




版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、ZeeWeed 1500 壓力式超濾壓力式超濾 ZW1500Module DimensionsHeight1920 mm (75”)Diameter180 mm (7”)Module WeightMax. Shipping Weight22 kg (50 lb)Lifting Weight22 34 kg (50 75 lb)Membrane PropertiesNominal Membrane Surface Area550 ft2 (51.1 m2)MaterialPVDFNominal Pore Size0.02 micronSurface PropertiesNon-Ionic &am
2、p; HydrophilicFiber Diameter0.9 mm OD / 0.47 mm IDFlow PathOutside-InOperating SpecificationsTMP Range0 to 275 kPa (0 to 40 psi)Max. Operating Temperature40C (104F)Operating pH Range5.0 10.0Cleaning SpecificationsMax. Cleaning Temperature40C (104F)Cleaning pH Range2.0 11.0Max. Cl2 Concentration1,000
3、 ppmModule Design- outside-in permeation- vertical orientation- PVDF, unsupported fiber- fiber ID/OD: 0.47/0.9 mm- diameter: 180 mm (7 in.)- surface area: 550 sqft- housing material: PVC/PPO19201920 mm (76 in.)Rack InfoRack Dimensions12 Module24 ModuleLength1,073 mm (42.25”)2,146 mm (84.5”)Width1,16
4、8 mm (46”)Height2,350 mm (92.5”)Tie-Points and Pipe MaterialPermeate Header8” Sch 80 PVC pipeFeed Header8” Sch 80 PVC pipeWaste Header8” Sch 80 PVC pipeAir Header6” Sch 10 SS pipeKey Differentiators Low fouling membrane chemistryo Leveraging 15+ years of membrane researcho Stable chemistry will not
5、need aggressive hot water cleans to maintain performance High Solids Toleranceo Ability to handle turbidity spikes up to 150 NTU and coagulant dose up to 40 mg/L Less chemical usageo Lower OD fiber allows higher fiber packing density per shell volume o 25 % less chemical volume in shell for same sur
6、face area Shorter module requires lower ceiling height On rack fiber repairs Simplified rack designZeeWeed PFDInlet waterfeed pumpNaOHSodiumOptional for NeutralizationPermeate to product water tankNaOClCitric AcidBisulphite500 micron Strainerbackpulse pump and tankZW1500 Membrane Rackair scour blowe
7、r CIP pump and tankWaste waterProcess CapabilitiesOperating ModesPermeationDead-end filtrationTMP up to 40 psiMaintenance Clean (CEB,EFM)DailyHeating optionalRecirculationRecovery Clean (CIP)MonthlyHeating optionalLonger durationRecirculation/relaxation intervalsTypical flux range35 80 gfd (applicat
8、ion-specific)AirZW1500 Flux Selection GuideWater QualityRecoveryFlux at 20 C, gfdDirect FiltrationAvg turbidity 0 25 NTU, 6 mg/L TOC95%50 Avg. turbidity 75 NTU93%40Enhanced Coagulation2.5 mg/L coagulant (as Al3+), 15 NTU turbidity, 6 mg/L TOC 95%455 mg/L coagulant (as Al3+), 75 NTU turbidity, 10 mg/
9、L TOC92%25Seawater2.5 mg/L coagulant (as Al3+), 25 NTU turbidity95%405 mg/L coagulant (as Al3+), 75 NTU turbidity, 93%30Oxidation35Secondary Effluent0 to 10 mg/L TSS or BOD92%3510 to 25 mg/L TSS or BOD92%3025 to 50 mg/L TSS or BOD92%25Backwash Process Sequence and DurationProcess StepDescriptionDura
