




版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、Introduction to DRAM Testing- DRAM inside team- 2015.May第1頁,共37頁。AgendaBasis of TestingTypical DRAM Testing FlowBurn-inDC Test (Open/Short, Leakage, IDD)Functional Test & Test PatternSpeed Test第2頁,共37頁。DRAM ManufactureWaferAssemblyFinal TestingFinal Product第3頁,共37頁。Why Testing?To screen out defectWa
2、fer defectAssembly defectMake sure product meet spec of customerVoltage guard bandTemperature guard bandTiming guard bandComplex test patternCollect data for design & process improvementQualityReliabilityCostEfficiency第4頁,共37頁。IC Test MethodologyIC TesterPPSDriverComparatorDUT* DUT = Device Under Te
3、stPower SupplyOutputInputTesting of a DUT: 1. To connect PPS, Driver, Comparator & GND. 2. To apply power to DUT. 3. To input data to DUT (Address, Control Command, Data) 4. To compare output with “expect value” and judge PASS/FAIL第5頁,共37頁。Basic Test SignalDigital Waveform ElementsLogicVoltageTiming
4、第6頁,共37頁。Typical DRAM Final Test FlowBurn-inMBT (Monitor Burn in Test): Stress to screen out Early FailuresTBT (Test Burn in Test): Long time pattern testVery Low Speed(5-20MHz), High Parallel Test (10-20Kpcs/oven), Low CostCore TestDC TestFunctional TestLow Speed (DDR3 667MHz), Typical tester Advan
5、test T5588 + 512DUT HiFixSpeed TestSpeed & AC Timing TestFull Speed (DDR3 1600MHz and above), Advantest T5503 + 256DUT HiFixBackendMarking Ball Scan Visual Inspection Baking Vacuum Pack 第7頁,共37頁。DRAM Burn-in (MBT)MBT is to stress IC and screen out early failuresHigh Temperature Stress (125degC)High
6、Voltage StressStressful Pattern BIOperation TimeFailure RateInfant MortalityNormal LifeWorn outNew productMature productBath Curve第8頁,共37頁。DRAM Burn-in (TBT)TBT is for long time test patternsMultiple temperature tested (e.g. 88C, 25C, -10C)Long test time at low speedPatterns cover all cell arraysNo
7、Stressful conditionHigh parallel test count, low costBoth MBT and TBT does NOT test DC (Ando Oven)第9頁,共37頁。DRAM Advantest TestDC TestOpen/Short testLeakage testIDD testFunctional Test (Core Test)Different parameter & Pattern for each functionTo check DRAM can operate functionallySpeed TestTiming tes
8、t different speed grade第10頁,共37頁。DC Test DC Test Method:ISVM:I SourceV MeasureVSIMV SourceI MeasureVCCVCC第11頁,共37頁。DC Test Open ShortPurpose: Check connection between pins and test fixture Check if pin to pin is short in IC package Check if pin to wafer pad has open in IC package Check if protection
9、 diodes work on die It is a quick electrical check to determine if it is safe to apply power Also called Continuity Test第12頁,共37頁。DC Test Open ShortFailure Mode:a) Wafer ProblemDefect of diodeb) Assembly ProblemWire bondingSolder ballc) Contact ProblemSocket issueCore CircuitDefective diodeSocket Po
10、go Pin defectWire touched第13頁,共37頁。DC Test Open ShortO/S Test Condition:ProcedureGround all pins ( including VDD)Using PMU force 100 uA, one pin at a timeMeasure voltageFail open test if the voltage is greater than 1.5 VFail short test if the voltage is less than 0.2 V100uA0.65 VPMUforcesenseforceMe
11、asureVss=0Vdd=0100uAFail OpenPassFail Short 1.5V 0.2 V1.5 V-100uA-0.65 VPMUforcesenseforceMeasureVss=0Vdd=0-100uAISVMOther=0Typical -0.65V第15頁,共37頁。DC Test LeakagePurpose: Verify resistance of pin to VDD/VSS is high enough Verify resistance of pin to pins is high enough Identify process problem in C
12、MOS device 第16頁,共37頁。DC Test LeakageILIH/ILIL: Input Leakage High/Low To verify input buffers offer a high resistance No preconditioning pattern appliedILOH/ILOL: Output Leakage High/Low To verify tri-state output buffers offer a high resistance in off state Test requires preconditioning pattern Per
13、formed only on three-state outputs and bi-directional pins第17頁,共37頁。DC Test LeakageFailure Mode:a) Wafer problemb) Assembly problemc) Socket Contact problem (short)Die crackBall touch (Short)第18頁,共37頁。DC Test Input Leakage LowTest Condition:ProcedureApply VDDmax (2.0V)Pre-condition all input pins to
14、 logic 1 (high voltage)Using PMU (Parametric Measure Unit) force Ground to tested pinWait for 1 to 5 msecMeasure current of tested pinFail IIL test if the current is less than 1.5 uAPassFail 1.5 uA2.0 V10nAPMUforceMeasureVss=0VDDmaxILIHVLSICore“1”“0” all input pins = 0VONOFF第20頁,共37頁。DC Test Output
