:(1)連續(xù)運(yùn)轉(zhuǎn)2小時(shí);(2)所有緊固件牢固,無松動(dòng)現(xiàn)象;(3)所有摩擦部位無損傷,掉屑和研磨現(xiàn)象,無不正常的響聲,震動(dòng)穩(wěn)定。負(fù)載試車除達(dá)到空載試車要求外,還應(yīng)滿足如下

4、要求:(1)在為喂料機(jī)送料時(shí),不能使物料強(qiáng)烈沖擊機(jī)器槽體,不許偏載加料和堆滿加料,以免損壞機(jī)體,支撐彈簧及影響機(jī)器穩(wěn)定振動(dòng)。(2)給料最大粒度應(yīng)符合規(guī)定。5. 機(jī)器的操作和規(guī)定啟動(dòng)前的準(zhǔn)備工作:1 閱讀值班記錄,處理上一班的遺留問題;2 檢查并排除機(jī)體與溜槽,彈簧及支承座之間有無物料等影 響機(jī)體運(yùn)動(dòng)的雜物;3 仔細(xì)檢查所有緊固件是否安全緊固;4 檢查激振器內(nèi)的潤(rùn)滑油是否高于油標(biāo)高度;5 檢查傳動(dòng)皮帶是否良好:如發(fā)現(xiàn)破損時(shí)應(yīng)更換;有油污時(shí),用抹布將其擦干凈;6 檢查防護(hù)裝置良好,發(fā)現(xiàn)有不安全現(xiàn)象時(shí)應(yīng)及時(shí)排除。啟動(dòng):1 經(jīng)檢查,機(jī)器與傳動(dòng)部分情況正常,始可啟動(dòng);2 本機(jī)僅允許在無載荷情況下啟動(dòng);3

5、 啟動(dòng)后,如發(fā)現(xiàn)有不正常現(xiàn)象時(shí),應(yīng)立即停車,待查明和排除不正常情況后,方可再啟動(dòng)。使用:1. 本機(jī)穩(wěn)定振動(dòng)后,方可帶料運(yùn)行;2. 加料應(yīng)符合負(fù)載試車要求;3. 停機(jī)應(yīng)按工藝順向進(jìn)行,禁止帶料停機(jī)時(shí)停機(jī)后繼續(xù)給料。6. 機(jī)器的維護(hù)與安全技術(shù)經(jīng)常的維護(hù)和檢修延長(zhǎng)機(jī)器使用壽命,確保正常工作的重要手段,用戶應(yīng)予以重視,對(duì)于潤(rùn)滑,應(yīng)注意以下幾點(diǎn):1 本機(jī)采用溪油潤(rùn)滑,潤(rùn)滑油應(yīng)根據(jù)使用地點(diǎn),氣候條件決定,一般采用20#齒輪油;2 應(yīng)保證激振器中的稀油面高于油標(biāo)高度(通過管接頭彎管注),每3-6個(gè)月更換一次,換油時(shí)應(yīng)用潔凈的汽油或煤油清洗油箱,軸承滾道及齒輪表面。安全技術(shù):1 本機(jī)操作人員,必須安全技術(shù)教育

6、;2 運(yùn)轉(zhuǎn)時(shí),嚴(yán)禁機(jī)邊立人、用手觸摸機(jī)體、調(diào)整、清理或檢修等;3 機(jī)器設(shè)備應(yīng)接地,電線應(yīng)可靠絕緣,并裝在蛇皮帶內(nèi),經(jīng)常檢查電機(jī)接線是否磨損和漏電。7. 易損件明細(xì)表零件名稱數(shù)量彈簧10側(cè)護(hù)板6底護(hù)板3篩條8GZD-420×110 Vibration Feeder Operation Manual I .ApplicationsThis machine makes use of the principle of the vibration. It is applied for mill runing,construction,silicate and chemistry industr

