漳浦縣霞美鎮(zhèn)東港溪清淤工程實(shí)行方案漳州宏宇水利水電設(shè)計(jì)有限公司七月

報(bào)告名稱:漳浦縣霞美鎮(zhèn)東港溪清淤工程編制單位:漳州宏宇水利水電設(shè)計(jì)有限公司證書編號(hào):A審查:徐永文核定:徐永文校核:范財(cái)權(quán)項(xiàng)目負(fù)責(zé)人:邱錦木 編寫:邱錦木黃炎坤陳燕惠目錄TOC\o"1-2"\h\z\u1.綜合說(shuō)明 11.1緒言 11.2項(xiàng)目工程特性表 12.水文 22.1基本資料 22.2設(shè)計(jì)洪水計(jì)算 22.3設(shè)計(jì)洪水水面線 43.地質(zhì) 93.1工程概況 93.2區(qū)域地質(zhì)情況 93.3巖土結(jié)構(gòu)特性性 93.3地質(zhì)構(gòu)造與地震 103.4結(jié)論與建議 104.工程任務(wù)和規(guī)模 104.1工程概況 104.2工程現(xiàn)狀 104.3工程規(guī)劃 104.4項(xiàng)目建設(shè)可行性分析 104.5建設(shè)任務(wù) 115.工程布置及建筑物 115.1設(shè)計(jì)依據(jù)與標(biāo)準(zhǔn) 115.2工程總布置 116.施工組織設(shè)計(jì) 146.1施工條件 146.2施工導(dǎo)流 146.3施工條件 146.4施工總體布置 157.工程建設(shè)與管理 158.設(shè)計(jì)概算及資金籌措 168.1編制說(shuō)明 168.2工程概算與資金籌措 16附圖目錄序號(hào)圖紙名稱圖號(hào)圖幅1工程地理位置圖01A32谷歌平面布置圖02A33平面布置圖(1/9-9/9)03-11A34縱斷面設(shè)計(jì)圖(1/6-6/6)12-17A35標(biāo)準(zhǔn)斷面圖18A36橫斷面設(shè)計(jì)圖(1/5-5/5)19-23A31.綜合說(shuō)明1.1緒言項(xiàng)目區(qū)位于漳浦縣霞美鎮(zhèn)前梧村。漳浦縣位于福建東南部、漳州市南部,北緯23°43’~24°21’,東經(jīng)117°24’~118°02’。北與龍海市毗鄰,西鄰云霄縣和平和縣,縣城距漳州霞美鎮(zhèn)東臨臺(tái)灣海峽,近海毗連浮頭灣、后江港、舊鎮(zhèn)港,隔舊鎮(zhèn)港與六鰲半島相望,西與杜潯鎮(zhèn)接壤,南與下蔡林場(chǎng)毗鄰,北與舊鎮(zhèn)鎮(zhèn)交界,鎮(zhèn)政府所在地霞美村西北距漳浦縣城20公里。前梧村位于霞美鎮(zhèn)南部,東鄰后寮村,西鄰塔嶺村,北鄰山嶺村,南鄰下蔡林場(chǎng)。東港溪流發(fā)源于后寮山流經(jīng)前梧村南,至杜潯鎮(zhèn)北坂村葛仔社過(guò)四口斗門,匯入東山灣海域。受業(yè)主委托,我公司承擔(dān)《漳浦縣霞美鎮(zhèn)東港溪清淤工程實(shí)行方案》編制任務(wù),接受委托后,我公司及時(shí)組織水工、測(cè)量及地質(zhì)等相關(guān)人員到項(xiàng)目區(qū)進(jìn)行踏勘,聽取有關(guān)部門對(duì)項(xiàng)目區(qū)清淤工程的基本意見,調(diào)查收集相關(guān)資料。針對(duì)東港溪現(xiàn)狀存在的水流不暢、淤積嚴(yán)重等問(wèn)題,提出了清淤除雜、河道疏浚的建設(shè)方案并于2023年7月完畢實(shí)行方案編制。編制過(guò)程中受到霞美鎮(zhèn)政府、霞美鎮(zhèn)水利站及沿途各村的大力支持,在此表達(dá)衷心感謝。1.2項(xiàng)目工程特性表工程特性表序號(hào)項(xiàng)目單位數(shù)量備注一項(xiàng)目概況1項(xiàng)目所在位置前梧村漳浦縣霞美鎮(zhèn)2河流名稱東港溪二水文1所在流域東港溪流域2流域面積km211.43河道長(zhǎng)度km6.174河道平均坡降‰0.465項(xiàng)目區(qū)集雨面積km24.626項(xiàng)目區(qū)以上河道長(zhǎng)度km4.067項(xiàng)目區(qū)河道平均比降‰1.678設(shè)計(jì)洪水(1)5年一遇m3/s28.83三重要建設(shè)內(nèi)容1河道清淤長(zhǎng)度km3.5212清淤土方量m3535943清除水葫蘆m225210約5042m3四工程總投資萬(wàn)元141.84五總工期月32.水文2.1基本資料2.東港溪又稱霞美溪,是由周邊村鎮(zhèn)為便于雨季排澇人工開挖而成。東港溪由后寮村起源,通過(guò)后周村、下呂村、后姚村、前埔村、北坂村、前田村等,在杜潯鹽場(chǎng)東南側(cè)匯入東山灣。東港溪流域面積11.1km2,主河道全長(zhǎng)6.17km,河道平均比降0.46‰。片區(qū)內(nèi)大部分地勢(shì)較高,局部屬低洼地帶,洪水直接入海。本次工程起點(diǎn)位于前梧村、終點(diǎn)毗鄰霞美鎮(zhèn)與杜潯鎮(zhèn)分界,工程終點(diǎn)以上集雨面積為4.62km2,工程以上主河道長(zhǎng)度為4.06km,河道平均比降1.67‰。2.1.本次工程所在區(qū)域?qū)倌蟻啛釒ШQ笮约撅L(fēng)氣候。氣候溫暖,光照充足,冬無(wú)嚴(yán)寒,夏無(wú)酷暑。項(xiàng)目區(qū)數(shù)年平均氣溫20.8℃,極端最高氣溫36.6℃,極端最低氣溫3.8℃;全年最熱為6、7、8三個(gè)月,月平均氣溫28℃,最冷為12、1、2三個(gè)月,月平均氣溫12℃。降雨充沛,年降雨量在1100—1200mm之間,但年際差別很大,最大年降水量達(dá)成1583.7mm,最小年降水量?jī)H為674.2mm。