1、Rev.DateCompiled byReviewApproval地腳螺栓安裝程序Procedure for an chor bolt erectionDocume nt No.PROJECTOWNEROWNER S ENGINEEREPC CONTRACTORCONTRACTOR S ENGINEER地腳螺栓安裝程序Procedure for Anchor Bolt Erection一、施工工藝流程 Construction Process1、在柱頭砼施工后,應(yīng)檢查地錨框的預(yù)埋件中心線和標(biāo)高。中心線的測(cè)量工作應(yīng) 由專職測(cè)量員用全站儀復(fù)核。埋件表面清理干凈,并放出地錨框中心線。Check th
2、e center line and EL for embedded part of anchor bolt rack after concrete pouring of short column. The professional surveyor will review the center line with total station. The surface of embedded part should be cleaned up and marked center line for anchor bolt rack.2、檢查地錨框的焊接質(zhì)量和規(guī)格、數(shù)量及配件情況,清點(diǎn)地腳螺栓的數(shù)量
3、、規(guī)格 及配件情況,發(fā)現(xiàn)不符合設(shè)計(jì)要求時(shí),應(yīng)及時(shí)處理。地錨框上的油污、泥土等應(yīng)清理 干凈,浮銹應(yīng)提前除掉,所有構(gòu)件不得刷漆。Check the specification, quantity and accessory etc of anchor bolt rack and anchor bolt, and inspect welding quality of anchor bolt rack, dispose of anyone which is not in accordance with design requirement. Oil contamination and mud on a
4、nchor bolt rack should be cleaned up, float rust should be removed in advance, and all parts cannot be painted.3、地錨框焊接安裝之前應(yīng)處理好柱頭施工縫, 不得在地錨框安裝后進(jìn)行鑿毛作業(yè), 以免地錨框等被碰位移。上段柱箍筋應(yīng)待地錨框和地腳螺栓安裝后綁扎。地錨框與柱 頭埋件焊接前中心線和垂直度應(yīng)粗調(diào), 調(diào)好后滿焊于埋件上, 焊縫高度不得小于 6mm。 為防止焊接變形,采取對(duì)稱同時(shí)進(jìn)行施焊。Dispose of construction joints of short column bef
5、ore anchor bolt rack welding and erection, cannot do the daubing work after anchor bolt rack erection, to avoid anchor bolt rack from being bumped and displacement. The rebar colligation of up section column should be done after the erection of anchor bolt rack and anchor bolt. Center line and verti
6、cality should adjust coarse before welding anchor bolt rack to embedded part of short column, full weld to embedded part after fine adjustment and welding height cannot be less than 6mm. Adopt symmetrical welding at the same time to avoid welding deformation.4、螺栓粗裝 Bolt coarse erection(1)、按圖紙?jiān)O(shè)計(jì), 將螺栓
7、掛在地錨框上。 放置時(shí)應(yīng)分清螺栓的上下絲頭,避免將 螺栓倒置;螺栓應(yīng)基本放垂直。Hang bolt in anchor bolt rack according to drawing design. Distinguish the upside and bottom screw when place bolt, avoid bolt inversion; the bolt should be placed vertical elementary.(2)、用水準(zhǔn)儀測(cè)量、調(diào)整螺栓標(biāo)高,螺栓頂標(biāo)高按照+5mm至+10mm施工。Measure and adjust bolt EL with dump l
8、evel and the EL of bolt top is +5mm to +10mm.5、螺栓精裝 Bolt fine erection( 1 )、將地腳螺栓插入固定框, 先初步找正頂部軸線位置,再找正垂直度,使其符 合規(guī)范要求,然后在底部焊拉結(jié)條于扶設(shè)架上使之穩(wěn)固。Insert Anchor bolt into anchor bolt rack, alignment top axis place preliminary, then alignment verticality, to make sure it is accordance with specification require
9、ment, afterward weld steel board at bottom of bolt to support and make it stable.( 2)、用經(jīng)緯儀或掛線、 吊線墜檢查校正螺栓相對(duì)位置、標(biāo)高和垂直度,校垂直度 應(yīng)在兩個(gè)互相垂直方向進(jìn)行。方法是:根據(jù)測(cè)量劃出的基準(zhǔn)點(diǎn),用 24 號(hào)鋼絲拉出基座 控制中心線,依控制中心線量出與地腳螺栓組或螺栓中心線垂直方向的相距位置; Check and adjust relative place, EL and verticality of bolt through theodolite or hanging line and pl
10、umb line, and check verticality from two mutual vertical directions. The method is: according to the datum mark set out with total station, pull out pedestal control center line with #24 steel wire. Base on the control center line to set out the position of anchor bolt group or the vertical directio
11、n against bolt center line.( 3)、用水平儀測(cè)量每個(gè)螺栓的頂標(biāo)高,標(biāo)高由底部調(diào)平螺母找平。Measure every bolt top EL by dump level. EL should be adjusted through bottom adjusting nut.( 4)、在每根地腳螺栓周圍焊四個(gè)小螺栓,通過調(diào)節(jié)小螺栓, 來微調(diào)地腳螺栓的平面位置 Weld four small bolts around every anchor bolt; fine adjust plane position of anchor bolt through adjustin
