




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、When a Dream becomes RealityThe Rion-Antirion BridgeJacques Combault (France)Second Severn Crossing(UK)5 kmConfederation Bridge(Canada)13 kmRion-Antirion Bridge(Greece)5 cable-stayed spansVasco de Gama Bridge(Portugal)16.5 kmOresund Bridge(Denmark Sweden)13 kmMillau Viaduct(France)8 cable-stayed spa
2、nsSutong Bridge(China)1088 m long main spanHangzhou Bridge(China)36 km215 yearsofMajor AchievementsGulf of Corinth2252 m7383 ft392 m1285 ft239 m783 ft65 mRIONANTIRIONDEEP WATER65 m.RIONANTIRIONSAND AND GRAVELCLAYSILTWEAK ALLUVIUMSPLANELEVATIONPIER BASEVERTICAL SLIP : 2 mHORIZONTAL OPENING : 2 mTECTO
3、NIC MOVEMENTS180 000 tRIONANTIRIONSHIP IMPACT16 knotsNO UNUSUAL PROBLEM65 m WATER DEPTHWEAK ALLUVIUMSSEISMIC INTENSITYSHIP IMPACTTECTONIC ACTIVITYDEEP WATERHUGE INTERACTION FORCESSEISMIC and TECTONIC ACTIVITY+WEAK ALLUVIUMSWHAT ABOUT FOUNDATION ?HUGE INTERACTION FORCES+The Akashi Kaikio Bridge - Kob
4、e (Japan)MAIN BRIDGEInitial ConceptPoor quality soilShallow pad foundationSoil improvement+Supporting SoilPylon Deck ConnectionDisplacement capacitySeismic hazardEnergy dissipation+Pylon HeadTransverse PTConcrete pylon headWeight+MAIN BRIDGEFinal ConceptPylon Made Monolithic Base re-designed and Sim
5、plified Head made Composite and Light65 m90 m230 mPylonsConceptSeabed Deposits Removed Reinforced with Steel Pipes Gravel Soil Pylon InterfaceDeck Made Continuous Fully Suspended Made SlenderDeckandCablesThe Rion - Antirion BridgeComposite steel-concrete deckSteel I girders 2.20 m highConcrete top s
6、lab 25 cm thick5 continuous spansRion side span 286 m long3 typical spans 560 m long Antirion side span 286 m longFully suspended2*23 pairs of cable-staysUniformly distributedRegular spacing 12.15mSimply supported at both endsComposite steel-concrete deckSteel I girders 2.20 m highConcrete top slab
7、25 cm thick5 continuous spansRion side span 286 m long3 typical spans 560 m long Antirion side span 286 m longFully suspended2*23 pairs of cable-staysUniformly distributedRegular spacing 12.15 mSimply supported at both endsCONTINUOUS DECKStay-Cablesspacing: 12.174 m strands: 43 - 55 - 61 - 73Top Fla
8、ngewidth: 0.80 - 1.00 m thickness: 40 - 80 mm22.10 mBottom Flangewidth: 1.00 - 1.35 - 1.70 m thickness: 80 - 90 mm2.20 m15 mm25 mmComposite steel-concrete deckSteel I girders 2.20 m highConcrete top slab 25 cm thick5 continuous spansRion side span 286 m long3 typical spans 560 m long Antirion side s
9、pan 286 m longFully suspended2*23 pairs of cable-staysUniformly distributedRegular spacing 12.15mSimply supported at both endsComposite steel-concrete deckSteel I girders 2.20 m highConcrete top slab 25 cm thick5 continuous spansRion side span 286 m long3 typical spans 560 m long Antirion side span
10、286 m longFully suspended2*23 pairs of cable-staysUniformly distributedRegular spacing 12.15mSimply supported at both endsCONTINUOUS DECK2865602252560560286Final Characteristics of the BridgeComposite steel-concrete deckSteel I girders 2.20 m highConcrete top slab 25 cm thick5 continuous spansRion s
