3/12/20141Slide
1RailTEC@IllinoisCivil
Works
–
Bridges
&
ViaductsHigh
Speed
Rail
Engineering
TC
KaoConrad
Ruppert,
Jr.Rail
Transportation
&
Engineering
Center
(RailTEC)Department
of
Civil
and
Environmental
EngineeringSlide
2RailTEC@IllinoisTypical
Structure
Types3/12/20142Height
3.05m,
Width
of
deck
12.0m,
Weight
820tonsCross
section
of
dual-track
simply-supported
box
girder
10,463km
high-speed
railways
have
opened
to
traffic,
of
which
morethan
6,000km
are
bridges.
Percentage
of
simply-supported
box
girder
PC
bridges:
90%.
The
number
of
32m
simply-supported
box
girder
in
operation:
over200,000.Typical
Structure
Types—簡(jiǎn)支箱梁Cross
section
of
single-track
simply-supported
box
girderHeight
2.8m,
Width
of
deck
7.0m,
Weight
600tonsTypical
Structure
Types3/12/20143Long-span
prestressed
concrete
continuous
beam:
Higher
spanning
capacity;
Variable
beam
height;
Three
dimension
pre-stress
system;
Symmetry
cantilever
construction
technique
.Span:
72+128+72mBeijing-Tianjin
HSRHeight
of
support
point:9.6mHeight
of
mid-span:
6.5mCross
section:
single-box
single-cellTypical
Structure
Types—連續(xù)梁Luo
River
Bridge
on
Zhengzhou-Xi'an
HSR:
V-shaped
pier
continuous
rigid
frame
bridge;
Of
48+80+48
m
span;
Height
of
the
beam
is
reduced
and
uniform.Typical
Structure
Types—V型剛構(gòu)4Elevationhinge
3/12/2014
Typical
Structure
Types—連續(xù)剛構(gòu)Jialing
River
bridge
on
Suining-Chongqing
HSR:?
prestressed
concrete
continuous
rigid
frame
bridge;?
88+160+88
m
span?
Double
thin-wall
piers
with
lateral
combination
Completed
Under-construction
Typical
Structure
Types—斜腿剛構(gòu)
Gushan
Bridge
on
Shijiazhuang-Taiyuan
HSR:
Main
span:
90m;
Prestressed
concrete
slant-legged
rigid
frame
Whole
length
of
span:
145.0m
Slant-legged:
56.43°,
Hinged
with
foundation.5New
structure
of
a
combination
of
orthotropic
plate
and
trussCross
section
of
truss
3/12/2014
Typical
Structure
Types—混凝土拱橋
Beipanjiang
Bridge
on
Shanghai-Kunming
HSR:
A
stiffening-frame
reinforced
concrete
arch
bridge
with
445
m
main
span;
Arch
axis
is
catenary;
Height
of
arch
rise
is
100m,
ratio
of
rise
to
span
is
1/4.45;
Section
of
the
arch:
single
box
three
cells,
constant
height
(9.0m)
but
variable
width;
The
largest
reinforced
concrete
arch
bridge
in
the
world
Typical
Structure
Types—鋼拱橋Nanjiang
Dashengguan
Yangtze
River
Bridge
on
Beijing-Shanghai
HSR:
Main
span:
(108+192+336+336+192+108)m;
Structure:
Six-span
continuous
steel
truss
arch
bridge;
2
high-speed
railway
lines+
2
I
level
artery
lines+
2
subway
lines;
Three
girders
for
the
steel
truss
arch;
Large
stiffness,
heavy
live
load,
novel
structure,
beautiful
shape3/12/20146Wuhan
Tianxingzhou
Yangtze
River
Bridge
on
Wuhan-Guangzhou
HSR:
The
first
HSR
bridge
across
the
Yangtze
river
in
China;
Long
span
steel
truss
cable-stayed
bridge;
Total
length
is
4657m
with
Main
span
98+196+504+196+98m;
4
railway
lines
and
6
highway
lines
The
maximum
load
capacity
highway
and
railway
combined
bridgearound
the
worldSpatial
truss
structure
withthree
main
girder,
double
deckTypical
Structure
Types-斜拉橋An’qing
Yangtze
River
Railway
Bridge,
Anhui
province:
580m
steel
truss
cable-stayed
bridge;
4
railway
lines;
Finished
in
2013.Typical
Structure
Types3/12/20147Tongling
Yangtze
River
Bridge,
in
Anhui
province:
630m
steel
truss
cable-stayed
bridge;
Lower
deck:
4
railway
lines
(Beijing-Fuzhou
HSR,
Hefei-Tongling
Railway);
Upper
deck:
6
highway
lanes;
Finished
in
2013.Typical
Structure
TypesShanghai-NantongYangtze
River
Bridge:
The
length
of
Shanghai-nantong
railway
bridge
is
11,076m;
The
length
of
the
steel
truss
of
the
main
bridge:
5,838m.And
thecorrseponding
weight
is
about
400,000
tones.