月降水量重要集中在5—9月份占全年降雨量的61%,而11月至翌年2月份降雨量較少,僅占全年的9%項(xiàng)目區(qū)常年主導(dǎo)風(fēng)向?yàn)闁|北風(fēng),季風(fēng)較明顯,冬季多為東北風(fēng),夏季則為西南風(fēng),數(shù)年平均風(fēng)速為5.4m/s,主導(dǎo)風(fēng)向的風(fēng)速較大,東北風(fēng)的年平均風(fēng)速均在7.1m/s,最大風(fēng)速為40m/s;每年夏秋兩季是本地區(qū)臺(tái)風(fēng)盛行季節(jié),據(jù)有關(guān)資料記錄,臺(tái)風(fēng)發(fā)生時(shí),其風(fēng)力強(qiáng)度大,連續(xù)時(shí)間長(zhǎng),風(fēng)力一般達(dá)成8~12級(jí),臺(tái)風(fēng)平均連續(xù)天數(shù)為2.5天,最長(zhǎng)連續(xù)時(shí)間為6天。日照充足,熱量資源豐富,數(shù)年平均日照時(shí)數(shù)為2023小時(shí)左右,全年無(wú)霜期達(dá)328天。2.1.項(xiàng)目區(qū)屬南亞熱帶季風(fēng)氣候區(qū),洪澇的起因多為暴雨,暴雨的成因重要有:①太平洋強(qiáng)臺(tái)風(fēng)入侵帶來(lái)的臺(tái)風(fēng)類暴雨,多發(fā)生在6~9月份,暴雨強(qiáng)度大,雨量分布集中,極易引起突發(fā)性洪澇災(zāi)害;②春夏和秋冬交替期間發(fā)生的冷鋒類暴雨。雨量一般不會(huì)很大,但降雨歷時(shí)較長(zhǎng),易發(fā)生突發(fā)性洪澇災(zāi)害。2.2設(shè)計(jì)洪水計(jì)算項(xiàng)目區(qū)降雨充沛,年降雨量在1100—1200mm之間,降水量重要集中在5—9月份,占全年降雨量的61%,暴雨是洪水重要成因,加上太平洋強(qiáng)臺(tái)風(fēng)入侵帶來(lái)的臺(tái)風(fēng)類暴雨,暴雨強(qiáng)度大,雨量分布集中,極易引起突發(fā)性洪澇災(zāi)害;2.2.1設(shè)計(jì)暴雨項(xiàng)目區(qū)附近無(wú)水文站,設(shè)計(jì)暴雨重要參照杜潯溪上游祖媽林水庫(kù)壩頭雨量站及鄰近流域的舊鎮(zhèn)站、漳浦站分析成果,并對(duì)照福建省2023年徑流暴雨查算表,經(jīng)綜合分析后取值,具體見表2-1。表2-1重要雨量站點(diǎn)及資料情況站名時(shí)段(h)暴雨參數(shù)均值(mm)CvCs/Cv漳浦站151.70.43.56101.90.63.524160.780.543.5舊鎮(zhèn)站145.70.423.56106.10.453.524160.60.423.5祖媽林1///6///24199.50.533.5圖集1500.463.56900.553.5241600.53.5東港片位于東南部平原區(qū),其設(shè)計(jì)暴雨相對(duì)較小。綜合取值,東港溪參數(shù)成果見表2-2及表2-3。表2-2東港溪暴雨參數(shù)成果表時(shí)段(h)均值(mm)CvCs/Cv1450.453.561000.553.5241600.53.52-3設(shè)計(jì)暴雨成果表單位:mm歷時(shí)(h)頻率(%)502010140.1597268413417224137.6211.2265.6(1)設(shè)計(jì)暴雨計(jì)算項(xiàng)目區(qū)以上集雨面積為4.62km2,項(xiàng)目區(qū)以上河道全長(zhǎng)4.06km,河道比降1.67‰。本次設(shè)計(jì)洪水計(jì)算采用暴雨推求設(shè)計(jì)洪水的方法。根據(jù)流域特性值和暴雨記錄參數(shù),產(chǎn)流以蓄滿產(chǎn)流的方法計(jì)算,匯流計(jì)算(1)福建推理公式法。福建省推理公式法計(jì)算公式:式中:——設(shè)計(jì)洪峰流量(m3/s);——在全面匯流時(shí)代表相應(yīng)于時(shí)段的最大凈雨在部分匯流代表單一洪峰的最大凈雨,mm;——流域匯流歷時(shí),h;——匯流參數(shù);——沿主河從出口至分水嶺的最長(zhǎng)距離,km;——沿流程L的平均比降;——流域面積,km2。其中:匯流參數(shù)m值采用沿海地區(qū)的計(jì)算公式≥1.5時(shí),;<1.5時(shí),(2)華東地區(qū)特小流域推理公式Ⅱ-3類地區(qū):,設(shè)計(jì)洪水成果見表2-4。表2-4設(shè)計(jì)洪水成果表流域計(jì)算方法各頻率設(shè)計(jì)洪水(m3/s)50%20%10%備注項(xiàng)目區(qū)華東地區(qū)特小流域法13.2724.1232.77參考福建省推理公式法16.3828.8338.71推薦合理性分析:由上表可知,福建省推理公式法和華東地區(qū)特小流域推理公式法推算設(shè)計(jì)洪水成果較為接近。根據(jù)《水利水電工程設(shè)計(jì)洪水計(jì)算規(guī)范》規(guī)定,流域面積在300km2以內(nèi)的可采用推理公式計(jì)算,另?yè)?jù)《福建省暴雨徑流查算圖表》推薦流域面積在200km2以下一般采用推理公式法計(jì)算,本項(xiàng)目流域面積小于200km2,且出于安全考慮,本次工程設(shè)計(jì)洪水成果采用福建省推理公式法。(2)施工期洪水項(xiàng)目區(qū)施工期洪水設(shè)計(jì)成果表見2-5。2-5分期設(shè)計(jì)洪水成果表流域集雨面積(km2)分期各頻率設(shè)計(jì)洪水(m3/s)20%10%項(xiàng)目區(qū)4.6210~3月4.6712.1111~2月1.211.742.3設(shè)計(jì)洪水水面線2.3.1斷面布置根據(jù)最新實(shí)測(cè)斷面,本次河道測(cè)量長(zhǎng)度約為3.5公里,共布設(shè)60個(gè)斷面。