下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、Page 11 of 24Index1.2.3.4.5.6.7.8.9.P age No.224667891114Attending Surveyor Handling/Re port P rocedure 現(xiàn)場檢驗員操作和報告規(guī)程Scope范圍Draft Survey水尺計重Weighing or random/check Weighing衡重和隨機 /抽檢重量 Tally理貨Sup ervisi on of container uni oad ing 集裝箱的監(jiān)卸Sup ervisi on of the vessel discharg ing船舶的監(jiān)卸Sup ervisi on of co
2、ntainer stuffi ng 集裝箱的監(jiān)裝Sup ervisi on of the vessel load ing船舶的監(jiān)裝 Manual samp li ng 人工取樣10. Sample prep aration制樣Attached docume nt 附相關(guān)表格Moisture Determi nati on Record.測量水份計算表Outturn weight.按每批加權(quán)平均計算表ISO sta ndard Scoo p. ISC標準取制樣鏟尺寸In ternatio nal Sieve.國際標準篩網(wǎng)對照表Calculatio n of Prop ortio n.明金屬比例計
3、算表Melt ing of Metallic Material Record.金屬熔錠重量記錄1.2.3.4.5.6.P age No.323334353738SGS1. Sco pe范圍This P rocedure sp ecifies how to report to the han dli ng office whe n atte nding surveyors are p erform ing the insp ecti on at the locati on of the insp ecti on. The main job is in clud ing daily report
4、and Final Insp ecti on Report after compi etio n of the inspection.這個規(guī)程是現(xiàn)場檢驗員在現(xiàn)場如何操作和報告給辦公室,主要工作是包括匯報每天的工作進展和檢驗完畢后遞交最終檢驗報告.The insp ectors should carefully read the work in struct ion and know insp ecti on scope in details before to p erform the inspection.在檢驗工作之前,檢驗員必須認真,仔細閱讀工作指令單上的具體內(nèi)容和明確知道檢 驗工作的內(nèi)
5、容.Attending surveyor should prepare all related the equipments and documents in accorda nee with work in structio n.檢驗員必須按工作指令單的內(nèi)容準備相關(guān)工具和資料.During insp ecti on, atte nding surveyors should report irregular situati on if have at the locati on of the inspection to han dli ng office (ha ndli ng T/C for
6、 this file, sect ion head or line man ger) on the time.檢驗過程中,現(xiàn)場檢驗員如發(fā)現(xiàn)一切異常情況必須在現(xiàn)場第一時間報告辦公室具體 負責(zé)的協(xié)調(diào)員,主管或操作經(jīng)理.Daily report should be sent han dli ng office before noon time of the work ing day or phone call to report in details if atte nding surveyors have no eno ugh times to prepare whe n inspection i
7、s started.現(xiàn)場檢驗員每天中午前報告工作進展,如沒時間寫報告可以電話通知.Final inspection report should be prep ared by atte nding surveyor with in 24 hours after comp leti on of the inspection and sent to han dli ng office on time in clud ing p hotos.最終檢驗報告和現(xiàn)場照片必須在檢驗工作完成后24小時交辦公室.2. Draft Survey 水尺計重The total discharged or loaded
8、 qua ntity should be determ ined by in itial and final draft survey in accorda nee with the vessel dis pl aceme nt in atte ndance of the SGS surveyor, local CIQ/CCIC surveyor, vessel chief officer and other releva nt p arties.SGS檢驗員,本地商檢局/商檢公司,船舶大副或其他檢驗機構(gòu)對根據(jù)船舶輕,重排水量 計算出裝,卸貨物的重量.The survey must be co
9、n ducted meticulously, tak ing into acco unt all the p revail ingcircumstances. The draft survey consist of the“ initial” and“ final ” surveys, whicby measurement, calculation of the vessel ' s displacement before and after loading or discharg ing. The differe nee betwee n these two dis placeme
