1、.天馬行空官方博客: ;QQ:1318241189;QQ群:175569632CONTINUOUS IMPROVEMENT GP-8 PURPOSE: GP-8 defines the supplier's responsibility to have an on-going process for continuously improving the product by improving manufacturing processes to reduce variation and to insure the process has capability and stabilit
2、y over time. It outlines the customer expectations for the suppliers after a part has satisfactorily completed Production Part Approval Process (PPAP) and Early Production Containment (GP-12). (See page 8.)1.0 SCOPE - The GP-8 procedural criteria applies to all General Motors suppliers, including Ge
3、neral Motors allied and affiliated manufacturing operations, and is applicable for all parts and materials even when the customer has not requested data to be provided.2.0 BASIC QUALITY REQUIREMENTS - All suppliers are required to have in place quality systems that insure parts shipped to the custom
4、er meet specification. Further they are expected to have an action plan and the necessary controls to maintain and improve the process capability of designated key product characteristics (KPC's).2.1 BASIC QUALITY MEASURES - In evaluating their effectiveness in meeting the basic requirements of
5、GP-8, the supplier should monitor the following measures:A. Voice of the customer. These measures reflect quality performance as seen by the customer.· Defective parts shipped to the customer.This measure represents the number of non-conforming parts found at the customer's location, and is
6、 expressed in parts per million (PPM).· Compliance with GP-5. Problem Reporting and Resolution (PR/Rs) are issued by the customers for problems in connection with a supplier's quality, packaging and delivery performance. Specifically measured are timely response and the elimination of repea
7、ted nonconformance.B. Voice of the process. These measurements reflect quality performance as seen by the supplier at the suppliers' facility.Long term process performance on KPC's. Variation on key product characteristics reflects the variation in the process and is a result of a supplier
8、39;s ability to control the input variables of a process. Long term process performance is measured as a Ppk value.*(Note: See Chrysler, Ford and G.M. Production Part Approval Process Manual, for discussion on initial approval requirements, and ongoing minimum requirements.)· First Time Quality
9、 is a measure of a process' ability to make quality parts without scrap or rework. Whenever a supplier's process causes scrap or requires parts to be reworked there is undesirable variation in the input variables. Reducing and controlling the variation in the input variables presents an oppo
10、rtunity for continuous improvement.N= number of parts started in the process S = number of parts scrapped R= number of parts to be reworked/repairedCONTINUOUS IMPROVEMENT GP-83.0 CUSTOMER EXPECTATIONS FOR THE SUPPLIERS' CONTINUOUS IMPROVEMENT PROCESS - Upon successfully meeting the criteria for
11、exiting Early Production Containment (GP-12), the supplier is responsible to have a quality system that continues to produce material over the long term that meets specifications. All suppliers are expected to measure their quality performance and work for continuous improvement on all parts. The pr
12、ocess is to have the support and involvement of the suppliers' top leadership.3.1 GOAL OF CONTINUOUS IMPROVEMENT - The goal of the continuous improvement process is to reduce variation in the manufacturing process and to improve the quality of the parts produced. * See the Chrysler, Ford, GM Fun
13、damental SPC Reference Manual pages 80-81 for further information. 3.2 IDENTIFYING PROCESSES FOR CONTINUOUS IMPROVEMENT - Suppliers should concentrate their efforts on reduction of process variation by listening to the voice of the process and the voice of the customer.In analyzing first time qualit
14、y data, the part of the process that creates scrap or when parts require rework is the point in a process needing variation reduction.In monitoring KPCs, special and common causes of variation are identified as candidates for variation reduction.PR/Rs from the customer and an analysis of parts rejec
15、ted by the customer (PPM) also can lead to the discovery of process variation that needs to be reduced.3.3 ACTIVITIES TO IMPLEMENT CONTINUOUS IMPROVEMENT - Suppliers should have an organized approach to IDENTIFYING the manufacturing processes that need to receive variation reduction efforts.For thos
16、e processes identified, individuals and/or quality improvement work groups should be assigned to analyze the cause of process variation and devise and implement change for improvement.The work groups should be knowledgeable in problem solving techniques and should incorporate:Error Proofing Techniqu
17、es: to prevent or warn of defects.Design of Experiments: to identify which of the process' input variables, or combinations of input variables, cause the undesirable output variable in the product.Suppliers should have a follow-up mechanism to insure items for improvement are implemented and ver
18、ified.4.0 VERIFICATION OF A SUPPLIERS' CONTINUOUS IMPROVEMENT PROCESS BY THE CUSTOMER - It is expected that the supplier will maintain documentation supporting the continuous improvement activities conducted in their facilities. The customer may, at their option, review a supplier's continuo
19、us improvement efforts periodically.4.1 VERIFICATION FORMAT - When the customer notifies the supplier that a verification meeting is to be conducted, the supplier will prepare his documentation showing improvement trends over time and explaining activities to support the continuous improvement effor
20、t.Further, the supplier will complete the "Supplier Continuous Improvement Status Report" (see attached sample and blank form). The purpose of the "Supplier Continuous Improvement Status Report" is to summarize, using a common format, the current status of the suppliers' part
21、s and processes.*;CONTINUOUS IMPROVEMENT GP-8Supplier Continuous Improvement Status Report- INSTRUCTIONS FOR COMPLETION -1. Supplier company name complete.2. Z Code is the shipping code assigned by General Motors. If other supplier numbering systems are used, place the number in this area.3. This is
22、 the number assigned by Dun and Bradstreet to your location. If a CISCO number has been assigned to your location, use the CISCO number.4. This is the General Motors location where your parts are shipped.5. This is the date the status report was completed.6. This number is used for reference to the
23、detailed data on the back of the form.7. The part number for the part to be included in the report. Where families of parts have been agreed upon all parts in the family must be included.Note: If a part number changes due to an engineering change, list the new number and reference the former part nu
24、mber in thc "Comments" column.8. The part description must agree with the part nomenclature on the part print. Note: Use this column to show when family parts are involved including less finished numbers where appropriate.9. Model Year is the model year the part is introduced.10. This is t
25、he date that the part received PPAP approval from the customer.11. The parts per million (PPM) is calculated as the number of non-conforming units divided by the number of units shipped for the reported period. This number is multiplied by one million to get the PPM value.12. This column should show
26、 the number of PR/R's issued against the part number or family of parts. Any PR/R's issued against a part will be reviewed to insure that GP-5 has been followed and at timely responses have been given and problems haven't reoccurred.a. Number issued.b. Number of initial responses on-time
27、.c. Number of final responses on-time.13. Key Product Characteristics Summary:a. The total number of KPC's assigned at the particular part number is to be numbered in this column.b. Of the total number of KPC's, those that are for attribute characteristics are to be entered in this column.c.
