橋梁工程外文翻譯--新巴達(dá)洛納鐵路橋_第1頁(yè)
橋梁工程外文翻譯--新巴達(dá)洛納鐵路橋_第2頁(yè)
橋梁工程外文翻譯--新巴達(dá)洛納鐵路橋_第3頁(yè)
橋梁工程外文翻譯--新巴達(dá)洛納鐵路橋_第4頁(yè)
橋梁工程外文翻譯--新巴達(dá)洛納鐵路橋_第5頁(yè)
已閱讀5頁(yè),還剩8頁(yè)未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、The New Badalona Railway Bridge A Structure for the CitySummary The design of structures in metropolitan habitats is always a challenge due to the important number of requirements to fulfil. Design especially when it deals with railways or roads has to combine the needs of those infrastructures with

2、 the human environment, which is the case of the railway bridge in the city of Badalona. Nowadays the city area that faces the sea is occupied by contaminating industries. The council is trying to open the city to the Mediterranean Sea, demolishing unsightly and useless buildings and changing the us

3、e of the ones with architectural or technical value. Now a beach and a yachting harbour are being built. A railway line runs parallel to the coast dividing the centre of the city from the shore area. There are no funds to construct a tunnel for the railway line, consequently a bridge has to be built

4、 to increase the connection between the centre of the city and the new coast facilities. A design competition was carried out for a railway bridge, which will cross a new pedestrian area, a part of the new harbour and two streets. The contract for the bridge design was awarded to FHECOR Consulting E

5、ngineers on the basis of a preliminary design. The idea of the proposal was to combine functionality, structural rationality, aesthetics and low construction and maintenance costs. Also the client has the intention to construct the bridge as a landmark that will be the image of the new urban develop

6、ment. Keywords: Urban Bridge, Railway, Prestressed, Structural shape. 1. Introduction Badalona is a major satellite city of Barcelona on the Mediterranean coast. The nucleus of the city is cut off from the shoreline by the railway line which connects the different suburban centres of Barcelona locat

7、ed along the Mediterranean coast. The railway line is currently one of the Spanish Railway Consortiums (RENFE) most profitable passenger lines. Along the railway line industrial buildings have sprung up over the years forming a once important industrial centre but at the same time furthering the ali

8、enation of the people of Badalona from the sea. In order to try to regenerate the coast and improve its connection with the urban centre, the City of Badalona together with the Comarcal Council of Barcelona have created Marina de Badalona S.A. whose main purpose is to regenerate the urban landscape

9、by carrying out a major urban development project which includes a port for sport boats and fishing, the reconditioning of existing interesting industrial buildings for other use and the demolishing of more common warehouses and other constructions in order to make room for apartment and service bui

10、ldings. The construction of the new port or marina involves the building of a new canal which will cross the existing railway line extending into the land about 350 m. This canal will serve as parking docks for the boats. In order to create this new waterway and allow the crossing of the existing ra

11、ilway line, a new bridge is needed (see fig 1). In this paper the conception process of this bridge, which will become a symbol of the urban development is described.2. Main condition to be fulfilled by the bridge The main conditions to be fulfilled by the bridge are the following: ·The bridge

12、width must fulfil the horizontal and vertical clearance conditions of the railway line.·The depth of the deck needs to be small due to the very strict vertical clearance.·The horizontal channel clearance needs to be at least 45 meters, although it is desirable not to locate any supports wi

13、thin the canal. This last condition results in a main span of at least 72 m.·The bridge must also leave clearance for port operation roads on both sides of the canal and cross over a roundabout carrying local traffic.·Since it is a railway bridge it cannot be a very light structure. It req

14、uires appropriate stiffness and bearing capacity.·In spite of the last point, the bridge is conceived as a symbol of the urban development and therefore aesthetical conditions are of great importance. ·This last point cannot however result in a very expensive structure due to the fact that

15、 the budget is very limited and this is a major condition of the project. The cost of the structure must also bear in mind maintenance issues especially in a structure located next to the shoreline. FHECOR consulting engineers participated in a contest called by Marina de Badalona S.A. and was award

16、ed the contract of the design of the new bridge with a simple, elegant, economic and structurally efficient solution. 3. Description of the proposed solution The proposed solution is a 5 span presstressed concrete bridge with spans of 39.00, 78.00, 39.00, 30.00 and 21.00 meters. The cross section is

17、 formed by two webs of variable height (the total depth of the bridge varies from 1.90 m centre of main span and access spans - to 6.50 m over de main piers). The deck depth therefore mirrors the bending moment law (see fig. 3).The webs are connected by means of prefabricated presstressed beams. The

18、se beams form ribs through which the light can shine. This is an important feature of the bridge which is conceived to illuminate the walkways and to counteract the high bridge width to bridge height ratio. This light also offers an image for the railroad due to its discontinuity.Figure 4 shows the

19、two typical bridge cross sections (support at main piers and central span). Figure 5 shows the light effect given by the central opening.Another important feature of the bridge design is the position of the outer cantilever slabs. These slabs are used as a compression slab at the critical cross sect

20、ions. Since compressions are located at the bottom of the cross section at the supports (negative bending), and at the top of the cross section at centre span the span (positive bending) the compression slab travels along the bridge axis to be at each section where it is more efficient, following an

21、 old idea used by Nervi in the UNESCO building in Paris. This feature also produces an attractive design, providing both structural efficiency and aesthetical value to the structure. The piers, whose design is still being optimised from an aesthetical point of view are conceived as robust elements d

