1、監(jiān)理周報(bào)Jianli Weekly Report工程名稱:焊接器材(威海)有限公司廠房工程 日期(Date:):2007.08、07 Project name : EV project 編號(hào)(Serial Number):06 本周概況General Situation of This Week1, beam and slab formwork installation of office building level 3 was done. Steel bar fabrication and installation of beam was done as well.1:辦公樓三層樓面梁、板
2、模板支設(shè),梁鋼筋制作、安裝;2, east side retaining wall construction was in progress.2:東面擋土墻毛石墻施工;3, backfill of warehouse foundation was done. 3:廠房基礎(chǔ)內(nèi)回填土方;4, wall and slab concrete pouring was done of water tank.4:消防水池墻板混凝土施工5, wall and slab steel bar installation and formwork installation of water tank were don
3、e.5:消防游水池墻板鋼筋安裝、模板安裝;本周進(jìn)度情況Progress of This Week1,column steel bar installation of office building level 3 was in progress. And formwork installation was in progress.1:辦公樓進(jìn)入三層柱鋼筋安裝階段。模板支架搭設(shè)階段;2, short column of warehouse foundation was almost done. Foundation bolts installation was almost done.2:廠房基
4、礎(chǔ)短基本結(jié)束,鋼構(gòu)地腳螺栓安裝基本結(jié)束;3, east side retaining wall construction was in progress.3:東側(cè)擋土墻正在施工中,4, wall and slab concrete pouring of water tank was done.4:消防水池墻板混凝土結(jié)束;5, backfill of warehouse foundation was done.5:主廠房基礎(chǔ)已回填土方;施工質(zhì)量情況ConstructionQuality Situation 1, mortar of retaining did not meet requireme
5、nt and WJ was asked to redo.1:擋土墻施工質(zhì)量砂漿灌縫不夠密實(shí),;已要求總包加強(qiáng)管理, 對(duì)不合格的地方要作返工處理;2, big area backfill was done by big equipment and corner should be paid more attention.2::回填土大面積為機(jī)械回填,對(duì)角落及難點(diǎn)處人工回填,并采用打夯機(jī)夯實(shí),3, steel binding did not meet requirement and WJ has redone. ;3;水池鋼筋綁扎、鋼筋之間的間距不符合規(guī)范要求,總包已整改,符合要求;4, conc
6、rete pouring of water tank met requirement.4:水池混凝土施工符合要求5, concrete after check was commercial concrete and intensity level was C30 which complied with design requirement.5:混凝土檢查為商品混凝土,強(qiáng)度等級(jí):C30,與設(shè)計(jì)要求一致;6, concrete curing was done after 24 hours of pouring.6:澆灌后24小時(shí)進(jìn)行了澆水保養(yǎng);7, steel type, size, grade
7、and quantity met design requirement.7:鋼筋安裝的品種、規(guī)格、級(jí)別、數(shù)量符合設(shè)計(jì)要求 ;8, appearance quality of steel was good.8:鋼筋外觀質(zhì)量較好;材料進(jìn)場(chǎng)情況Arrived Materials Steel came in site and quality was ok which was agreed to used.Commercial concrete came in site and intensity level was C30 after check.Concrete masonry came in si
8、te and was agreed to used for office foundation. 鋼筋進(jìn)埸:質(zhì)量符合要求,同意用于本工程;商品混凝土進(jìn)埸,檢查強(qiáng)度等級(jí)C30;混凝土砌塊進(jìn)埸,用于辦公樓基礎(chǔ);見(jiàn)證取樣Sample test No 無(wú)材料使用情況Materials UsingConcrete quality met requirement and intensity level was C30.Steel came in site and quality was ok. 用于基礎(chǔ)商砼質(zhì)量合格。強(qiáng)度等級(jí):C30;鋼筋進(jìn)埸,質(zhì)量合格本周主要工作情況This weeks main wor
9、k 1, dailty check on site mainly for daily procedure incluing concrete pouring, steel installation and formwork installation.1:現(xiàn)埸例行巡視檢查七個(gè)工作日;主要對(duì)當(dāng)日施工的工序進(jìn)行巡視檢查, 巡視的工序:、混凝土施工、鋼筋安裝、模板支設(shè) ;2, check the elevation of formwork and check certificate of commercial concrete.2:檢查基礎(chǔ)模板支設(shè)的標(biāo)高,檢查了商品混凝土的合格證明文件;3, chec