10、nts is the weight of cargo discharged/loaded.現(xiàn)場檢驗員根據(jù)現(xiàn)場情況,必須一絲不茍對船舶的初始和最終船舶狀態(tài)進行觀察,測量和計算得出裝卸貨的重量.2.1 Equipment used for draft survey水尺計重通常使用的工具:- A certified draft survey hydrometer.檢測合格的密度計.Calibrated sounding tape. 檢測合格的量水尺.Water finding p aste. 量水膏.A po werful hand torch or flash light for draft re
11、adi ng at ni ght time if p ossible. 可能的話備照明燈或手電以備夜間用.Calculator / compu ter. 計算器或計算機.2.2 In initial draft survey在做初水尺注意事項:-Ide ntify the vessel and confirm the cargo qua ntity of Bill of Lad ing.與船方確認裝船數(shù)量和卸貨提單重量.Obta in the vessel con sta nt at load ing port or p revious voyage from vessel chief off
12、icer and report to the handing office on time if it is any discre pancy whe n you found.與船方了解裝港或前幾個航次船舶常數(shù).如與初尺結(jié)果差異很大應(yīng)立即報告辦公室.Obtain the copy of the ship' s particular, cargo stowage plan, bilgfeawatecord ofvoyage. Propo sed discharg in g/load ing seque nee and other required docume nts if any. 須
13、船方復(fù)印船舶規(guī)范,積載/配載圖,本航次污水倉記錄,裝/卸貨次序和其他相關(guān)文件.Iden tify the p ositi on and n ame of all deductible liquid tanks from chief officer. 要求船方大付提供所有壓載水艙/淡水艙名字和位置.Iden tify the dis placeme nt table, ballast water sounding table of the vessel and con firm that it is with in the p eriod of validity.確認船舶排水量表,壓載水艙和談水
14、艙表是否有效.Copy, record and photo the main data of displacement table at one meter intervals if p ossible.可能的話復(fù)印或拍照船舶排水量表上平均吃水上下一米的主要數(shù)據(jù).Others if any如有其他注意事項.2.3 Conduct draft survey水尺計重過程:SGSRead the draft markat six (6) side of vessel' s in attendance of SGS surveyor, chief officerLocal CIQ/CCIC s
15、urveyor and other releva nt p arties if any. Record the draft read ing figures.SGS檢驗員,船方大付,本地商檢局/商檢公司或有關(guān)檢驗機構(gòu)觀察船舶六面吃水并 記錄.Sounding of all the ballast tanks and fresh water tanks using a calibrated sounding tape. Record the orig inal figure in deductible weights.用檢測合格的量水尺對所有壓載水艙,淡水艙測深.記錄原始的扣除重量.Collec
16、t a rep rese ntative sea water sample which was from half dee p of the quarter mean draft to record the den sity using a calibrated hydrometer.提取位于一半平均吃水,具代表水樣,用檢測合格的密度計測量密度.As a gen eral rule, the qua ntity of fuel oil, diesel and lubricati ng oil is to be pro vided by chief engin eer of vessel wit
17、hout further verificati on.通常用船方輪機長提供的輕,重燃油數(shù)量來計算.Calculatio n is based on the pro vided hydrostatic tables. 用船方提供的排水量表進行計算.Release the draft survey report to the vessel for their con firmati on after final draft survey. 水尺計重結(jié)束后出具水尺報告交于船方確認.Report to the han dli ng office in cludi ng the draft survey
18、 report, etc. 報告給辦公室包括水尺報告等資料.Others if any如有其他注意事項.Note: Sea con diti on of the draft readi ng in in itial and final should be well and no rmal less tha n 30 cm on the water surface.注意:初/末看水吃時,通常水面波動應(yīng)小于30厘米.3. Weighing or random/check Weighing衡重和隨機 /抽檢重量.Used weigh-bridge or scale for weigh ing sho
19、uld be calibrated withi n the p eriod of validity. Copy or to take the p hotos of the calibrati on certificate of the weigh-bridge or scale.所用衡重地磅和秤必須檢測合格并在有效期內(nèi).復(fù)印或?qū)z測合格證拍照.Before using, checked the weigh-bridge or scale working condition (use standard test weights if available)可能的話,衡重前用標準砝碼對磅稱進行校驗.