2.3.2糙率取值通過(guò)現(xiàn)場(chǎng)查勘現(xiàn)狀河段的河床組成及河道植物生長(zhǎng)情況,對(duì)各河段的糙率取值進(jìn)行合理調(diào)整,通過(guò)對(duì)照《水力計(jì)算手冊(cè)》糙率表分析其糙率,推得糙率0.032~0.035;整治后河床糙率取值范圍為0.028~0.030。2.3.3起始水位選取K3+521斷面作為水面線計(jì)算起始斷面,水位采用曼寧公式計(jì)算,推得起始洪水位,其成果見表2-6。,式中:——過(guò)流量();——河道糙率;——過(guò)洪面積();——水力半徑();——河道坡降。表2-6起始水位成果表P(%)P=50%P=20%P=10%流量(m3/s)16.3828.8338.71水位(m)3.744.354.762.3.4計(jì)算方法洪水水面線采用天然河道恒定非均勻流水面曲線基本方程式計(jì)算,其公式為:Z上+a上V上2/2g=Z下+a下V下2/2g+hf+hj式中:Z上、Z下--上、下游斷面水位(m);V上、V下--上、下游斷面的平均流速(m/s);A上、a下--動(dòng)能改正系數(shù);hf--河段沿程水頭損失(m);hj--河段局部水頭損失(m);其中:hf=Q2△L/R2Q--通過(guò)該河段的流量(m3/s);K--平均流量模數(shù),取上下游斷面流量模數(shù)的幾何平均值,即K=流量模數(shù)K的計(jì)算公式為:K=A--過(guò)水?dāng)嗝婷娣e(m2);X--濕周(m);N--糙率hj=§()§--局部阻力系數(shù)河道行洪時(shí)會(huì)導(dǎo)致橋、閘或陂等涉水建筑物上游水位壅高,其與橋、閘型式及水流條件有關(guān),泄流公式按以下公式進(jìn)行分析計(jì)算:⑴當(dāng)橋面較高時(shí),洪水不漫橋,按寬頂堰淹沒出流公式:試算求得上下游水位落差,式中:σ——淹沒系數(shù),由淹沒系數(shù)表查得;ε——側(cè)收縮系數(shù),按求得;m——流量系數(shù),由流量系數(shù)表查得;B——溢流總凈寬(m);H0——堰上總水頭,;⑵當(dāng)橋面較低,洪水漫橋,橋孔被淹沒成壓力孔流時(shí),孔流按計(jì)算,式中:φ——為過(guò)流系數(shù)ω——為橋下凈面積(m2);V0——為行近流速(m/s),,ω0為橋(閘)天然斷面積;橋面以上部分過(guò)水按寬頂堰自由流公式計(jì)算:式中各參數(shù)含義同上。過(guò)橋總流量:河道行洪時(shí)碰到跌水時(shí),泄流公式按以下公式進(jìn)行分析計(jì)算:試算求得上下游水位落差,式中:ε——側(cè)收縮系數(shù),按m——流量系數(shù),采用m=0.85~0.95B——溢流總凈寬(m);H0——上游總水頭,;2.3.5計(jì)算成果(1)水面線分析根據(jù)分析計(jì)算的設(shè)計(jì)洪峰流量、起始水位以及選定糙率進(jìn)行水面線推求。水面線計(jì)算以斷面資料為依據(jù),若洪水位超過(guò)現(xiàn)有堤岸高程,以堤為界,洪水歸槽考慮推算洪水水面線。采用天然河道恒定非均勻流水面曲線,得到該段的設(shè)計(jì)洪水水面線。(2)水面線計(jì)算成果根據(jù)以上基礎(chǔ)資料和公式計(jì)算,計(jì)算2023一遇、5年一遇和2年一遇洪水水面線。詳見表2-7~2-9。表2-72023一遇水面線計(jì)算成果樁號(hào)清淤前清淤后流量現(xiàn)狀河底高程現(xiàn)狀水位流速過(guò)水面積水面寬度設(shè)計(jì)河底高程設(shè)計(jì)水位流速過(guò)水面積水面寬度(m3/s)(m)(m)(m/s)(m2)(m)(m)(m)(m/s)(m2)(m)038.712.785.771.0343.08202.14.851.3332.882010038.712.825.760.9844.24202.084.831.235.062020038.712.655.741.2237.91202.064.761.9523.2120250Bridge30038.712.75.70.9942.65202.044.681.233.162036138.712.785.70.8148.79202.034.680.9142.6919.0250038.712.45.690.8249.112024.660.9640.662070038.712.815.670.8247.6222.181.964.640.8247.0820.04735Bridge75038.712.285.640.8744.4817.641.954.621.0237.9618.185038.712.55.630.8545.6618.491.934.610.9441.4419.78898Bridge90038.712.575.591.3931.0317.721.924.581.2132.9720110038.712.685.560.9441.8917.351.884.550.9841.0120120038.712.65.541.1933.214.921.864.521.2831.4717.261230Bridge125038.712.685.491.3728.9613.821.854.491.4528.2920150038.712.225.461.2432.2214.261.824.451.3331.44201450Bridge150038.712.695.41.233.0315.271.84.41.2233.6620155038.712.725.41.135.7316.671.794.391.0836.9820165038.712.65.390.8250.121.61.774.390.8247.421.521685Bridge170038.712.845.370.9441.1818.671.764.370.9341.919.39175038.712.395.370.5471.729.151.754.360.5472.7631.11185038.712.665.341.3429