金屬礦山采礦專業(yè)英語_第1頁
金屬礦山采礦專業(yè)英語_第2頁
金屬礦山采礦專業(yè)英語_第3頁
金屬礦山采礦專業(yè)英語_第4頁
金屬礦山采礦專業(yè)英語_第5頁
已閱讀5頁,還剩45頁未讀, 繼續(xù)免費閱讀

下載本文檔

版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領

文檔簡介

1、采礦專業(yè)英語安全爆破器材safety blasting material安全平臺safety berm安全信號裝置safety signal device銨銻炸藥ammonite銨油炸藥ammonium nitrate-fuel oil agent凹陷露天礦open-pit in rolling terrain扒礦機slusher爆破工程blasting engineering保安礦柱safety pillar刨鏟挖掘機excavator with planning operation爆堆muck pile爆轟detonation爆力detonation power爆力運搬blasting-p

2、ower handling爆破安全blasting safety爆破測試measurements of blasting action and effect爆破飛石flyrock爆破聚能效用effect of cumulative energy爆破漏斗blasting crater爆破落礦ore break by blasting爆破質量qulity of blasting爆破作用指數(shù)index of blasting action爆燃deflagration爆速velocity of detonation爆炸explosion備采礦量stoping reserve崩落采礦法caving mi

3、ning methed崩落礦巖墊層cushioned mat of caved rock or ore崩落巖石覆蓋下放礦ore drawing under caved rock閉坑地質工作geological work for mine closure壁式充填采礦法long-wall fill stoping邊坡slope邊坡地質工程engineering geology of side slope邊坡掛網噴漿meshing and grouting邊坡檢測slope monitoring邊坡破壞模式mode of slope failure邊坡設計slope design邊坡疏水slope

4、drainage邊坡穩(wěn)定分析概率統(tǒng)計法probabilistic method for slope stability analysis邊坡穩(wěn)定分析剛體平衡法rigid equilibrium method for slope stability analysis邊坡穩(wěn)定分析數(shù)值法numerical value method for slope stability analysis邊坡穩(wěn)定性系數(shù)分析parameter analysis for slope stability變電所substation變形觀測deformation measurement 變質巖metamorphic rock

5、并聯(lián)通風網絡parallel flow network 剝采比stripping ratio剝離stripping補償空間compensating space采剝量驗收測量acceptance surveying of excavated volume采剝總量total excavation quantity 采場測量surveying stope 采場底部結構sill structure of stope 采場地壓控制ground control of stope 采場空硐測量chamber surveying 采場通風stope ventilation采場圍巖加固reinforcement

6、 of surrounding rock of stope采出礦石extracted ore 采掘比development ratio 采掘工作面配電點electric distribution box at workings 采掘機械mining machinery采掘技術計劃extraction-development plan of mine 采掘平衡balance between development and extraction 采空區(qū)處理goaf management采礦mining采礦工程mining engineering 采礦工業(yè)mining industry 采礦工藝mi

7、ning technology采礦系統(tǒng)工程mining system engineering 采礦學mining science 采礦專家系統(tǒng)expert system in mining 采砂船dredge采砂船采挖法digging procedure of dredging采砂船采礦方法dredging method采砂船采區(qū)防凍preventing ground freeze in dredging area 采砂船采區(qū)解凍thrawing of dredging area 采砂船采區(qū)供水water supply in dredging area采砂船開采dredging采砂船開拓dev

8、elopment of dredging 采砂船碎散分級breaking and screening of dredging 采砂船選礦washing process on the dredge采準stope preparation 采準工作量ratio of preparation work 采準礦量prepared reserve殘積層eluvium槽井探trench and shallow-shaft explorations側斜鏟斗裝載機side triping bucket loader測風站station for air measurement柴油鏟運機diesel-powered

9、 load-haul-damp unit 鏟插裝載機power shovel with tilting boom and conveyor 長巷道掘進通風long dead-end driving face ventilation 超前探水detecting water with pilot hole超聲波測量ultraacoustic measurement 車鏟比ratio of truck to shovel 車廂式裝運機auto loader沉積巖sedimentary rock承載索track rope遲爆postponed explosion赤平極射投影stereographic

10、projection充填filling充填倍線multiple ratio pipe length-to-column in filling充填材料filling material 充填材料沉縮率rate of fill settlement 充填材料管道輸送pipelining of filling material 充填材料滲透系數(shù)permeability coefficient or fill 充填材料制備filling material preparation 充填采礦法mining method employing fill 充填機械stowing machine充填接頂fill t