20、Adjust the weigh-bridge or scale in zero and the n make sure itself is in level con diti on, clea n.衡重用磅秤須校正零位使之處于良好工作狀態(tài),清潔干凈.Record the type, brand and p roducer of the weigh-bridge or scale. 記錄所用衡重磅秤的型號,規(guī)格和生產(chǎn)廠家.For trucks/railway wago ns weigh ing should be weighed across same time, for gross and
21、tare. Record all weight figures, trucks/railway wag ons nu mber and times.卡車和火車皮衡重時,須計錄輕/重車,衡重時間,重量結(jié)果和車號.Railway wago ns should n ot be weighed on the trot (while movin g). 火車皮衡重時須出靜態(tài)結(jié)果.It is recomme nded that the driver should be out of the motor cab in on each weigh ing op erati on.每次卡車衡重時,司機須離開駕駛
22、室.For jumbo bags weigh ing, con sideri ng the carried material in tare weight such as handing sli ng, woode n p allet, W.P.P jumbo bag or others.噸袋衡重時,須考慮提噸袋索具的重量如吊索,木托板,噸袋和其他物品.Sup ervisi on of weighi ng whole p rocess and record all weighi ng results on weight list. 全程監(jiān)督衡重全部過程并記錄重量結(jié)果.Take the pi c
23、tures duri ng the whole p rocess, show ing: 整個過程須拍照,通常顯示:View of the weigh ing p lace which is in clud ing weighbridge or scale. 衡重磅秤的地點.Zero adjustme nt of the weigh-bridge or scale. 衡重磅秤零位的矯正.P ackage/truck of the cargo weighed on weigh-bridge or scale (show the read ing on the p icture if po ssib
24、le).可能的話照片應(yīng)顯示衡重時車載的貨物,包裝.Note: Random or check weighing only used for constant weight of the p ackage. If the weight of the package is more or less the 0.2 % -0.3 %, can not be calculated the total cargo weight base on random or check weighing figure.注意:隨機/抽檢重量僅適用于定量重的包裝貨物.如包裝貨物的重量差大于0. 2% -0.3 %本身重
25、量.本方法不能用于根據(jù)隨機/抽檢重量來推算出整票貨的重量.Others if any. 如有其他注意事項.SGS4Tally理貨Tally means to acco unt the No. of the p ackage of the cargo duri ng moveme nt - Load ing and discharg ing of the vessel, stuffi ng and uni oad ing of the container, etc.理貨是指包裝貨物在貨物移動過程中(如船舶的裝/卸和集裝箱的裝/卸)點數(shù).Recorded the No. of the p acka
26、ge per shift ing per cargo holds for the vessel, container No., size, type for container stuffi ng or uni oad ing.應(yīng)記錄船舶的裝/卸貨物過程中每艙口,每工班的件數(shù).集裝箱裝/卸應(yīng)記錄箱號,尺寸 和箱型.Copy or take the p hotos for COSTACO certificate, tally rep ort, daily sheets per shifti ng on the time if po ssible duri ng vessel load ing a
27、nd dischargi ng.復(fù)印或?qū)碡涀C明,理貨報告拍照.在船舶的裝/卸貨物過程中及時拿到理貨日報表并 記錄.Others if any. 如有其他事項.5 Supervision of container unloadin集裝箱的監(jiān)卸Before container opening, take the pi ctures for full sealed container, check the container con diti on, record the container No., size, type and seal No.開箱前,須對加封集裝箱拍照,檢查集裝箱外觀狀況,記
28、錄箱號,尺寸和封號.Take the p hotos whe n opened the container door before uni oad ing. 開箱后,卸貨前須對集裝箱拍照.Acco unt the No. of the p ackage of the cargo duri ng container uni oadi ng and take the p ictures in half discharged container.卸貨中清點卸貨包數(shù)并對卸完半箱貨集裝箱拍照.Take the p hotos after compi eti on of the dischargi ng
29、in empty container, also closed one right side door which was in clud ing container No.卸貨完后對空箱拍照并對關(guān)上右門(顯示箱號的門)拍照.Record the No. of the p ackage and take the p hotos for the damaged the cargo in container if any.記錄卸貨過程中如有殘損貨物,并對殘損貨物在箱內(nèi)的情況拍照.After container unioading, all cargo should be inspected. Ou