.6614.11.734.341.3929.75201890.5Bridge190038.712.845.281.4926.612.831.724.281.624.9620195038.712.775.241.6923.0413.971.714.251.5225.4312.47205038.712.755.181.6623.3912.561.694.211.8720.6710.73215038.712.645.151.2931.4415.751.674.191.2531.0214.83225038.712.575.131.1833.3715.891.654.181.1933.65202300Bridge235038.712.875.051.3628.8215.731.634.131.2431.2320245038.712.45.030.9740.2519.191.614.120.9441.6920.24255038.712.455.020.9341.6919.521.594.110.8844.09202580Bridge260038.712.814.981.1832.9218.681.584.10.9740.0918.89270038.712.094.951.2431.5715.951.564.081.1435.3720280038.712.254.931.0437.4817.41.544.071.0338.4320290038.712.534.911.0837.1719.221.524.050.9341.5818.88300038.712.354.871.4128.1114.571.54.041.2732.5319.21310038.712.414.880.4586.941.121.484.030.39100.6443.52320038.712.294.860.9640.7219.611.464.020.8646.92233212Bridge325038.712.14.781.4327.1614.521.453.971.4227.2613.28330038.712.424.790.7949.6125.221.443.980.6163.8927.47335038.712.144.780.9142.7720.41.433.970.8148.6622345038.7124.770.7254.6824.431.413.970.6561.0429352138.712.24.760.9242.4120.751.43.960.8148.3722表2-85年一遇水面線計(jì)算成果樁號(hào)清淤前清淤后流量現(xiàn)狀河底高程現(xiàn)狀水位流速過(guò)水面積水面寬度設(shè)計(jì)河底高程設(shè)計(jì)水位流速過(guò)水面積水面寬度(m3/s)(m)(m)(m/s)(m2)(m)(m)(m)(m/s)(m2)(m)028.832.785.40.9235.71202.14.441.2724.712010028.832.825.390.8736.88202.084.421.1226.842020028.832.655.371.1330.54202.064.341.9715.1315.82250Bridge30028.832.75.330.8935.22202.044.271.1126.1916.2536128.832.785.330.7141.36202.034.270.8234.9917.6650028.832.45.310.7141.692024.250.8733.2117.0270028.832.815.290.7339.4420.681.964.230.7438.9119.41735Bridge75028.832.285.260.7637.9317.431.954.210.9331.1515.9585028.832.55.250.7538.818.281.934.20.8534.0717.26898Bridge90028.832.575.221.3124.4517.531.924.181.1325.5915.3110028.832.685.190.8235.4517.121.884.150.8832.9519.16120028.832.65.171.0527.7314.51.864.121.1824.5916.861230Bridge125028.832.685.121.2323.8913.311.854.081.3521.3311.79150028.832.225.081.0926.9813.781.824.041.2623.4316.461450Bridge150028.832.695.031.0727.3814.891.841.1325.8216.5155028.832.725.020.9929.5216.41.793.990.9829.3315.52165028.832.65.010.7241.9721.571.773.980.7438.9119.791685Bridge170028.832.844.990.8534.1818.561.763.970.8434.3217.75175028.832.394.990.4860.7428.991.753.970.4860.229.97185028.832.664.961.224.513.631.733.941.2922.2712.291890.5Bridge190028.832.844.921.3222.0912.281.723.891.4819.4811.14195028.832.774.881.618.0313.511.713.881.420.5811.67205028.832.754.81.5318.8111.891.693.811.7416.539.93215028.832.644.771.1825.5415.421.673.791.1425.1914.02225028.832.574.751.0627.3915.571.653.771.126.2714.552300Bridge235028.832.874.661.2722.7