11、ightenning 充填井filling shaft 充填井場地總平面布置general layout for filling shaft area充填料制備自動化automation of filling material preparation充填體作用function of fill mass 充填系統(tǒng)filling system 沖擊式鑿巖percussive drilling 抽出式通風exhaust ventilation 除塵裝置dust remover 儲槽振動裝運機vibrating auto loader 儲量剝采比tripping to reserve ratio 觸變

12、泥漿collaidal mud穿孔drilling 串車提升train hoisting 串聯(lián)通風網絡series flow network垂直分條充填采礦法perpendicular slot fill stoping 垂直深孔階段礦房采礦法block open-stoping with vertical longhole 措施井shaft for speedening development excavation 大爆破后通風ventilation after large blasting大塊boulder大陸架砂礦床開采continental shelf placer mining 大水

13、礦床開采extraction of water-contained ore body 帶式輸送機belt conveyor帶式輸送機自動化automation of belt conveyor帶式提升conveyor hoisting帶式轉載機belt transfer 單層崩落采礦法single slice caving 單斗挖掘機single-bucket excavator單斗挖掘機采裝single-bucket excavator loading 單斗挖掘機排土waste disposal with power shovel 擋土墻retaining wall導爆管detonating

14、 tube 導爆索detonating cord 導風板baffle 導軌式鑿巖機drifter導火索safety fuse 導向輪deflection pulley 倒堆采礦法over-casting mining method 等值線圖contour sheet地表保護等級protection rank of surface ground地表移動surface movement地表移動計算概率積分法probability integration method for calculation of surface movement地表鉆孔抽水dewatering through well 地

15、下采礦方法underground mining method 地下采礦方法設計的計算機方法computerized design of underground mining method 地下采礦方法的選擇choice of underground mining method 地下采礦鉆車underground mining jumbo地下采區(qū)變電所underground section substation地下鏟運機load-haul-dump unit 地下開采underground mining 地下礦電纜線路cable line of underground mine地下礦電氣設備安全

16、接地safe grounding of underground electrical equipment地下礦開拓development of underground mine 地下礦開拓方法development method of underground mine 地下礦開礦系統(tǒng)development system of underground mine 地下礦排水drainage in underground mine地下礦配電electric power distribution of underground mine地下礦山underground mine地下礦深孔爆破longhol

17、e blasting in underground mine 地下礦用自卸汽車dump truck for underground mine 地下礦中深孔爆破medium-longhole blasting in underground mine 地下連續(xù)采礦機continuous underground miner地下水groundwater地下主變電所underground main substation 地壓觀測ground pressure measurement 地質構造geological structure 地質構造圖geological structure map 地質平面圖g

18、aological plan電耙electronic powered slusher電爆檢查儀表checking instrument of electric blasting電爆網絡electric priming circuit電鏟electric excavator電動鏟運機electric powered load-haul-dump unit 電動輪自卸汽車motorized wheel dump truck 電動鑿巖機electric rock drill電動破碎巖石rock breaking with electric heating吊罐raise cage 調度絞車car sp

19、otting hoist 凍結孔freezing hole 凍結循環(huán)freezing circuit 凍結壓力freezing pressure 硐室爆破chamber blasting 硐室掘進chamber excavation 斷層fault斷層破碎帶礦柱pillar for fault fracture zones斷裂構造fracture structure 堆浸heap leaching 對角式通風系統(tǒng)diagonell ventilation system 蹾罐事故cage bumping多點位移計multiplepoint displacement meter多斗挖掘機multi

20、-bucket excavator 多功能車multi-function vehicle 多級機站通風系統(tǒng)multistage fan-station ventilation system 多金屬結核開采polymetallic nodule mining二次爆破secondary blasting 二次開采secondary mining 翻車機car dumper 反鏟挖掘機backhoe方框支架充填采礦法square-set with fill method防洪溝flood ditch防火列車train for fire prevention防火墻fire barrier防水溝water

21、 ditch防火門fire door防水礦柱water barrier防水墻bulk-head防水帷幕water-sealing curtain防水閘門water door房柱采礦法room-and-pillar method 放礦計劃圖表chart of ore drawing 放礦截止品位cut-off gradeof ore drawing 放礦制度procedure of ore drawing非均質流充填材料管道輸送pipelining of fill with heterogeneous flow非耦合裝藥decoupling loading非鈾礦山排氡通風ventilation

22、for exhausting radon in non-uranium mine廢石waste廢石場waste dump廢石場穩(wěn)定the stability of waste pile 廢石堆瀝濾水防治leaching water control of waste dump 廢石混入率waste rate廢石排棄waste disposal 分層崩落采礦法top slicing 分層剝采比bench stripping ratio 分層掘溝法layer trenching分段崩落采礦法sublevel caving method分段礦房采礦法sublevel open stoping分段落礦階