7、y.It can equably supply the stone with the size of lower than 580 mm for line.II. Specification & InstructionsIII. Main Technical ParametersFunnel size (L*W)4200*1100mmMax feeding size580mmEccentric shaft speed810r/minFeeding capacity 120240t/hMotor Model、Power、 Rotate speedY160-4/15KW1400r/min

8、Weight4600KGIV. Main Technical Parameters GZD-420*110 vibrating feeder mainly consists of bracket, spring, vibrator, and motor shaking device, motor as well. Vibration exciter composed of two eccentric shafts on the certain part with the jogged gear wheels. In the installation, you must make sure th

9、ese gear wheels joggled according to the sign. The power drives these accentric shafts circumrotating,which produce the huge linear exciting force to make the machine to vibrate strongly on the supporting spring. The material can use power move on the funnel.This can force the material move ahead so

10、 as to attain the aim of feeding.When the material go through the screen on the funnel, the small particle can fall through the screens clearance directly .V. Installation, and debugging This machine is assembled by the making factory,and also tested by them already before delivery. After receiving

11、the machine, users need to exam it carefully so as to find and get rid of the errors through the transportation in time. The installation, debugging and trying-operation must be paid more attentions as follows:1. Due to the strong vibration, the machine should be installed on the concrete base. The

12、height, the depth and the area should be caculated solely based on the different soil condition. It is advisable to make the basis weight 1.5 times of the total weight of the machine. As for the Installation measurement, please refer to the drawing. For feeder machine, the basic height and dischargi

13、ng form can adopt steel or concrete construction. The height can be adjusted by customer to meet the next working procedures requirement.2. The discharging chute of this machine all belong to subsidiary fixture, which should be kept 90mm from the interval in vertical direction: 30mm in horizontal di

14、rection.3. The Installation for electric motor and frame should make the geneva wheel of motor and vibration exciter meet at an angle of 45 degrees between center line and horizontal line. The electrical motor surpporting board and baseplate take on 15-20 oC. Meantime, please be sure to be in line w

15、ith the rotational direction of the vibration device in the picture.4. Cleaning the antirust oil on the shaking device, immitting the lubricant oil at the same time, when the fixing and testing activities finished, then run the machine for a trial. 5. The unloaded working machine should achieve some

16、 requests as follows:4 Operating for 2 hours in succession.5 All fasteners should be firm and there is on phenomenon of becoming flexible.6 All frictional position don't present the condition of scotching, chipping and grinding. There is no abnormal noise. Steady state vibration.7 As feeding mat

17、erials, make sure that the materials can not impact machine, and not allowed to feed deflection or in pile so as to protect the machine, the surpporting spring and make the machine working steadily.(1) The max feed size should according to the rules.VI. Operation Rules Of The MachineThe preparation

18、work before running(1) Check the note on duty and deal with the problem on last shift.(2) Check out and get rid of sundries that can stop working between main body and chute, spring and bracket. (3) Check carefully to be sure that all the fasteners are firm.(4) Check out whether the surface of lubri

19、cating oil is higher than the height of mark. (5)Check out whether the conveyor belt is good. If it is dishclothed, should replace it timely. If there is smeary, then please rub it cleanly by a rag.(6)Check out whether the protective device is in good condition, if any unsafe phenomenas appear, one

20、should get rid of them in time.Sarting(1) Start after make sure the machine and its transmission part are normal(2) This machine should be started unloaded.(3) Stopped immediately when some abnormal state took on. Examing and eliminating these bad condition, then restart it once again. Using(1) Afte

21、r shaking steadily,it can run with material.(2) Feeding material should meet the requirement of running unload.(3) Stopping activity should be carried out along with the technological process, it forbids to stop machine with materials inside or continue to feed as it is stopped.VII. Maintenance and

22、Safety Technology3 Frequent Maintenace and overhaul is an important means to lengthen machine service life and gurantee normal work. User should pay attention to the following points as lubrication:4 The lubricating oil used in this machine is thin oil. It is decided by the working place and the temparature. Normally, to adapt 20# oil.(1) Make

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論