515.41.633.721.1425.2414.15245028.832.44.640.8832.7219.051.613.710.8633.6418.06255028.832.454.620.8533.9819.481.593.70.836.0219.162580Bridge260028.832.814.561.1225.6718.571.583.690.8832.7217.6270028.832.094.551.1525.3715.631.563.671.0627.4217.99280028.832.254.530.9530.6417.191.543.660.9430.6816.86290028.832.534.511.0129.5319.151.523.640.8533.9718.13300028.832.354.471.3122.3514.141.53.611.224.9717.74310028.832.414.470.4170.3440.811.483.620.3582.7343.12320028.832.294.460.8932.8719.341.463.610.7937.5421.193212Bridge325028.832.14.381.3521.3814.051.453.561.3122.0112.48330028.832.424.380.7439.3824.951.443.570.5552.7226.93335028.832.144.370.8434.4720.271.433.560.7439.6522345028.8324.360.6544.7324.131.413.560.5949.1429352128.832.24.350.8533.9320.651.43.550.7439.4121.61

表2-92年一遇水面線計(jì)算成果樁號(hào)清淤前清淤后流量現(xiàn)狀河底高程現(xiàn)狀水位流速過(guò)水面積水面寬度設(shè)計(jì)河底高程設(shè)計(jì)水位流速過(guò)水面積水面寬度(m3/s)(m)(m)(m/s)(m2)(m)(m)(m)(m/s)(m2)(m)016.382.784.830.7724.21202.13.811.0915.0610.5110016.382.824.810.7125.37202.083.790.9317.5912.0120016.382.654.791.0218.97202.063.711.729.527.41250Bridge30016.382.74.740.7323.35202.043.640.9317.5712.6136116.382.784.730.5629.5519.042.033.630.6824.1316.5250016.382.44.720.5629.842023.610.7222.815.7470016.382.814.70.5927.5519.521.963.60.6126.9818.14735Bridge75016.382.284.690.5828.0616.751.953.580.7621.4514.7385016.382.54.680.5828.3617.961.933.570.723.5516898Bridge90016.382.574.641.2614.3117.231.923.550.9716.9312.87110016.382.684.60.6425.5316.771.883.520.7322.5115.36120016.382.64.580.8419.4713.841.863.50.9816.6911.841230Bridge125016.382.684.550.9916.5712.531.853.451.1414.4110.55150016.382.224.520.8519.3813.071.823.421.0615.4211.261450Bridge150016.382.694.470.8619.1614.311.83.380.9417.3912.6155016.382.724.460.8120.3715.991.793.370.8220.0814.28165016.382.64.450.5729.7621.521.773.360.6126.9918.551685Bridge170016.382.844.430.6923.8718.41.763.350.6923.7116.5175016.382.394.430.3744.5928.751.753.350.3941.8728.5185016.382.664.410.9617.1812.931.733.341.0815.111.061890.5Bridge190016.382.844.381.0515.6911.461.723.291.2513.089.92195016.382.774.331.4911.0311.651.713.271.1813.8410.45205016.382.754.251.3112.510.671.693.21.5110.878.71215016.382.644.2116.9214.771.673.170.9716.9712.79225016.382.574.170.8818.6115.081.653.150.9217.7213.322300Bridge235016.382.874.11.1414.3514.891.633.110.9716.9512.92245016.382.44.080.7422.1918.21.613.10.7122.9116.85255016.382.454.060.7123.0119.421.593.090.6724.617.932580Bridge260016.382.8141.0715.3717.811.583.060.7422.2816.36270016.382.093.980.9916.5215.171.563.060.8918.3713.7280016.382.253.950.7920.7416.891.543.040.7920.8415.39290016.382.533.920