30、r surveyor should check p ack ing, marking, cargo con diti on (Heat / Batch / Lot / P roduct ion No.), Logo etc, also take the p hotos for the cargo.貨物卸完后,對貨物進行檢驗/檢查/記錄-包括貨物的包裝,嘜頭,貨物狀況(爐號,批號 和生產(chǎn)編號),標志等.Others if any. 如有其他注意事項.6 Supervision of the vessel dischargii船舶的監(jiān)卸6.1 Vessel time Log記錄船舶在港時間:- V
31、essel arrive anchorage船舶抵錨地時間.-Pilot on board ( P.O.B)引水員上船時間.-First line ashore第一根纜繩上岸時間.- All fast and secured the Pier No靠妥碼頭泊位時間.-Clean Custom邊防/檢驗檢疫通過時間.-Initial draft survey if any 做初水尺時間.-Open hatches開艙蓋時間.-Commenee discharging開始卸貨時間.- Weighing commeneed if any開始衡重時間.-CompIeted discharging卸完貨
32、時間.- Weighing completed if any 衡重完畢時間.- Final draft survey if any 做末水尺時間.- Estimated time of departure (ETD) or sailing time預(yù)計離港 /開航時間.- Record weather con diti on duri ng whole discharg ing op erati on p rior記錄整個卸貨過程的 天氣現(xiàn)象.- Others if any如有其他注意事項.6.2 Copy of related documents from the vess從船方復(fù)印相關(guān)資料
33、:- Copy of the vessel p articular船& 舶規(guī)范-Co py of the Cargo plan 積載圖-Copy of manifest or Bill of lading if any 艙(關(guān))單和提單- Copy of the tally sheet for the package material only if any對包裝貨的理貨資料 .-Co py of the Notice of Read in ess if any (N.O.R裝卸就緒通知書.-Copy of the Stateme nt of Fact (S.O.F船 舶在港事實記錄-
34、Others if any如有其他注意事項.6.3 Discharging op eration卸貨過程:- Number of the cargo holds to store the material. 幾個貨艙堆積所卸的貨.The cargo stowed con diti on before dischargi ng and cargo con diti on duri ng discharg ing. 卸貨前貨物的堆積狀況和卸貨過程中的貨物狀況.If the cargo is gone to be directly discharged to the opening area at
35、the p ier, the quayside should be see n to be prop erly dry and clea n without any foreig n matter and residue / remnants of p revious cargoes.如貨物直接卸在船邊碼頭上,碼頭邊場地須干燥,清潔,無雜物或以前堆放的殘留貨 物.Method of discharg ing -how to discharge the material - manipu lati on. 卸貨方法,怎樣卸貨和整個卸貨過程.Pay more atte ntio n sp illa
36、ge material and rema ined cargo on board in cargo holds or on the deck.特別注意灑漏貨物以及遺漏在船艙和甲板的貨物.The empty cargo holds inspection after comp leti on of discharg ing. 卸完貨的艙須檢查.Others if any如有其他注意事項.6.4 The p hotos should be taken to reflect all p rocedures of the ins pection as well as cargo condition, d
37、ischarging op eration and material delivery, etc. Normally it includes: 須拍反映整個檢驗過程,卸貨過程和貨物裝運過程的照片,通常包括:- Vessel at pier condition 船靠碼頭情形.Cargo stowed condition in cargo holds before commeneed discharging 卸貨前貨物堆放 艙內(nèi)情形.Cargo condition during discharging貨物在卸過程中的情形 .Cargo stowage con diti on at opening
38、area yard after comp letio n of discharg ing. 卸貨后貨物的堆放情形.Seal No. of the package if any注意包裝貨有無圭寸號 .Marks on the package and packing conditio包裝貨嘜頭,包裝情況.Cargo handling procedure (discharging operation, cargo delivery, packing/unpacking op erati on, etc)裝/卸貨物的過程(卸貨過程,貨物的轉(zhuǎn)運,灌包和拆包).Weather con diti on du
39、ri ng whole discharg ing op eration記錄整個卸貨過程的天氣現(xiàn)象 .Other if any如有其他注意事項.7 Supervision of container stuffin集裝箱的監(jiān)裝Before container stuffing, all loaded cargo should be inspected. Our surveyor should check p ack ing, marking, cargo con diti on (Heat / Batch / Lot / P roduct ion No.), Logo etc, also take