The
length
of
railway-highway
section,
6,992m.Typical
Structure
Types3/12/20148Shanghai-Nantong
Yangtze
River
Bridge:
Investment
estimation
of
the
whole
bridge
project:
15.721
billionRMB
Being
under-construction
since
Dec.
2013
High
strength
steel:
Q500qE
for
40
segments,
Q420qE
for
52segments,
Q370qE
for
72
segments.
Main
pylon:
reinforced
concrete,
C60
for
the
pylon
body
and
C50for
the
pylon
base,
the
height
over
the
pile
cap
is
325m.
Cables:
2000MPa
parallel
steel
wire
cable,
the
maximum
length
is583.8m,
the
maximum
cable
force
of
a
single
truss
is
1,333.0
t.
Foundation:
rectangular
sunk
well
foundation,
86.9m×58.7m(standard
section),
height:
105m.Typical
Structure
TypesQiongzhou
Strait
Engineering:464+1408+496+496+1408+464m
serious
double-pylon
suspension
bridge:Upper
deck:
6
highway
lines;Lower
deck:
4
railway
lines
(
2
for
250km/h
HSR,
2
for
conventional
railway)Under
feasibility
design
phraseTypical
Structure
Types—懸索橋3/12/20149Wufengshan
Yangtze
River
Bridge:
Main
span:
1036m
railway-highway
suspension
bridge;
Layout
of
the
span:
84+84+1036+84+84m;
Upper
deck:
8
highway
lanes
from
both
way;
Lower
deck:
double-line
HSR
passenger
railway,
design
speed
250km/h;
Rise-span
ratio
of
the
main
cable:
1/10,;
Two
main
cables
along
the
bridge,
space
between
which
is
43m.
Under
Preliminary
Design
phraseTypical
Structure
Types—懸索橋Acontinuous
beam-arch
combined
bridge
on
Beijing-Tianjin
Intercity
HSR:
Main
span
60+128+60m;
Cross
section:
single-box
double-cells
girder
with
variable
height;
Feature:
limited
height,
effectively
reducing
the
line’s
elevation;
Arch
added
on
the
beam:
providing
enough
vertical
stiffness,
bettercontrol
the
deformation
due
to
creep.Typical
Structure
Types-組合橋3/12/201410Xiaolan
River
Bridge
on
Guangzhou-zhuhai
Intercity
HSR
(100+220+100)m
continuous
V-shaped
arch
composite
bridge
Feature:
limited
height,
effectively
reducing
the
line’s
elevation;
Arch
added
on
the
beam:
providing
enough
vertical
stiffness,
bettercontrol
the
deformation
due
to
creep.Typical
Structure
Types-組合橋Jin-Shan
Yellow
River
Bridge
on
Datong-Xi’an
HSR:
14-(2x108)m
single
steel
truss
stiffening
T-shaped
rigid
framecomposite
structure
Stiffening
steel
truss:
improve
the
enough
vertical
stiffness,
helpmeeting
the
requirements
of
the
beam
end
angle.Typical
Structure
Types-組合橋3/12/201411Slide
21RailTEC@IllinoisTypical
Structure
TypesThe
Integrated
construction
technology
of
box
girders:(1)
Full-span
Precast
Launching
Method
(FPLM).Fabricated
in-situ
Transported
ErectedSelf-developed
900
tons
girder
transportation
vehicleSelf-developed
900
tons
girder
erection
machine.Erecting
speed:
2~4
beams/day.Storage
and
outfitting
manufacturing
areaHSR
lineConstruction
Methodology3/12/201412(1)
Full-span
Pre-cast
Launching
Method
(FPLM):Pre-cast
girdersLaunching
girderTransported
by
installed
girdersConstruction
MethodologyConstruction
Methodology3/12/201413(2)
Movable
Scaffolding
Method
(MSM):Self-developed
1400
tons
movable
bridge
fabrication
machine.Speed:1
beam/
12~15
days.