.9218.3618.51.523.030.7123.216.89300016.382.353.871.1714.0613.511.531.0315.8812.04310016.382.413.870.3645.839.921.483.010.2957.0338.99320016.382.293.850.7721.2618.941.4630.6525.0217.833212Bridge325016.382.13.791.2113.4912.381.452.951.1114.7911.3330016.382.423.780.6724.5324.221.442.960.4536.6325.67335016.382.143.770.7422.2720.091.432.950.6127.0319.27345016.3823.760.5430.2123.671.412.950.4933.3423.15352116.382.23.740.7721.3820.451.42.940.627.0819.163.地質(zhì)3.1工程概況本項(xiàng)目區(qū)位于漳浦縣霞美鎮(zhèn)前梧村,漳浦縣位于福建東南部、漳州市南部,北緯23°43’~24°21’,東經(jīng)117°24’~118°02’。北與龍海市毗鄰,西鄰云霄縣和平和縣,縣城距漳州霞美鎮(zhèn)東臨臺(tái)灣海峽,近海毗連浮頭灣、后江港、舊鎮(zhèn)港,隔舊鎮(zhèn)港與六鰲半島相望,西與杜潯鎮(zhèn)接壤,南與下蔡林場(chǎng)毗鄰,北與舊鎮(zhèn)鎮(zhèn)交界,鎮(zhèn)政府所在地霞美村西北距漳浦縣城20公里。前梧村位于霞美鎮(zhèn)南部,東鄰后寮村,西鄰塔嶺村,北鄰山嶺村,南鄰下蔡林場(chǎng)。東港溪流發(fā)源于后寮山流經(jīng)前梧村南,至杜潯鎮(zhèn)北坂村葛仔社過(guò)四口斗門,匯入東山灣海域。3.2區(qū)域地質(zhì)情況項(xiàng)目區(qū)區(qū)域地貌屬河流沖積平原地貌,沖溝較發(fā)育,坡度多為緩坡,地表植被發(fā)育,水系多呈網(wǎng)格狀,樹枝狀。溝谷多呈“U”字型,河段略有彎曲,河床較平直,狹窄,屬微彎型河床,河床中邊灘犬牙交錯(cuò)分布。地層重要為侏羅系上統(tǒng)南園組花崗巖及第四系地層組成。第四系地層重要為填土層、沖洪積層、殘坡積層,重要分布于沖溝、河床等地勢(shì)低洼處?;鶐r重要為各種不同風(fēng)化限度的花崗巖。根據(jù)福建《區(qū)域地質(zhì)調(diào)查報(bào)告》,區(qū)域構(gòu)造以斷裂為主,褶皺次之。斷裂重要有北東向、北西向兩組斷裂。發(fā)育較早的北東向斷裂,貫穿全區(qū),力學(xué)性質(zhì)為張性。晚期形成的北西向斷裂,規(guī)模較大,以張扭性斷裂為主。工程區(qū)所在區(qū)域地質(zhì)構(gòu)造位于新華夏構(gòu)造體系的長(zhǎng)樂(lè)-南澳斷裂帶的第二帶之上,由一系列呈NE走向且多期次的斷裂破碎帶、變質(zhì)帶、巖體、脈巖侵入帶等構(gòu)成。在第四紀(jì)重要表現(xiàn)為差異性斷塊升降運(yùn)動(dòng)的特性,自晚更新世以來(lái)處在相對(duì)穩(wěn)定狀態(tài),從第四紀(jì)構(gòu)造運(yùn)動(dòng)、地震活動(dòng)及現(xiàn)代地殼垂直變形等綜合分析區(qū)域地殼穩(wěn)定性,總體來(lái)看可以認(rèn)為本區(qū)域構(gòu)造屬相對(duì)穩(wěn)定階段。3.3巖土結(jié)構(gòu)特性性根據(jù)東港溪地質(zhì)野外鉆探所揭露、結(jié)合原位測(cè)試與室內(nèi)土工實(shí)驗(yàn)成果,場(chǎng)地在勘探深度范圍內(nèi)重要巖土層為:素填土①、粉質(zhì)粘土②、殘積砂質(zhì)粘性土③。各巖土層特性現(xiàn)自上而下分述如下:⒈素填土①:灰黃、灰褐,松散,稍濕。重要由新近回填的粘性土組成,含少量的碎石等,回填年限為3~5年左右。本層全場(chǎng)部分地段有分布,層厚0.70~1.80m。該層為未壓實(shí)解決及欠固結(jié),均勻性較差,工程性能差。⒉粉質(zhì)粘土②:灰黃、灰白色,可塑,濕。重要由粘粒、粉粒組成,含少量中粗砂,干強(qiáng)度中檔,韌性中檔,切面粗糙,無(wú)搖振反映,沖洪積成因。本層全場(chǎng)大部分地段有分布,頂板埋深為0.70~1.80m,層厚8.10~12.90m。現(xiàn)場(chǎng)標(biāo)貫修正擊數(shù)6.6~11.1,標(biāo)準(zhǔn)值N’=8.3擊,均勻性較差,工程性能一般。⒊殘積砂質(zhì)粘性土③:灰白色、灰黃色,可塑~硬塑,濕。長(zhǎng)石已所有高嶺土化,重要成分為粘土礦物、石英及含少量的云母碎片,具有遇水易軟化及崩塌的特性,干強(qiáng)度中檔,韌性低,切面粗糙,無(wú)搖振反映,由花崗巖風(fēng)化殘積而成。本層全場(chǎng)部分地段有分布,頂板埋深為8.80~12.60m,層厚2.30~9.50m。現(xiàn)場(chǎng)標(biāo)貫修正擊數(shù)13.1~19.7,標(biāo)準(zhǔn)值N’=15.2擊,均勻性差,工程性能中檔。3.3地質(zhì)構(gòu)造與地震依據(jù)《中國(guó)地震動(dòng)參數(shù)區(qū)劃圖》(GB18306-2023)和《中國(guó)地震動(dòng)峰值加速度區(qū)劃圖》福建省區(qū)劃一覽表及閩建設(shè)[2023]37號(hào)文和[2023]10號(hào)文,工程區(qū)內(nèi)屬抗震設(shè)防烈度7度區(qū),地震動(dòng)峰值加速度為0.10g,地震動(dòng)反映譜特性周期為0.40s。3.4結(jié)論與建議本場(chǎng)地內(nèi)無(wú)活動(dòng)性區(qū)域斷裂存在,亦無(wú)明顯斷裂構(gòu)造形跡,區(qū)域地質(zhì)構(gòu)造較穩(wěn)定。