15、Leakage LowTest Condition:ProcedureApply VDDmax (2.0V)Pre-condition the DUT to tristate with specific patternWait a specific timeUsing PMU force VDDMAX to tested I/O pinMeasure currentFail IOH test if the current is greater than +4.5uA or less than -4.5uAPassFailGT 4.5 uA0.0 V-10nAPMUforceMeasureVss
16、=0VDDmaxILOLVLSICoreOFFOFFPre-condition Pattern 1/0FailLT -4.5 uA“0”All input pins = 2.3VAll output pins=0V/2.3V第21頁,共37頁。DC Test Output Leakage HighTest Condition:ProcedureApply VDDmax (2.0V)Pre-condition the DUT to tristate with specific patternWait a specific timeUsing PMU force VDDMAX to tested
17、I/O pinMeasure currentFail IOH test if the current is greater than +4.5uA or less than -4.5uAPassFailGT 4.5 uA2.0 V10nAPMUforceMeasureVss=0VDDmaxILOHVLSICoreAll input pins = 2.3VAll output pins=0V/2.3VOFFOFFPre-condition Pattern 1/0FailLT -4.5 uA“1”第22頁,共37頁。DC Test Test Program Condition第23頁,共37頁。D
18、C Test IDDPurpose:IDD (or ICC) measures current of Vdd pin in different statesIt makes sure power consumption not higher than expected.Failure Mode:Wafer process issueAssembly issueContact issue (VDD, VSS)第24頁,共37頁。DC Test Static IDDTest Condition:ProcedureUsing PMU to apply VDDmax on VDD pinExecute
19、 Pre-condition patternStop the patternWait a specific time Measure current flowing into VDD pins while device is in idleFail IDD test if the current is greater than IDD spec. ( Normal in mA)PassFailGT spec2.0 V10mAPMUforcesenseforceMeasureVDDIDDVLSIVSS=0Pre-condition Pattern第25頁,共37頁。DC Test Dynamic
20、 IDDTest Condition:ProcedureUsing PMU to apply VDDmax on VDD pinExecute Pre-condition patternWait a specific time Measure current flowing into VDD pins while device is executing patternFail IDD test if the current is greater than IDD spec. ( Normal in mA)Stop patternPassFailGT spec2.0 V80mAPMUforces
21、enseforceMeasureVDDIDDVLSIVSS=0Pre-condition PatternPre-condition Pattern第26頁,共37頁。Function TestTo verify DRAM can operate functionally, we need to do Functional test.- Easy Function Test (EFT)It check basic IC functionality by reading “0” (or “1”) from all cell after writing “0” (or “1”) in. Typica
22、l Test Pattern: March Pattern (e.g. March C-)March C- Algorithm: (w0);(r0,w1);(r1,w0);(r0,w1);(r1,w0); (r0)Operation Count: 10*nScan type: X-Scan (X inc - Y inc), Y-Scan(Y inc - X inc)Fault Coverage: Most of Failure Mode第27頁,共37頁。0000000000000000000000000000000R0000000000000000W100000000000000R01000
23、00000000000W110000000000000R0110000000000000W111000000000000R0111000000000000W1111000000001111111100001111111111111111111111111111DRAM Test Pattern (X-scan)YX000110110001101128.第28頁,共37頁。DRAM Test March Pattern29.第29頁,共37頁。DRAM Test Failure ModeStuck-at Fault (SAF)Coupling Fault (CF)Shorts between d
24、ata linesCrosstalk between data linesTransistion Fault (TF)Cell can be set to 0 and not to 1 (or vice versa) when its operatedAddressing Fault (AF)Address line stuckOpen in address lineShorts between address linesWrong accessCell stuckDriver stuckData line stuckNeighbor Pattern Sensitive Fault (NPSF
25、)Pattern sensitive interaction between cellsData Retention Fault (DRF)Data can not kept same status in cell as time pass第30頁,共37頁。DRAM Test March PatternMarch C- is the most effective31.第31頁,共37頁。DRAM Test 1HTDefect ModeOPENLEAKIDDEFTTESTER RELATEDWAFER ISSUEDIE CRACKDIE CHIPSURFACE DAMAGENG DieNON DIENON WIREAE OPENWIRE SHORT WITH WIREWIRE SHORT WITH DIE EDGEWIRE SWEEPNON BROKEN INNER LEADOTHERS: S
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 企業(yè)無息借款協(xié)議書
- 遺留房產分割協(xié)議書
- 煤礦采煤師徒協(xié)議書
- 軟體工廠轉讓協(xié)議書
- 醫(yī)院員工培訓協(xié)議書
- 垃圾分類服務協(xié)議書
- 區(qū)域經銷代理協(xié)議書
- 貨款結算協(xié)議書參考
- 妻子轉讓協(xié)議書范文
- 養(yǎng)殖安全協(xié)議書模板
- 2025 年深入貫徹中央八項規(guī)定精神學習教育實施方案
- 《Python程序設計》全套教學課件
- 2025年空壓機行業(yè)發(fā)展戰(zhàn)略研究及投資潛力預測評估報告
- 2025年河北省石家莊市一中、唐山一中等“五個一”名校高三全真模擬(最后一卷)生物試題試卷含解析
- 院科兩級人員緊急替代程序與替代方案
- 《金屬加工基礎(第二版)》中職全套教學課件
- 2025年湖北省初中學業(yè)水平考試數(shù)學模擬卷(二)(原卷版+解析版)
- 2025年華能新能源股份有限公司廣東分公司應屆高校畢業(yè)生招聘筆試參考題庫附帶答案詳解
- 2025年新疆克州中考英語一模試卷
- 2024年新疆伊犁州直檢察機關招聘聘用制書記員筆試真題
- 口腔四手操作培訓
評論
0/150
提交評論