22、ue to the fact that given their small height they cannot be very slender and fulfil at the same time resisting conditions and provide enough space to locate the bridges pot bearings. The cross section is reduced by vertical channels which will allow the introduction of lighting under the structure a

23、s well as special designs yet to be conceived. Figure 6 shows the geometry adopted for the main piers.The bridge is anchored at abutment 1 in order to absorb the high forces resulting from train breaking, which are equivalent to 25% of the train weight. At the other abutment a joint is provided as w

24、ell as a slab supported over walls, designed to carry the railway expansion apparatus meant to allow the bridge movement without affecting the railway serviceability conditions. A large space is thereby generated at abutment 2 which could be used in the future as stock space. Figure 7 shows the main

25、 design ideas of the abutments.4. Final remarks The proposed structure for the bridging of the Canal of the future sports and fishing port of Badalona fulfils all the requirements of the project. It is a robust bridge as is necessary for the serviceability of the railway line, it is structurally sou

26、nd with a special shape derived from its structural functionality. The whole gives rise to an interesting structure which will serve as a symbol for the Port of Badalona without an unjustified high economic cost.新巴達(dá)洛納鐵路橋摘要在大城市居所里的結(jié)構(gòu)設(shè)計(jì)總是一個(gè)對(duì)于完成需求重要系數(shù)的挑戰(zhàn)。 設(shè)計(jì),特別是當(dāng)它涉及鐵路或道路中,必須與人的環(huán)境相協(xié)調(diào)的那些基礎(chǔ)設(shè)施的需要,罷達(dá)洛納的的鐵路橋

27、就是一個(gè)例子?,F(xiàn)如今臨海的城市區(qū)域被污染產(chǎn)業(yè)占領(lǐng)。城市管理委員會(huì)設(shè)法面向地中海開放城市,拆毀難看和無(wú)用的大樓或者改變對(duì)它們的建筑或技術(shù)價(jià)值的利用方式?,F(xiàn)在建起了一個(gè)沙灘和一個(gè)快艇港口。有一條鐵路線與岸區(qū)域的海岸平行,將城市的中心與海岸隔離了開來(lái)。沒有修建一個(gè)隧道式鐵路線的資金,因而必須被修筑一座橋梁以增加城市的中心和海岸新設(shè)施之間的連系。為建造一座鐵路橋,發(fā)起了一次設(shè)計(jì)競(jìng)標(biāo),該橋?qū)⒋┻^城市的一個(gè)新的步行區(qū)域、新的港口的部分和二條街道。 橋梁設(shè)計(jì)的合同被交由FHECOR咨詢工程師擬定一個(gè)初步設(shè)計(jì)。提案的理念是將功能、結(jié)構(gòu)合理性、美學(xué)和低建筑、低維修費(fèi)用相結(jié)合。并且也有意圖修建一座成為將來(lái)新的都市

28、發(fā)展標(biāo)志的橋梁。關(guān)鍵詞: 都市橋梁,鐵路,預(yù)應(yīng)力,結(jié)構(gòu)形狀。1. 簡(jiǎn)介巴達(dá)洛納是巴塞羅那靠地中海海岸附近重要的衛(wèi)星城市。城市的中堅(jiān)力量與海岸之間的聯(lián)系被連接巴塞羅那郊區(qū)的鐵路線路所切斷。該鐵路線是西班牙聯(lián)合鐵路集團(tuán)收益頗豐的客運(yùn)線路之一。多年來(lái),沿著鐵路線工廠廠房出現(xiàn)了形成了一個(gè)重要工業(yè)中心,但是同時(shí)卻也讓巴達(dá)洛納的人們遠(yuǎn)離大海。為了設(shè)法重建海岸和增強(qiáng)其與市中心之間的聯(lián)系,巴達(dá)洛納與巴塞羅那發(fā)展委員會(huì)合作設(shè)法改進(jìn)它的與市區(qū)的連接。巴達(dá)洛納市發(fā)起了一個(gè)主要目的在于重建都市風(fēng)景的一個(gè)都市發(fā)展項(xiàng)目,其中包括為體育船只和漁船修建停船港。重造其他的現(xiàn)有的有價(jià)值的工廠廠房做為其他用途和拆毀倉(cāng)庫(kù)和的小游艇船

29、塢等建筑,是為了給公寓和服務(wù)樓騰出空間。新的口岸或小游艇船塢的建筑包含一條運(yùn)河,它將跨過一條大約350 m.的鐵路線。這條運(yùn)河可作為小船的停船塢。 為了建造這條新的水路和穿越現(xiàn)有的鐵路線,有必要修建一座新的橋梁 (參見圖1)。 在本文中,這座橋梁的構(gòu)想過程將被描述為都市發(fā)展的標(biāo)志。2.橋梁建造需滿足的條件 該橋主要須滿足的條件有以下內(nèi)容:·橋梁寬度必須符合鐵路線的橫向和縱向有關(guān)條件。·橋梁建筑高度,需要非常嚴(yán)格的要求。·橫向通道寬度,必須至少有45米,雖然這取的是運(yùn)河無(wú)任何支持的情況。最后的結(jié)論是,一個(gè)主跨至少72米。·橋梁,也必須在道路兩邊留出地方讓運(yùn)河的港口運(yùn)作,還要留出一個(gè)回旋距離給當(dāng)?shù)氐慕煌ā?#183;既然它是一座鐵路橋,它不可能是一個(gè)很輕的結(jié)構(gòu)。它需要有適當(dāng)?shù)膭偠群统休d能力。 ·最后一點(diǎn),大橋被看作是城市發(fā)展的一個(gè)象征,因此,美

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論