1、四、架橋機(jī)拆除施工 Dismantle of Beam Setter五、HES管理措施 HES Management Measures六、環(huán)境保護(hù)措施 Environment Protection Measure七、拆除工作安全技術(shù)保證措施 Safety Measure5、梁場(chǎng)施工現(xiàn)場(chǎng)、周邊環(huán)境、設(shè)備資源情況;5. Construction site, surrounding environment and equipment allocation. 6、起重設(shè)備安裝工程施工驗(yàn)收規(guī)范、建筑機(jī)械使用安全技術(shù)規(guī)程。6. Construction Acceptance Code of Lifting
2、 Equipment Installation; Technical Regulation of Safe Utilization of Constructional Machinery 3、白廟大橋架橋機(jī)現(xiàn)已完成主臂的拼裝,但由于整體拼裝完成后不能滿足CDB對(duì)機(jī)械設(shè)備的驗(yàn)收要求,要求對(duì)已經(jīng)架設(shè)的架橋機(jī)全部拆除,并清運(yùn)出場(chǎng)。4、已拼裝的架橋機(jī)由貝雷梁片拼裝而成,總長(zhǎng)約36米,高為3米,寬為3.2米。Assembled beam setter is consisting of multiple pieces of bailey beam. It is approximately 36m in t
3、otal, 3m high and 3.2m wide. 1、白廟大橋架橋機(jī)拆除時(shí)間計(jì)劃在:2011年10月6日2011年10月15日,總計(jì)工期15天,全部拆除后統(tǒng)一清運(yùn)出場(chǎng)。Dismantle time of Baimiao beam setter is planned from 6st Oct 2011 to 15th Oct 2011, namely 15 days in total. All components will be removed from site after such beam setter is fully dismantled. 2、在拆除施工作業(yè)前一天準(zhǔn)備好所需
4、的鋼絲繩、卸扣、安全帶、扳手等工具,并逐一檢查是否合格,如有任何問題應(yīng)立即更換方能使用。Tools such as steel sling, shackle, body harness, spanner and etc shall be prepared and inspected one day prior to dismantling. In case of any problems, tool will be replaced immediately. 3、人員準(zhǔn)備 Manpower Allocation 四、架橋機(jī)拆除施工 Beam Setter Dismantle 3、 對(duì)所有工人進(jìn)
5、行安全培訓(xùn),作業(yè)前必須進(jìn)行安全技術(shù)交底,做好JSA分析,并確保讓每個(gè)作業(yè)人員都了解可能發(fā)生的風(fēng)險(xiǎn)以及風(fēng)險(xiǎn)應(yīng)對(duì)措施。Conduct safety orientation of training to all workers and safety elaboration and JSA shall be conducted prior to work in order to make every person comprehending possible risk and its mitigation measure. 4高處作業(yè)應(yīng)有合格的梯子提供人員安全上下,拆除忱木、軌道時(shí)下方嚴(yán)禁立人。Qua
6、lified ladder should be prepared for workers at height to go up and down safely. When workers are working on demolishing the tracks and timber on top of the beams, no one is allowed to stand in such area under beams. 5、需要在貝雷梁上設(shè)置生命線,因?yàn)楣と艘礁呖兆鳂I(yè)拆除天車軌道等工作。Set up life-line on bailey beams for workers who
7、 are going to dismantle crown block track at height. 6、在拆除連接螺栓和卡扣時(shí)應(yīng)先保證吊車就位并已經(jīng)提住貝雷梁以免發(fā)生側(cè)翻造成事故。In consideration that the sequence of the demolishment, the slings should be fixed firmly and the cranes should be positioned properly and also be functioning to hold the beams before removing the connecting
8、 bolts and shackles in order to avoid the bailey beams tip over. 7、前支腿拆除時(shí)具有一定危險(xiǎn)性,應(yīng)有專人進(jìn)行技術(shù)指導(dǎo)并專人監(jiān)護(hù)下進(jìn)行,安全帶始終確保100%掛鉤并提供合理的掛點(diǎn)。Since it is more dangerous to remove the front legs of the beam setter, the dismantling work shall be conducted under technical guidance and supervision and monitor of specific p
9、ersonnel. The hardness must be 100% tied off all the time and tying point shall be reasonable. 8、材料外運(yùn)車輛必須經(jīng)驗(yàn)收合格后進(jìn)入,嚴(yán)禁超載、超高,材料捆綁時(shí)嚴(yán)禁有人站立在材料上進(jìn)行捆綁工作。 Transporter for transferring dismantled material shall be inspected prior to mobilization. Overload and over-stack is prohibited. No one is allowed to stan
10、d rigged material to conduct any rigging work. 作業(yè)人員應(yīng)正確的使用安全帶,確保安全生產(chǎn),高空作業(yè)時(shí),必須拴好安全帶。起重吊裝指揮信號(hào)應(yīng)由專門人員指揮,且應(yīng)明確、準(zhǔn)確、哨音應(yīng)響亮。Lifting shall be under signal of specific personnel and whistle signal shall be clear, accurate and loud. 5、嚴(yán)禁超負(fù)荷起吊,作業(yè)中防吊車傾覆,危險(xiǎn)點(diǎn)應(yīng)設(shè)專人監(jiān)護(hù)。Overloaded lifting is prohibited. To prevent tip-over of crane, some danger spots shall be monitored by specific person. 6、所有拆除操作人員須配齊證件
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024年山西開放大學(xué)輔導(dǎo)員考試真題
- 軟件設(shè)計(jì)師試題及答案思維導(dǎo)圖
- 2024年天津市第一中心醫(yī)院招聘筆試真題
- 2024年湖北省科學(xué)技術(shù)廳下屬事業(yè)單位真題
- 2025年軟件測(cè)試技能提升指南試題及答案
- 促進(jìn)班級(jí)內(nèi)互助學(xué)習(xí)的機(jī)制計(jì)劃
- 2025屆河南省南陽市桐柏縣七年級(jí)數(shù)學(xué)第二學(xué)期期末考試試題含解析
- 數(shù)據(jù)分析中的統(tǒng)計(jì)方法與應(yīng)用試題及答案
- 工作計(jì)劃對(duì)員工發(fā)展的影響
- 企業(yè)戰(zhàn)略與合法合規(guī)性試題及答案
- 網(wǎng)課智慧樹知道《人工智能引論(浙江大學(xué))》章節(jié)測(cè)試答案
- 運(yùn)用系統(tǒng)觀察法評(píng)價(jià)有效體育教學(xué)的研究
- 2024年江蘇省蘇州市高新區(qū)中考二模物理試題
- 中考物理壓強(qiáng)與浮力壓軸題20道(解析版)
- 穿脫隔離衣的流程及注意事項(xiàng)
- (新版)高級(jí)經(jīng)濟(jì)師《高級(jí)經(jīng)濟(jì)實(shí)務(wù)》(工商管理)考試題庫(含答案)
- 八年級(jí)歷史下冊(cè)期末測(cè)試題及答案
- 企業(yè)反舞弊知識(shí)講座
- 中國(guó)新聞傳播史課件
- 閩教版2023版3-6年級(jí)全8冊(cè)英語單詞表
- 全國(guó)各省(直轄市、自治區(qū))市(自治州、地區(qū))縣(縣級(jí)市)區(qū)名稱一覽表
評(píng)論
0/150
提交評(píng)論