4.工程任務(wù)和規(guī)模4.1工程概況本項(xiàng)目區(qū)位于漳浦縣霞美鎮(zhèn)前梧村,漳浦縣位于福建東南部、漳州市南部,北緯23°43’~24°21’,東經(jīng)117°24’~118°02’。北與龍海市毗鄰,西鄰云霄縣和平和縣,縣城距漳州霞美鎮(zhèn)東臨臺(tái)灣海峽,近海毗連浮頭灣、后江港、舊鎮(zhèn)港,隔舊鎮(zhèn)港與六鰲半島相望,西與杜潯鎮(zhèn)接壤,南與下蔡林場(chǎng)毗鄰,北與舊鎮(zhèn)鎮(zhèn)交界,鎮(zhèn)政府所在地霞美村西北距漳浦縣城20公里。前梧村位于霞美鎮(zhèn)南部,東鄰后寮村,西鄰塔嶺村,北鄰山嶺村,南鄰下蔡林場(chǎng)。東港溪流發(fā)源于后寮山流經(jīng)前梧村南,至杜潯鎮(zhèn)北坂村葛仔社過(guò)四口斗門,匯入東山灣海域。4.2工程現(xiàn)狀東港溪部分河道淤積,河道沿線多處長(zhǎng)滿水葫蘆,過(guò)水?dāng)嗝嫫?,排水不暢,排澇?biāo)準(zhǔn)偏低,同時(shí),受到沿途修建了許多橋梁的阻礙,加上受外海潮水頂托,影響洪水的排泄,導(dǎo)致兩岸農(nóng)田嚴(yán)重澇水,威脅兩岸居民的生產(chǎn)和生活的安全,每年洪水期均存在不同限度的內(nèi)澇現(xiàn)象,嚴(yán)重影響群眾生產(chǎn)生活。4.3工程規(guī)劃本次東港溪河道治理段現(xiàn)狀寬度10~15m,根據(jù)古雷港經(jīng)濟(jì)開發(fā)區(qū)防洪排澇規(guī)劃可知本次清淤河道規(guī)劃為東港片區(qū),防洪排澇標(biāo)準(zhǔn)采用二十年一遇,規(guī)劃河道寬度為18~30m,二十年一遇的設(shè)計(jì)澇水位為5.10~4.40,規(guī)劃渠頂高程為5.60m~4.90m。由于本次項(xiàng)目資金有限及古雷港經(jīng)濟(jì)開發(fā)區(qū)防洪排澇規(guī)劃為城區(qū)遠(yuǎn)期規(guī)劃,而本次項(xiàng)目的實(shí)行重要為緩解當(dāng)前東港溪沿線耕地內(nèi)澇的應(yīng)急工程。為了盡也許與古雷相關(guān)規(guī)劃形成統(tǒng)一的防洪排澇體系,本項(xiàng)目河段的河道設(shè)計(jì)河底高程采用規(guī)劃河底高程??紤]到項(xiàng)目資金及征地問(wèn)題,清淤岸線采用原有河道岸線,防洪排澇標(biāo)準(zhǔn)采用五年一遇。本次項(xiàng)目的實(shí)行僅緩解工程建設(shè)段河道沿線內(nèi)澇,建議業(yè)主盡快按規(guī)劃對(duì)東港溪進(jìn)行全面的綜合整治,拓寬河道、建設(shè)防洪堤、排澇閘等排澇措施。4.4項(xiàng)目建設(shè)可行性分析(1)項(xiàng)目區(qū)群眾迫切需求,霞美鎮(zhèn)政府重視東港河道泥沙淤積嚴(yán)重,河道沿線多處長(zhǎng)滿水葫蘆,過(guò)水?dāng)嗝嫫。瑹o(wú)法泄洪,每年的水害,嚴(yán)重地制約了本地的工農(nóng)業(yè)生產(chǎn),制約了本地的經(jīng)濟(jì)連續(xù)、快速、健康發(fā)展。項(xiàng)目區(qū)人民群眾急切規(guī)定恢復(fù)河道防洪排澇作用,群眾實(shí)行項(xiàng)目積極性高。霞美鎮(zhèn)政府領(lǐng)導(dǎo)高度重視,經(jīng)常下基層進(jìn)行實(shí)地踏勘,積極向上級(jí)反映實(shí)情,爭(zhēng)取項(xiàng)目建設(shè)資金,完善東港防洪排澇功能。(2)場(chǎng)外交通項(xiàng)目區(qū)通過(guò)農(nóng)村水泥路面連接X201縣道,場(chǎng)內(nèi)外交通便利,渠道兩岸無(wú)需征地及臨時(shí)用地,原有道路可讓工程車清淤進(jìn)行作業(yè)。(3)技術(shù)有保障漳浦縣霞美鎮(zhèn)有一批長(zhǎng)期從事工程管理人員、水利技術(shù)人員,有豐富的工程建設(shè)、運(yùn)營(yíng)管理等方面的經(jīng)驗(yàn),技術(shù)力量強(qiáng),完全有能力為本項(xiàng)目的實(shí)行提供可靠技術(shù)保障。綜上所述,通過(guò)河道清淤整治,恢復(fù)河道防洪排澇功能,減少洪水給本地導(dǎo)致的損失,提高項(xiàng)目區(qū)防洪排澇能力。項(xiàng)目的實(shí)行是可行的。4.5建設(shè)任務(wù)根據(jù)建設(shè)單位的意見及提供的相關(guān)文獻(xiàn),本次項(xiàng)目的實(shí)行重要對(duì)霞美東港溪進(jìn)行清淤疏浚。重要任務(wù)如下:(1)清淤河道總長(zhǎng)3.521km;(2)打撈沿線水葫蘆25210m2,外運(yùn)2km。5.工程布置及建筑物5.1設(shè)計(jì)依據(jù)與標(biāo)準(zhǔn)5.1.1洪水標(biāo)準(zhǔn)與建筑物級(jí)別根據(jù)國(guó)家標(biāo)準(zhǔn)《防洪標(biāo)準(zhǔn)》(GB50201-2023)及《堤防工程設(shè)計(jì)規(guī)范》(GB50286-2023),規(guī)定本次項(xiàng)目防洪標(biāo)準(zhǔn)為5年一遇洪水設(shè)計(jì),建筑物等級(jí)為V等,55。5.1.2設(shè)計(jì)依據(jù)(1)《防洪標(biāo)準(zhǔn)》(GB50201-2023);(2)《水利水電工程等級(jí)劃分及洪水標(biāo)準(zhǔn)》(SL252-2023);(3)《水利水電工程初步設(shè)計(jì)報(bào)告編制規(guī)程》(SL619-2023)(4)《堤防工程設(shè)計(jì)規(guī)范》(GB50286-2023);(5)《水利水電工程工程量計(jì)算規(guī)范》(DL/T5088-2023);(6)《水工建筑物荷載設(shè)計(jì)規(guī)范》DL5071-1997;5.2工程總布置本工程起點(diǎn)位于霞美鎮(zhèn)前梧村東港溪河道(K0+000),終點(diǎn)毗鄰霞美鎮(zhèn)和杜潯鎮(zhèn)分界(K3+521)。