23、段礦房采礦法block opening with ground breaking from sublevel分區(qū)通風系統(tǒng)zone ventilation system 風井ventilating shaft 風流局部阻力local resistance of airflow 風流摩擦阻力friction resistance of airflow 風流正面阻力frontal resistance of airflow 風門air door風墻air bulkhead 風橋air bridge 風筒air tube風障air brattice風阻ventilation resistance fa

24、ctor封閉圈contourline passing the lowest point of topage in final pitlimit風扇調節(jié)風量regulating air volumn by booster fan復合井壁multiple-shaft wall 復雜通風網絡complex ventilation network 副井auxiliary shaft干式充填系統(tǒng)dry-stowing system 干式鑿巖捕塵dust-collecting in dry drilling 鋼繩沖擊式鉆機churn-drill rig 鋼繩牽引帶式輸送機cable belt convey

25、or 鋼繩芯帶式輸送機steel belt conveyor 鋼絲繩提升設備hoisting equipment with wire rope 鋼弦壓力計wire pressuremeter高度補償器height compensator for mine car 高山礦床開采mining at high elevation 高臺階爆破high bench blasting高壓水射流破碎巖石rock cutting by high pressure water jet隔水層impermeable layer根底toe rock 工業(yè)儲量industrial reserve 工作幫working

26、slope 工作幫坡角angle of working slope 構造等高線圖structure-concour map固井sealing of drop-shaft bottom to rock刮板輸送機scraper chain conveyor灌漿滅火法fire extinguishing with mud罐道shaft guide 罐籠cage 罐籠提升cage hoisting光面爆破smooth blasting滾刀破碎巖石rock breaking with rolling disk海濱砂礦床開采beach placer mining 海洋采礦marine mining 海洋礦

27、產資源marine mineral resource 含水層aquifer毫秒雷管millisecond detonator 橫向工作線采礦法transverse cutmining method 橫巷cross cut后卸鏟斗裝載機overshot loader護坡slope covering滑坡反分析back analysis of slope failure滑坡防治prevention and remedy of slope failure環(huán)形工作線采礦法annular cut mining method回采stoping 回采單元extraction unit 回采工作面stope f

28、ace 回轉鉆眼rotary drilling 混凝土泵concrete pump 混凝土澆灌機concrete placer 混凝土噴射機shotcrete machine 混凝土噴射機械手shotcrete robot混凝土裝配式砌塊支護support of precast concrete set火力鉆機jet piercer火區(qū)重開 re-opening of fire zone 火區(qū)檢測 monitoring of fire zone 機車 locomotive機械充填mechanical filling 機械落礦mechanical ore breaking 機械運搬mechani

29、cal handling 機械裝礦machine loading ore 箕斗skip箕斗提升skip hoisting 箕斗卸載裝置skip dumping arrangement 箕斗裝載裝置skip loading arrangement 擠壓爆破tight blasting繼爆管detonating relay假頂mat架空索道aerial tramway架棚機timbering machine 檢修車repair truck 漿狀炸藥slurry降落漏斗cone of depression 膠帶提升設備belt hoisting equipment 膠結充填系統(tǒng)cement-fill

30、ing system 角聯(lián)通風網絡diagonal flow network 階段level階段崩落采礦法block caving method 階段高度interval of level 階段開采順序mining sequence of level 階段礦房采礦法block open stoping 階段強制崩落采礦法forced block caving method 階段水平布置layout of level 階段通風系統(tǒng)stage ventilation system階段自然崩落采礦法spontaneous block caving mining method節(jié)理joint節(jié)理玫瑰花圖

31、rose diagram of joint 金剛石鉆機diamond drill 金剛石鉆進diamond drilling 金屬支架支護metal support近井點測量near shaft-point surveying 經濟合理剝采比break-even stripping ratio 井底車場shaft station 井底水窩排水drainage at shaft bottom井點降水法lowering the water table by well-point井架headframe 井塔tower 井筒保安礦柱shaft pillar 井筒布置方式layout of the sh

32、aft 井筒鉆進shaft drilling井下電機車運輸underground electric locomotive haulage井下硐室underground rooms 井下高程測量underground elevation surveying 井下經緯儀導線測量underground theodolite traversing 井下排泥mud drainage in underground mine 井下破碎站underground crusher station 井下破碎站通風除塵dust control in station of treaker 井下牽引車undergroun

33、d tow vechicle 井下水泵房underground pump room井下水倉underground sump 井下水倉清理underground sump cleaning 井下無軌運輸underground trackless haulage 井下運輸underground haulage井下運輸自動控制automatic control of underground haulage井下炸藥庫underground explosive magazine井巷風速air velocity in airway井巷復合支護conpound support of shaft-and-dr