28、 When your control charts for attribute characteristics (p, c, np, u charts) show a value grater than (0) zero, enter the total of these characteristics in this column.d. Variable characteristics that have a Ppk value less than 1.00 are to be counted in this column.e. Variable characteristics that h
29、ave a Ppk value greater than or equal to 1.00 and less than 1.33 are to be counted in this column.f. Variable characteristics that have a Ppk value greater than or equal to 1.33 are to be counted in this column.g. Variable characteristics that have a Ppk value greater than or equal to 1.67 are to be
30、 counted in this column.CONTINUOUS IMPROVEMENT GP-813. First Time Quality is the percent of parts which enter the process that are produced without scrap, reoperation or rework.N = number of parts started in the process.S = number of parts scrapped.R = number of parts to be reworked/repaired.Note: F
31、irst Time Quality is not necessarily a continuous measure. The FTQ measure is developed and analyzed to identify sources of variation within the process. Later, the FTQ measure is again developed to evaluate the effectiveness of the continuous improvement efforts.14. Comments to include information
32、concerning:· actions to get a KPC in control and/or stable.· actions to contain non-conforming parts that were shipped to the customer.· changes in part numbers due to an engineering change.· any other appropriate information. Note: If additional space is needed attach another sh
33、eet of paper and note it in the "comments" column.- KEY PRODUCT CHARACTERISICS DETAIL -13. This number is used for reference to the detailed data on the front of the form.14. The part number is to correspond to the part number on the front page.15.13. a. Up to 12 KPC's per part can be
34、listed. If there are more than 12 KPC's on a part use additional lines. (Corresponding lines on the front page should be skipped).b. PR is the performance ratio for variable data and is calculated asNote: For attribute characteristics enter the percent non-conforming number in this column.c.b. Ppk is the performance index for variable data and it is calculated as the minimum ofNote: For attribut
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 二零二五年度股權(quán)質(zhì)押資產(chǎn)重組合同示范文本3篇
- 二零二五年度鋼材倉(cāng)儲(chǔ)物流服務(wù)合同9篇
- 二零二五年度路燈照明設(shè)施安全檢測(cè)合同樣本2篇
- 二零二五年度:勞動(dòng)合同法實(shí)務(wù)操作與案例分析合同3篇
- 二零二五年度船舶建造與設(shè)備安裝合同2篇
- 二零二五年度農(nóng)產(chǎn)品質(zhì)量檢測(cè)合同范本3篇
- 二零二五年度安置房買賣合同電子支付與結(jié)算規(guī)范3篇
- 3、2025年度綠色出行接送機(jī)服務(wù)合同范本2篇
- 二零二五年度文化創(chuàng)意產(chǎn)業(yè)合作開發(fā)合同范本3篇
- 家里陪護(hù)合同(2篇)
- 2024-2025學(xué)年五年級(jí)科學(xué)上冊(cè)第二單元《地球表面的變化》測(cè)試卷(教科版)
- 小區(qū)物業(yè)服務(wù)投標(biāo)方案(技術(shù)標(biāo))
- 2024-2030年中國(guó)光電干擾一體設(shè)備行業(yè)發(fā)展現(xiàn)狀與前景預(yù)測(cè)分析研究報(bào)告
- 2025屆高考數(shù)學(xué)一輪復(fù)習(xí)建議-函數(shù)與導(dǎo)數(shù)專題講座課件
- 心電圖基本知識(shí)
- 中煤電力有限公司招聘筆試題庫(kù)2024
- 消防接警員應(yīng)知應(yīng)會(huì)考試題庫(kù)大全-上(單選、多選題)
- 2024風(fēng)電場(chǎng)在役葉片維修全過程質(zhì)量控制技術(shù)要求
- 湖南省岳陽(yáng)市岳陽(yáng)樓區(qū)2023-2024學(xué)年七年級(jí)下學(xué)期期末數(shù)學(xué)試題(解析版)
- 自適應(yīng)噪聲抵消技術(shù)的研究
- 山東省臨沂市羅莊區(qū)2024屆中考聯(lián)考化學(xué)試題含解析
評(píng)論
0/150
提交評(píng)論