40、 the p hotos for the cargo.SG裝箱前,對要裝貨物須檢驗.檢驗內(nèi)容包括-貨物的包裝,嘜頭,貨物狀況(爐號,批號和 生產(chǎn)編號),標志等.Before container stuffing, take the photos for empty container, check the container con diti on, record the container No., size, type and rejected any damaged container or un clear container for cargo stuffi ng.裝箱前,空箱須拍照
41、,檢驗,記錄箱號,尺寸,箱型.拒絕壞箱和不清潔/不干凈集裝箱裝 貨.Acco unt the No. of the p ackage of the cargo duri ng container stuffi ng and take the p hotos in half loaded cargo in container.裝箱過程中須清點貨物件數(shù),對裝半箱貨物拍照.Record the No. of the p ackage which was loaded into the containers. 記錄裝入箱內(nèi)的貨物件數(shù).Take the p hotos after compi eti o
42、n of stuffi ng in full container, also closed one right side door which was in clud ing container No.裝箱完后,對整個箱拍照,包括關(guān)上右門(顯示箱號的門)拍照.Take the p hotos for the damaged the cargo, rejected damaged cargo to stuff in to the container and report to han dli ng office on time if any.對殘損貨物要拍照,拒絕殘損貨物裝入箱內(nèi)并及時報告辦公室
43、.Others if any如有其他注意事項.8 Supervision of the vessel loadin船舶的監(jiān)裝8.1 Vessel time Log:- Vessel arrive anchorage船舶抵錨地時間.-Pilot on board ( P.O.B)引水員上船時間.-First line ashore第一根纜繩上岸時間.-All fast and secured the Pier No.靠妥碼頭泊位時間.-Clean Custom邊防/檢驗檢疫通過時間.-Initial draft survey if any 做初水尺時間.-Open hatches開艙蓋時間.-
44、Weighing commeneed if any開始衡重時間.-Commenee loading開始裝貨時間.- Weighing completed if any 衡重完畢時間.-Completed loading裝完貨時間.- Final draft survey if any 做末水尺時間.- Estimated time of departure (ETD) or sailing time預(yù)計離港 /開航時間.- Record weather condition during whole loading operation prior 記錄整個裝貨過程的天 氣現(xiàn)象.Others if
45、 any如有其他注意事項.8.2 Copy of related documents from the vessel:- Copy of the vessel particular船&舶規(guī)范.-Copy of the Cargo plan 配載圖.- Copy of the tally sheet for the package material only if any對包裝貨的理貨資料 .- Co py of the Notice of Read in ess if any (N.O.R裝卸就緒通知書.-Copy of the Stateme nt of Fact (S.O.F船舶在
46、港事實記錄- Others if any如有其他注意事項.&3 Loading op eration 裝貨過程:- Number of the cargo holds will be stored the material.幾個貨艙要裝貨Empty cargo holds should be insp ected before loadi ng and record the n ame of the cargo in p revious three voyages, how to clea n and wash the cargo holds after last voyage fro
47、m vessefs chief officer.裝貨前,對所要裝貨的空貨艙要檢驗.向船方大付詢問并記錄前三航次船舶所載貨物 名稱,本航次是如何清理貨艙的.The cargo storage con diti on and cargo con diti on at the pier, warehouse before loadi ng and cargo con diti on duri ng load ing.裝船前貨物在碼頭,倉庫的堆放情況和裝船過程中的貨物狀況.Load ing op eratio n -how to load the cargo - manipu lati on. 裝貨方
48、法,怎樣裝貨和整個裝貨過程.Pay more atte nti on sp illage material duri ng loadi ng. 特別注意裝貨過程中灑漏的貨物.The loaded cargo con diti on in cargo holds after comp leti on of load ing. 裝貨完畢后貨物的在貨艙內(nèi)的堆放情況.Sep arati on, lashi ng and chock ing con diti on in cargo holds if any. 隔票,綁扎和木加固的情況.Others if any如有其他注意事項.8.4 The P ho
49、tos should be taken to reflect all p rocedures of the ins pection as well as cargo condition, loading op eration and material delivery, etc. Normally it includes: 須拍反映整個檢驗過程,裝貨過程和貨物裝運過程的照片,通常包括:Vessel at pier condition船??看a頭情形.Cargo holds condition before commeneed loading裝貨前的空艙情況.Cargo con diti on b