10、tion, SecTotal elapsed timeFeed pump ramp-downFeed pump ramp-down and valve rotation1010Pre-aerationFor coagulation applications(20)10 (30)Backpulse pump ramp-upAeration and ramp-up backpulse pump 515 (35)BackpulseAeration and backpulse6075 (95)Backpulse pump ramp- downBackpulse pump ramp- down and
11、valve rotation + aeration off1085 (105)Feed pump ramp-up (feed flush)Feed pump ramp-up for feed flush590 (110)Feed flushFeed flush30120 (140)ProductionValve rotation for productionStep 2Backwash SequenceStep 1: Backpulse ( at 3.4 m3/hr per module) with aeration (at 8.5 am3/hr per module) for 60 seco
12、ndsStep 2: Feed-flush (3.4 m3/hr per module) for 30 secondsBackpulseFeed-flushAirStep 1RejectMaintenance Clean Sequence and DurationProcess StepDescriptionDuration, minTotal elapsed timeFill CIP tank with chemical solution CIP tank filled with permeate, (optional heating), Chemicals mixedStop system
13、00Drain rackDrain rack using feed pump22Transfer CIP ContentPump chemical from CIP to the modules35Recirculate Recirculate CIP solution1520Drain CIP SolutionDrain CIP solution to CIP tank222Chemical FlushFill rack with feed and permeate to neutralization tank527Start systemRecovery Clean Sequence an
14、d DurationProcess StepDescriptionDuration, minTotal elapsed time, minFill CIP tank with chemical solution CIP tank filled with permeate, heated, Chemicals mixed(240 )Stop system00Drain rackDrain rack using feed pump22Transfer CIP ContentPump chemical from CIP to the modules35Recirculate and SoakReci
15、rculate CIP solution for 5 min and soak for 25 min; repeat this cycle 10 times300305Drain CIP SolutionDrain CIP solution to CIP/Neutralizataion tank2307Chemical FlushFill rack and rinse to CIP/neutralization tank5312Start systemCleaning SequenceStep 1: Fill CIP tank with permeate, heat, add chemical and mixStep 2: Drain modules/rackStep 3: Fill with cleaning solutionStep 4: Recirculate 15 minutes (MC)/15 minutes every hour for 5 hours (RC)Step 5: Drain to neutralizati
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 【正版授權】 ISO/IEC 15944-12:2025 EN Information technology - Business operational view - Part 12: Privacy protection requirements (PPR) on information life cycle management (ILCM) and
- 2025年6月下旬熱點新聞素材解讀+適用話題+寫作運用及事例
- 臥室紡織品市場政策分析考核試卷
- 區(qū)域會展產業(yè)區(qū)域合作政策優(yōu)化考核試卷
- 戰(zhàn)略合作伙伴關系評估考核試卷
- 干擾源定位技術國際合作考核試卷
- 醫(yī)藥行業(yè)市場細分與目標客戶定位策略分析考核試卷
- 2025年中國N-乙基-2-吡咯烷酮數(shù)據(jù)監(jiān)測報告
- 2025年中國CCFL遞變器數(shù)據(jù)監(jiān)測報告
- 2025年中國3,5-雙三氟甲基苯甲醛數(shù)據(jù)監(jiān)測研究報告
- 2025年 武漢市漢陽區(qū)社區(qū)干事崗位招聘考試筆試試卷附答案
- 2025年 云南省危險化學品經營單位安全管理人員考試練習題附答案
- 美發(fā)師五級試題及答案
- Q-GDW10250-2025 輸變電工程建設安全文明施工規(guī)程
- 2024-2025學年四年級(下)期末數(shù)學試卷及答案西師大版2
- 2025-2030年中國釹鐵硼永磁材料行業(yè)市場現(xiàn)狀供需分析及投資評估規(guī)劃分析研究報告
- 2025-2030年中國高導磁芯行業(yè)深度研究分析報告
- 宣城市宣州區(qū)“政聘企培”人才引進筆試真題2024
- 遠程胎心監(jiān)護數(shù)據(jù)解讀
- 2025年全國法醫(yī)專項技術考試試題及答案
- 2025年寧夏銀川市中考歷史三模試卷(含答案)
評論
0/150
提交評論