34、ift井巷貫通測量surveying for drivage of two approaching headings井巷錨桿支護rockbolt support of shaft-drift井巷錨索支護cable bolt support of shaft-drift井巷噴錨索聯(lián)合支護combined support of shotcrete with rock bolt and wire-mesh井巷噴射混凝土支護support of shaft-drift with shotcrete井巷支護support of shaft-drift 井巷支護監(jiān)測monitoring of suppor

35、t 靜電防護electrostatic protection靜態(tài)膨脹劑破碎巖石rock breakage with static expansive agent境界剝采比stripping ratio of pit limit境界礦柱boundary pillar 局部通風local ventilation 局扇通風local fan ventilation 拒爆misfire聚晶金剛石鉆頭polycrystalline diamond bit掘溝trenching 掘進盾構tunnelling sheld 掘進鉆車tunnel jumbo均壓滅火法 fire extinguishing by

36、 pressure balancing 均流質充填材料管道輸送 pipelining of fill with homogeneous flow 卡他度 kata degree開采強度mining intensity 開采順序mining sequence 開拓井巷development opening 開拓礦量development reserve 抗滑樁pile坑道勘探opening exploration坑口mining productive unit坑線haul way空場采礦法open stope mining method 空氣過濾裝置air-filtering arrangeme

37、nt 空氣幕調節(jié)風量regulating air volume by air curtain 空氣壓縮機air compressor 空氣壓縮機的冷卻系統(tǒng)air-compressor cooling system 空氣壓縮機站air-compressor plant控制爆破controlled blasting礦倉ore bin 礦產儲量ore reserve 礦產資源mineral resource礦產資源保護protection of mineral resource 礦產資源法the law of mineral resource 礦產資源綜合利用comprehensive utiliz

38、ation of mineral resource礦車mine car 礦塵mine dust 礦塵測定dust measurement 礦床ore deposit礦床成因類型genetic type of ore deposit 礦床工業(yè)類型commercial type of ore deposit 礦床開采步驟mining stage of deposit 礦床開采技術條件technical condition of mining 礦床開采順序sequence of mineral mining 礦床勘探exploration of ore deposit 礦床勘探程度explorato

39、ry degree of deposit礦床勘探方法exploratory method of deposit礦床勘探類型exploratory method of deposit礦床模型orebody model礦床評價evaluation of ore deposit 礦床疏干dewatering of ore-deposit 礦工互救mutual rescue of miner 礦井安全出口escapeway of underground 礦井爆炸性氣體mine explosive gas 礦井等積孔mine equivalent orifice礦井反風裝置reversing arran

40、gement of mine ventilation礦井防凍prevention frostbite of mine 礦井防火fire prevention in mine 礦井放射性氣體mine radioactive gas礦井風量 volume of air flowing in mine 礦井風量調節(jié) regulating air volume in mine 礦井風流 air flow in mine礦井火災mine fire礦井進風流凈化purification of mine in-take air礦井空氣mine air礦井空氣調節(jié)air conditioning in min

41、e 礦井聯(lián)系測量shaft connecting surveying 礦井漏風air leakage in mine 礦井滅火fire extinguishing in mine 礦井熱環(huán)境enviroment of heat in mine 礦井熱源sourse of heat in mine 礦井人工制冷降溫refrigeration of mine air 礦井提升安全卡safety dog of hoist 礦井提升安全門safety door for hoisting 礦井提升防墜器safety catch 礦井提升鋼絲繩mine hoisting rope礦井提升過卷保護裝置ove

42、rwind protector of hoisting礦井提升機mine hoist礦井提升限速器speed regulator of hoist礦井提升自動控制automatic control of shaft hoisting礦井通風mine ventilation 礦井通風構筑物mine ventilation structure 礦井通風檢查mine ventilation survey 礦井通風設計design of mine ventilation 礦井通風網絡mine ventilation network 礦井通風系統(tǒng)mine ventilation system礦井通風系統(tǒng)

43、鑒定指標criteria for mine ventilation evaluation 礦井通風自動化automation of mine ventalation 礦井有毒氣體mine toxic gas礦井有效風量efficiency rate of mine air quantity礦井自然通風natural ventilation 礦塊地質圖geological map of oreblock 礦塊結構要素constructional element of oreblock 礦塊開采順序mining sequence of oreblock礦區(qū)地質地形圖topographical ge