11、ide span 286 m long3 typical spans 560 m long Antirion side span 286 m longFully suspended2*23 pairs of cable-staysUniformly distributedRegular spacing 12.15mSimply supported at both endsComposite steel-concrete deckSteel I girders 2.20 m highConcrete top slab 25 cm thick5 continuous spansRion side
12、span 286 m long3 typical spans 560 m long Antirion side span 286 m longFully suspended2*23 pairs of cable-staysUniformly distributedRegular spacing 12.15mSimply supported at both endsCONTINUOUS DECKDAMPERSFUSEComposite steel-concrete deckSteel I girders 2.20 m highConcrete top slab 25 cm thick5 cont
13、inuous spansRion side span 286 m long3 typical spans 560 m long Antirion side span 286 m longFully suspended2*23 pairs of cable-staysUniformly distributedRegular spacing 12.15mSimply supported at both endsComposite steel-concrete deckSteel I girders 2.20 m highConcrete top slab 25 cm thick5 continuo
14、us spansRion side span 286 m long3 typical spans 560 m long Antirion side span 286 m longFully suspended2*23 pairs of cable-staysUniformly distributedRegular spacing 12.15mSimply supported at both endsCONTINUOUS DECKRION-ANTIRION Bridge (Greece)28656022525605602862701480890320TATARA Bridge (Japan)12
15、74484751271177TING KAU Bridge (Hong Kong)Structural StabilityNatural Seimic IsolationStructural FlexibilityFor linear variations (shrinkage, creep, temperature)For tectonic displacementsFor gravity loads (traffic)Structural LightnessBetter seismic behaviourBetter aerodynamic behaviourADVANTAGESMAIN
16、BRIDGEFinal DesignReinforced SoilCapacityTHEORETICAL ANALYSESGlobal Soil Bearing Capacity THEORETICAL ANALYSESKinematic Approach of the Yield Design Theory 01000020000300000200400600800Horizontal Shear Force (MN)Overturning Moment (MN-m)9m x 9m7m x 7mTHEORETICAL ANALYSESInclusion Spacing Effect WHM
17、Centrifuge Test in a Laboratory EXPERIMENTAL VALIDATIONCentrifuge Test : Reinforced Soil ModelEXPERIMENTAL VALIDATIONCentrifuge Test : Before Installation of the Foundation ModelEXPERIMENTAL VALIDATION Centrifuge Test : Ultimate Capacity TestEXPERIMENTAL VALIDATIONMonotonic Failure Load EXPERIMENTAL VALIDATIONCyclic Load (75% Fail
溫馨提示
- 1. 本站所有資源如無(wú)特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 保定學(xué)院《籃球》2021-2022學(xué)年第一學(xué)期期末試卷
- 寶雞文理學(xué)院《中學(xué)古詩(shī)文教學(xué)研究》2023-2024學(xué)年第一學(xué)期期末試卷
- 保定學(xué)院《材料力學(xué)》2021-2022學(xué)年第一學(xué)期期末試卷
- 手術(shù)鉆項(xiàng)目可行性實(shí)施報(bào)告
- 頭發(fā)護(hù)理制劑項(xiàng)目可行性實(shí)施報(bào)告
- 今天我當(dāng)家(課件)粵教版四年級(jí)上冊(cè)綜合實(shí)踐活動(dòng)-
- 數(shù)字信號(hào)顯示面板項(xiàng)目評(píng)價(jià)分析報(bào)告
- 戲劇用化妝品項(xiàng)目評(píng)價(jià)分析報(bào)告
- 機(jī)器用離合器項(xiàng)目評(píng)價(jià)分析報(bào)告
- 工業(yè)用洗碗機(jī)相關(guān)項(xiàng)目建議書
- 解讀國(guó)有企業(yè)管理人員處分條例課件
- 2024-2030年中國(guó)醇基燃料行業(yè)市場(chǎng)深度調(diào)研及發(fā)展趨勢(shì)與投資前景研究報(bào)告
- 國(guó)家職業(yè)分類大典
- 2024年二手車轉(zhuǎn)讓合同電子版(3篇)
- 《考察大自然-從校園開始》課件
- 中醫(yī)藥創(chuàng)新創(chuàng)業(yè)“八段錦”智慧樹知到答案2024年浙江中醫(yī)藥大學(xué)
- 四川省成都市2024年中考?xì)v史真題試題含解析
- 2024-2030年中國(guó)玄武巖纖維行業(yè)市場(chǎng)深度調(diào)研及前景趨勢(shì)與投資研究報(bào)告
- 2024年全國(guó)統(tǒng)一考試高考新課標(biāo)Ⅰ卷數(shù)學(xué)試題(真題+答案)
- 安全生產(chǎn)法律法規(guī)清單
- 2024-2030年中國(guó)合成革行業(yè)市場(chǎng)發(fā)展分析及發(fā)展與投資前景研究報(bào)告
評(píng)論
0/150
提交評(píng)論