50、efore load ing and duri ng loadi ng裝貨前和裝貨過程中貨物狀況 .Pack in g/Marki ng con dition if any如對包裝貨的包裝和麥頭情況.Cargo storage con diti on at opening area yard or warehou貨物在堆場和倉庫堆放情況 .Cargo handling procedure (loading operation, cargo delivery, packing/unpacking op erati on, etc)貨物裝運過程(包括怎樣裝貨,貨物的裝運,灌包和拆包)Cargo s
51、towage condition in the holds貨物在船艙積載情況.Weather con diti on duri ng whole loadi ng op erati on 記錄整個裝貨過程的天氣現(xiàn)象 .Other if any如有其他注意事項.9Manual sam pling人工取樣9.1 Definition 定義 Consignment-A qua ntity of material of the same quality delivered at one time by agreeme nt betwee n the p arties concern ed. The c
52、on sig nment may con sist of one or more lots or p arts of lots.有關(guān)方按合同一次交付一定數(shù)量同等質(zhì)量的貨物,該批貨物有可能是一個批號或幾個批號.Lot-A defi ned qua ntity of material un der give n inten ti ons. A nu mber of lots can make up the whole con sig nment.按要求交付同等品質(zhì)一定數(shù)量貨物,一票貨可能有幾批次貨 物組成.Increment-A qua ntity of material obta ined by
53、 a samp li ng device at any one time from a con sig nment.用取樣工具從一票貨任何一次性取出的樣品.Sub-sam pleA qua ntity of material con sist ing of several in creme nts take n from a part of the con sig nment.從幾個取樣點取出樣品的匯總.Gross sam pleA qua ntity of con sist ing of all the in creme nts take n from a lot or all of the
54、 sub-sa mple.從每取樣點取出的樣品或每批樣的總和.Prep ared sam ple-The sample has bee n fini shed by stated p rocedures of prep arati on, by crush ing and reduc ing.SGSPage 15 of 24通過破碎和縮分制完的樣.Top sizeThis size/scree n which retai ns 5 % of the material.最大粒度-能保留5%篩上物的篩網(wǎng)尺寸.Number of the Increment - The nu mber of in c
55、reme nt to be collected from a lot/c on sig nment will be decided accord ing to the accuracy required, tak ing into acco unt the variati on in the rep rese ntative n ature of the material. 取樣點的數(shù)目.Size of the Increment- The size of each in creme nt should be large eno ugh to en sureran dom selecti on
56、 of p articles in each in creme nt.每取樣點的樣量.9.2 Sam pling during discharging/loadin在裝 / 卸貨過程中取樣-Descri pti on of the material - n ame of the cargo, top size of the material, samp li ng lot size and han dli ng con diti on.要了解貨物的情況-貨物名稱,最大粒度,取樣的批次和裝/卸貨情形.-Make the samp li ng plan, how many in creme nts
57、 and how many sam pie weight per in creme nt will be take n for the con sig nment.制定取樣計劃,樣品從多少樣點中取出,每個樣點取多少樣品.-Prep ared the available samp le sp ear, shovel and sco op which should follow the principle that inner diameter should be at least 2.3 times of the nominal top size of the samp led material, sample bags and mark pen.備妥取樣用樣釬,樣鏟.取樣工具的開口必須是貨物最大粒度的2.5 -3倍以上.-Sampling實施取樣.-Sealed the sample bags after samp li n
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 環(huán)保項目禁牧合作合同
- 塑料制品鋼架棚施工合同
- 科技研發(fā)資助公共資源交易辦法
- 都市情感電視劇編劇聘用
- 旅游景區(qū)一級建造師聘用合同
- 汽車零部件采購招投標要點
- 實驗室輻射防護規(guī)定
- 商場停車場安全管理辦法模板
- 培訓(xùn)服務(wù)續(xù)約租賃合同
- 藥品批發(fā)公司藥師聘用合同樣本
- 多旋翼無人機-法律法規(guī)
- 催乳穴位及手法課件
- 2023年新改版教科版六年級下冊科學(xué)全冊知識點 (共兩套)
- 隧道圍巖分級(表)
- 國家開放大學(xué)《液壓與氣壓傳動》形考任務(wù)1-2參考答案
- 食道超聲在心臟外科手術(shù)中的應(yīng)用課件
- 9《 復(fù)活》課件17張PPT 統(tǒng)編版高中語文選擇性必修上冊第三單元
- 血流動力學(xué)不穩(wěn)定骨盆骨折急診處理
- 新《刑法-刑罰》考試題庫大全(含詳解)
- 小學(xué)醫(yī)學(xué)知識(課堂)課件
- 客戶個人信息保護突發(fā)事件應(yīng)急預(yù)案
評論
0/150
提交評論