44、ological map of mining area 礦區(qū)高程控制測量vertical control surveying of mine area 礦區(qū)工程地質圖engineering geological map of ore field 礦區(qū)開發(fā)規(guī)劃development plan of mine area 礦區(qū)勘探線剖面圖exploratory profile of mine area 礦區(qū)控制測量control surveying of mine area 礦區(qū)平面控制測量plane control surveying of mine area 礦區(qū)水文地質圖hydrogeolog

45、ical map of ore field礦區(qū)圖根導線測量topographic control with traversing in mine area 礦區(qū)圖根三角測量topographic control with triangulation in mine area 礦山綜合地質圖comprehensive geological map of mine area 礦山安全mine safety礦山安全管理mine safety management 礦山爆破安全距離safety distance from blasting ceter in mine 礦山爆破地震ground vibr

46、ations due to blasting in mine礦山爆破地震效應觀測observation of ground vibration effect from blasting in mine 礦山爆破公害控制control of public nuisance from blasting in mine 礦山爆破空氣沖擊波air blasting wave in mine 礦山采掘進度計劃編制的計算機方法conputerized method for the production scheduling in mines礦山測量mine surveying礦山測量儀器mine-surv

47、eying instrument 礦山柴油機廢氣凈化purification of mine diesel exhaust gas 礦山場地選擇selection of mine site礦山穿孔作業(yè)防塵dust provention of drilling operation in mine 礦山達產期period to attain planned annual output of mine 礦山大氣污染防治mine air pollution control礦山大氣污染擴散dispersion of mine air pollution 礦山大氣污染源sourse of mine air

48、 pollution 礦山地表沉陷防治control of surface subsidence in mine 礦山地面運輸mine surface transport礦山地質編錄mining geological logging礦山地質工作work of mining geology 礦山地質取樣mining goelogical sampling 礦山電力負荷分級classification of mine electric load 礦山電力牽引供電power supply for mine electric traction 礦山電能計算mine electric energy me

49、asurement 礦山電氣照明electric illumination of mine礦山防塵dust control in mine 礦山防水water control in mine 礦山放射性固體廢物處理disposal of solid radioactive waste in mine 礦山放射性污染防治control of radiation contamination in mine 礦山廢水處理waste water treatment in mine 礦山廢水控制waste water control in mine礦山服務年限service life of mine 礦

50、山工程地質工作engineering geological work in mine 礦山工程質量管理mining engineering qualitative management 礦山工業(yè)場地mine industrial site礦山工業(yè)場地道路road for mine industrial site 礦山工業(yè)場地地表水截流shut off surface water for mine industrial site 礦山工業(yè)場地管線pipeline for mine industrial site 礦山工業(yè)場的排水drainage for mine industrial site

51、礦山工業(yè)場地豎向布置longitudinal arrangement for mine industrial site 礦山工業(yè)場地總平面布置general layout for mine industrial site 礦山公路運輸防塵dust prevention of mine road transport礦山供電mine electric power supply礦山構筑物mine structure礦山固體廢物處理disposal and reclamation of solid waste in mine 礦山管理信息系統(tǒng)management information system

52、in mine 礦山規(guī)模scale of mine礦山軌道m(xù)ine track礦山環(huán)境地質工作enviromental geology work of mine礦山環(huán)境工程mine environmental engineering礦山機電安全safety in mining mechanical and electric equipments 礦山機修廠總平面布置general layout for mine mechanical work-shop 礦山基本建設mine capital construction礦山集中監(jiān)控centralized monitoring of mine wor

53、k 礦山計算機輔助設計computer aided design in mine 礦山技術經濟指標mining technical economic index礦山建設施工的網絡計劃技術 network sche-duling technique in mine construction 礦山建設項目經濟評價 economic evaluation of construction project in mine 礦山景觀 mine landscape礦山救護mine rescue礦山局扇消聲器muffler of auxiliary fan in mine礦山開發(fā)地區(qū)規(guī)劃的計算機方法the c

54、omputer method of district programming in mine development礦山勞動生產率mine labour productivity礦山內部運輸mine interal transport礦山年產量annual output of mine 礦山排水mine drainage 礦山排水設備mine drainage equipment 礦山排水系統(tǒng)mine drainage system 礦山企業(yè)mine enterprise礦山汽車修理廠總平面布置圖general laybout for truck maintenance shop 礦山設備安裝

55、測量surveying for installing mine equipment 礦山設備計算機管理computer management for mine equipment 礦山設備遙控remote control of mine machinery 礦山設備自動化automation of mine machinery礦山設計mine design礦山設計的優(yōu)化方法the optimization method in mine design 礦山生產地質工作geological work in the producing stage of mine 礦山生產過程計算機模擬conputer simulation in mining operation

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
  • 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論