Shoring
equipment
moving
and
adjusting
Outer
form
system
adjusting
and
inspecting
Web/bottom
slab
rebar-fixing
prestressedsheath
and
tendons
placing
Inner
form
systemmoving,
adjusting
andinspecting
Top
slab
rebar-fixingand
elevationinspecting
Concreting
Curing
Pre-stressingConstruction
Methodology
Basic
procedure
Forming
T-beam
Closure
of
adjacent
T-beams
and
side
spans
Example
of
three-spancontinuous
beam
Scaffold-pouring
straightsections
of
side
spans
Forming
T-beam
byhanging
basket(temporary
consolidationprocessing)
Closure
of
side-span,releasing
temporaryconsolidation
Closure
of
mid-spanConstruction
Methodology(3)
Cantilever
casting
method3/12/201414Yuan
river
bridge
on
Shanghai-Kunming
HSRType:
rigid
frame
with
continuous
beam
bridgeMain
span:
(88+168.0+88+40)
mWorld’s
largest
bridge
of
the
same
type
(design
speed:
250
km/h)Construction
MethodologyCantilever
castingConstruction
Methodology
3/12/2014
Construction
Methodology(4)
Constructing
of
continuous
beam-arch
bridgeContinuous
beam-
arch
bridgeRotation
construction
of
steel
tube
arch121
mjack
121
mLifting
equipment
Tower
frame
248
mcableClosure
of
steel
tube
arch
15
“firstly
beam,
lastly
arch”:
constructing
beam
at
first,
and
then
erecting
arch
ribs
on
bridge
deck;
Erecting
arch
ribs
by
rotation
construction
or
assembling
on
scaffold;
arch
ribs
closure,
pouring
concrete,
assembling
hanger
rods;
Stretching
hanger
rods,
adjusting
alignmentConstruction
MethodologyAssembling
arch
ribs
on
scaffold
3/12/2014Construction
MethodologyContinuous
beam-
arch
bridge
Construction
Methodology(5)
Swivel
construction:
continuous
beam
bridge
163/12/20141733Construction
Methodology(5)
Swivel
construction:
arch
bridge
Beipanjiang
Bridge
onShanghai-Kunming
HSRConstruction
Methodology(6)
Stiff
skeleton
construction3/12/201418Surrounding
concrete
of
different
partsof
arch
ring
-1Construction
Methodology(6)
Stiff
skeleton
constructionConstruction
MethodologySurrounding
concrete
of
different
partsof
arch
ring
-2(6)
Stiff
skeleton
constructionmember
WholesegmentWhole
span
Oresund
Bridge
(3500
tons
)香港汲水門斜拉橋
節(jié)段重量500t
Wuhan
Tianxingzhou
Yangtze
River
Bridge
(700
tons)
19
3/12/2014
Construction
Methodology(6)
Stiff
skeleton
construction
Surrounding
concrete
of
differe
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 音樂企業(yè)文化建設(shè)技術(shù)服務(wù)合同(2篇)
- 蘇教版江蘇省無錫市重點(diǎn)中學(xué)2023-2024學(xué)年高一上學(xué)期期中數(shù)學(xué)試題
- 美寶蓮口紅課件
- 校園風(fēng)景 課件
- 西京學(xué)院《造型基礎(chǔ)》2021-2022學(xué)年第一學(xué)期期末試卷
- 2.1.2植物細(xì)胞第一課時(shí)
- 初二下收心班會(huì)
- 西京學(xué)院《機(jī)械設(shè)計(jì)》2022-2023學(xué)年第一學(xué)期期末試卷
- 陽光下的影子
- 西華師范大學(xué)《中國(guó)音樂史與名作賞析》2022-2023學(xué)年第一學(xué)期期末試卷
- 2024年銀行考試-招商銀行歷年考試高頻考點(diǎn)試題附帶答案
- 2024肺栓塞指南解讀2024
- 造價(jià)-人員配備方案1
- 中學(xué)教代會(huì)代表選舉辦法
- 醫(yī)院藥房二維碼溯源管理
- 四川省涼山州2023-2024學(xué)年七年級(jí)上學(xué)期期末檢測(cè)歷史試卷
- 青島市特殊建設(shè)工程消防驗(yàn)收辦事指南
- 北京市西城區(qū)2023-2024學(xué)年五年級(jí)上學(xué)期期末數(shù)學(xué)試卷
- 初中九年級(jí)化學(xué)課件復(fù)分解反應(yīng)的條件“百校聯(lián)賽”一等獎(jiǎng)
- 冷庫安全施工方案
- 《企劃案撰寫》課件
評(píng)論
0/150
提交評(píng)論