12、g these small bolts.( 5)、經(jīng)校正平面位置、 標(biāo)高及垂直度后, 各技術(shù)指標(biāo)均控制在安裝精度允許范圍 以內(nèi),將螺栓逐根上螺絲帽;下部兩個(gè)不同方向鋼板與扶設(shè)架可靠連接,將螺栓下端 固定。Every qualification is under erection precision allowed range after adjusting plane position, EL and verticality. Fix screw cap for bolt one by one; two steel board from different directions of bott
13、om reliable connect to support, fasten lower part of bolt.二、施工注意事項(xiàng) Construction Notices1、地腳螺栓應(yīng)全部帶線,施工線采用細(xì)鋼絲,各柱子之間的地腳螺栓必須拉對(duì)角 線檢查,確保相對(duì)位移。All anchor bolts should be pulled center line; construction line should adopt fine steel wire. Check the diagonal line of the anchor bolts between columns to ensure
14、relative position.2、地腳螺栓上部用鋼管鎖死,外漏部分用塑料布緊纏,防止砼澆筑污染。The top of anchor bolt should be closed by steel pipe; the outside part should be tied up by plastic cloth to prevent concrete pouring pollution.3、 砼澆筑時(shí)必須分層均勻進(jìn)行,地腳螺栓四周厚度偏差不得超過15cm。且澆筑時(shí) 垂直下料,不得直接沖撞地腳螺栓和地錨框。Pour concrete layer by layer, concrete thick
15、ness deviation around anchor bolt cannot exceed 15cm.Pouring concrete verticality to prevent anchor bolt and anchor bolt rack from bumping directly.4、砼澆筑完后,先將螺栓表面清理干凈,涂刷潤滑油,用塑料薄膜緊纏后,再加 套管保護(hù)Clean up bolt surface first, paint lubricant and tied up by plastic cloth after concrete pouring, afterwards, a
16、dd drivepipe for protection.List Task with All Task Steps(W HO WILL DO WHAT , WHERE AND WHEN )Potential and Existing H azards"QzJO BA on_=-K o F OCOCRRRECEQO NOXTIOU咤CE OF OCCURRRECE -SKTXxWXnRank'Tfejp 7r-=-K "Hoc-o rP reventative M easures and C ontrolsPerson responsible to Ensure Pr
17、eventative M easures and C ontrols are in PlaceresponsiblePerson ' Signatureon Completion Date Eliminate risk C ontrol at source PUT/F ollowprocedure Provide ppeI njury , health ,Process ,M aterial and /orEnvironment1搬運(yùn)螺栓Transporting anchor bolt不夠小心Not be carefulC32搬運(yùn)螺栓支架時(shí)小心,不要砸到腳Be careful to a
18、void to hurt the feetKong QingyiDEC-21-2012/DEC-30-20142安裝螺栓支架Erecting the anchor boltrock不按程序施工Out of conductC32按照程序,不能盲目施工Construct according to the procedureKong QingyiDEC-21-2012/DEC-30-20143使用機(jī)械Using the machine漏電Electric leakageC24使用機(jī)械前由電工檢查電焊機(jī)是否漏電The welding machine must be checked byelectric
19、ian whether there is leakage beforeusing the machineKong QingyiDEC-21-2012/DEC-30-20144電焊Welding未佩戴防護(hù)眼鏡Not wearing the protectgoggleC32正確佩戴防護(hù)眼鏡Wearing glasses properly at siteKong QingyiDEC-21-2012/DEC-30-20145夜間施工Constructing at night沒有足夠的照明The lighting is notenoughC23夜間施工必須安排足夠的照明Must arrange enough lighting during theconstruction at nightKong QingyiDEC-21-2012/DEC-30-2014List Task with All Task Steps(W HO WILL DO WHAT , WHERE AND WHEN )Potential and Existing H azardsPg BA_=-K OFOCCGRHIZCECo NC/TT
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 石砌體臺(tái)階施工方案
- 管涵橋施工方案
- 2025年度智能家居產(chǎn)品傭金支付及智能家居服務(wù)合同
- 二零二五年度事業(yè)單位聘用合同:事業(yè)單位物業(yè)管理人員崗位服務(wù)合同
- 二零二五年度文化旅游產(chǎn)業(yè)合作終止合同
- 二零二五年度公司股東內(nèi)部關(guān)于戰(zhàn)略合作的框架協(xié)議
- 2025年度服裝廠員工保密與競(jìng)業(yè)禁止合同
- 2025年度洗浴場(chǎng)所員工激勵(lì)機(jī)制與雇傭協(xié)議
- 二零二五年度物聯(lián)網(wǎng)設(shè)備技術(shù)顧問服務(wù)協(xié)議
- 二零二五年度耕作地清理與農(nóng)業(yè)標(biāo)準(zhǔn)化生產(chǎn)合同
- GB/T 2572-2005纖維增強(qiáng)塑料平均線膨脹系數(shù)試驗(yàn)方法
- 2023年江蘇省中學(xué)生生物奧林匹克競(jìng)賽試題及答案
- 領(lǐng)導(dǎo)干部應(yīng)對(duì)新媒體時(shí)代
- 維修質(zhì)量檢驗(yàn)制度
- 食管支架植入術(shù)后護(hù)理課件
- 品質(zhì)控制計(jì)劃(QC工程圖)
- 海外派遣人員管理辦法
- 混凝土灌注樁質(zhì)量平行檢查記錄(鋼筋籠)
- 汽車營銷學(xué)(全套課件)
- 現(xiàn)澆墩臺(tái)身軸線偏位、全高豎直度檢測(cè)記錄表
- 激光共聚焦顯微鏡校準(zhǔn)規(guī)范編制說明
評(píng)論
0/150
提交評(píng)論