10、k foundation steel installation and take note of blind work.3:對(duì)基礎(chǔ)鋼筋安裝進(jìn)行了檢查,并做好隱蔽驗(yàn)收記錄;4, stand by when concrete pouring of water tank.4:對(duì)水池混凝土施工作了旁站監(jiān)理;5, take part in weekly progress meeting held by UFO and requirements of Jianli were raised as below:5:參加UFO召開(kāi)的工程例會(huì)一次,并在會(huì)提出了:監(jiān)理對(duì)施工工作的要求,主要為:1,next proc
11、edure can be done after steel installation of water tank was confirmed by Jianli. 1對(duì)水池的鋼筋安裝必須經(jīng)過(guò)監(jiān)理確認(rèn)后,方可進(jìn)入下道工序施工;要求做好前期使用材料的報(bào)審工作;2, safety plan should be provide of east side retaining wall construction.2對(duì)東面擋土墻施工安全工作進(jìn)行了交底工作;6, organize and hold safety meeting and requirements of Jinali were raised as
12、 below:6:組織召開(kāi)安全工程例會(huì),提出了監(jiān)理對(duì)施工工作的要求,主要為:1, safety of aerial work.1 高空 作業(yè)的施工安全。2, safety of temporary power usage 2 臨時(shí)用電的施工安全4, ensure that workers have the protective equipment.3 工人勞保用品使用的安全檢查;隱蔽驗(yàn)收情況Concealed workCheck wall steel work of water tankCheck wall formwork of water tankCheck steel blind wor
13、k of water tank水池墻板鋼筋檢驗(yàn)批驗(yàn)收.水池墻板模板施工檢驗(yàn)批驗(yàn)收 ;水池鋼筋隱蔽驗(yàn)收 發(fā)文情況OutgoingDocumentsOne Jianli safety meeting minutes and one Jianli weekly report.;安全監(jiān)理例會(huì)紀(jì)要一份;監(jiān)理周報(bào)一份;收文情況Accepting DocumentsOne WJ weekly report6 copies of test application materials施工情報(bào)周報(bào)一份總包檢驗(yàn)批驗(yàn)收資料6份。安全情況SafetyNo accident, detail please check sa
14、fety meeting minutes沒(méi)發(fā)生安全事故;監(jiān)理會(huì)同UFO召開(kāi)了現(xiàn)埸安安全工作會(huì)議,:詳見(jiàn)會(huì)議紀(jì)要;下周工作要點(diǎn)Key point of next week 1, quality control to water tank construction1:水池施工的質(zhì)量控制;2, quality control to office foundation masonry 2:辦公樓基礎(chǔ)砌體的質(zhì)量控制。3, quality control to concrete construction mainly for quality reoirt of commercial concrete an
15、d construction codes and so on. 3:混凝土施工的質(zhì)量控制,主要檢查商品混凝土的質(zhì)量報(bào)告、施工的規(guī)范要求、標(biāo)高、振動(dòng)密實(shí)、人工收面等質(zhì)量情況的控制;4, quality control to formwork of office bulding level 3, and steel bars installation. Stand by when concrete pouring.4:辦公樓三層的模板,鋼筋安裝質(zhì)量控制,混凝土施工的旁站監(jiān)理工作;5, quality control to retaining wall construction.5:擋土墻施工的質(zhì)量控制;6, quality control to steel fabrication and installation .6:鋼筋制作、安裝的質(zhì)量控制;天氣情況:Weather reportIt was mainly clear to overcast and normal temperatu
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 地理高二月考試卷及答案
- 2025-2031年中國(guó)鋁加工型材行業(yè)市場(chǎng)全景評(píng)估及投資機(jī)會(huì)研判報(bào)告
- 2025屆福建省福州市三校聯(lián)考高二下化學(xué)期末聯(lián)考試題含解析
- 無(wú)人機(jī)應(yīng)用技術(shù)2.6.固定翼拉煙表演
- 無(wú)人機(jī)應(yīng)用技術(shù)1.6.新型的穿越機(jī)控制設(shè)備
- 2025屆新疆沙灣一中高一下化學(xué)期末統(tǒng)考試題含解析
- 2025屆河南省洛陽(yáng)市理工學(xué)院附中化學(xué)高二下期末質(zhì)量檢測(cè)試題含解析
- 政治題目設(shè)問(wèn)方式及答案
- 2025至2030年中國(guó)高強(qiáng)度單片低輻射鍍膜防火玻璃行業(yè)投資前景及策略咨詢報(bào)告
- 2025至2030年中國(guó)生物護(hù)膚品行業(yè)投資前景及策略咨詢報(bào)告
- 2025年 武漢市漢陽(yáng)區(qū)社區(qū)干事崗位招聘考試筆試試卷附答案
- 2025年 云南省危險(xiǎn)化學(xué)品經(jīng)營(yíng)單位安全管理人員考試練習(xí)題附答案
- 美發(fā)師五級(jí)試題及答案
- Q-GDW10250-2025 輸變電工程建設(shè)安全文明施工規(guī)程
- 2024-2025學(xué)年四年級(jí)(下)期末數(shù)學(xué)試卷及答案西師大版2
- 2025-2030年中國(guó)釹鐵硼永磁材料行業(yè)市場(chǎng)現(xiàn)狀供需分析及投資評(píng)估規(guī)劃分析研究報(bào)告
- 2025-2030年中國(guó)高導(dǎo)磁芯行業(yè)深度研究分析報(bào)告
- 宣城市宣州區(qū)“政聘企培”人才引進(jìn)筆試真題2024
- 遠(yuǎn)程胎心監(jiān)護(hù)數(shù)據(jù)解讀
- 2025年全國(guó)法醫(yī)專項(xiàng)技術(shù)考試試題及答案
- 2025年寧夏銀川市中考?xì)v史三模試卷(含答案)
評(píng)論
0/150
提交評(píng)論