項(xiàng)目所涉及防護(hù)區(qū)重要是東港溪沿線農(nóng)田,河道清淤樁號(hào)范圍為K0+000~K3+521,清淤總長(zhǎng)3.521km。并打撈河道沿線水葫蘆25210m2,通過(guò)本次清淤工程的實(shí)行,將有助于提高防洪排澇能力,有助于減少澇水給本地導(dǎo)致的損失。5.2(1)岸線布置岸線布置的原則如下:1)根據(jù)河流的水文地形、地質(zhì)條件及現(xiàn)有河岸的穩(wěn)定情況,選取河槽寬度和平面形態(tài)既能滿足行洪規(guī)定,符合河床演變規(guī)律,又能節(jié)省工程投資的最佳岸線。2)選取的岸線應(yīng)順從河岸,力求平順,使堤岸走向盡量符合洪水主流向,并兼顧中、枯水流向,以減少?zèng)_刷和淤積。3)岸線選擇地勢(shì)較高,地基工程地質(zhì)情況較好、比較穩(wěn)定的灘岸,盡也許運(yùn)用現(xiàn)有堤岸和有利地形,沿河修建的建筑群與岸線保持一定間距,盡量做到路堤結(jié)合,以便管理養(yǎng)護(hù)和抗洪搶險(xiǎn)。4)岸線布置要與現(xiàn)有堤岸平順銜接,形成完善的防洪系統(tǒng)。本次東港溪河道治理段現(xiàn)狀寬度10~15m,根據(jù)古雷港經(jīng)濟(jì)開發(fā)區(qū)防洪排澇規(guī)劃可知本次清淤河道規(guī)劃為東港片區(qū),防洪排澇標(biāo)準(zhǔn)采用二十年一遇,規(guī)劃河道寬度為18~30m,二十年一遇的設(shè)計(jì)澇水位為5.10~4.40,規(guī)劃渠頂高程為5.60m~4.90m。限于投資,本次河道清淤工程不涉及防洪堤的加固擴(kuò)建,僅做清淤解決,清淤岸線采用現(xiàn)有岸線,走向不變,河道寬度保持不變。(2)清淤設(shè)計(jì)本工程起點(diǎn)位于霞美鎮(zhèn)前梧村東港溪河道(K0+000),終點(diǎn)毗鄰霞美鎮(zhèn)和杜潯鎮(zhèn)分界(K3+521)。項(xiàng)目所涉及防護(hù)區(qū)重要是東港溪沿線農(nóng)田,河道清淤樁號(hào)范圍為K0+000~K3+521,清淤總長(zhǎng)3.521km。為了盡也許與古雷相關(guān)規(guī)劃形成統(tǒng)一的防洪排澇體系,本項(xiàng)目河段的河道設(shè)計(jì)河底高程采用《福建漳州古雷港口經(jīng)濟(jì)區(qū)防洪防潮排澇專項(xiàng)規(guī)劃報(bào)告》設(shè)計(jì)河底高程。起點(diǎn)K0+000設(shè)計(jì)河底高程為2.10,終點(diǎn)K3+521設(shè)計(jì)河底高程為1.40,設(shè)計(jì)坡降0.0002。本次清淤岸線采用沿原有河道岸線布置,并以1:1.0的清淤邊坡開挖至設(shè)計(jì)河底高程,不涉及征地。清淤工程量詳見表5-1。限于投資,現(xiàn)階段建設(shè)過(guò)程中,局部建設(shè)段清淤后岸頂高度不夠,可依據(jù)現(xiàn)場(chǎng)地形運(yùn)用清淤土方就地培厚兩岸岸頂。遠(yuǎn)期建設(shè)按相關(guān)規(guī)劃實(shí)行。(3)清障設(shè)計(jì)經(jīng)現(xiàn)場(chǎng)踏勘,本工程下游K2+000~K3+521水葫蘆淤積比較嚴(yán)重,幾乎鋪滿整個(gè)河道,寬度為9~15m不等,K0+000~K2+000為零散的局部淤積,寬度為2~9m不等。本項(xiàng)目清障及整治內(nèi)容為河道堆積的水葫蘆及農(nóng)產(chǎn)品殘留物等,清障面積25210m2,按淤積厚度0.2m計(jì)算,清障方量為5042m3。清淤的淤泥、農(nóng)產(chǎn)品殘留物用于農(nóng)田堆肥、清淤的土方可依據(jù)現(xiàn)場(chǎng)地形就地培厚兩岸和填補(bǔ)低洼地塊或運(yùn)往村委會(huì)指定地點(diǎn)進(jìn)行堆放。

表5-1清淤工程量計(jì)算表里程橫斷面(m2)平均(m2)距離(m)總數(shù)量K0+0008.216.2650.00313.00K0+0504.316.8850.00343.75K0+1009.447.8450.00391.75K0+1506.235.4850.00273.75K0+2004.727.1350.00356.50K0+2509.5410.2350.00511.25K0+30010.918.2050.00409.75K0+3505.487.5150.00375.50K0+4009.5412.6550.00632.50K0+45015.7613.8750.00693.25K0+50011.9711.1450.00557.00K0+55010.3110.9650.00547.75K0+60011.6011.5850.00579.00K0+65011.5616.3650.00818.00K0+70021.1615.9450.00796.75K0+75010.7112.5250.00626.00K0+80014.3314.2550.00712.50K0+85014.1715.0750.00753.25K0+90015.9614.4550.00722.50K0+95012.9412.0850.00604.00K1+00011.2213.4150.00670.25K1+05015.5915.0950.00754.25K1+10014.5812.9450.00647.00K1+15011.3011.2750.00563.50K1+20011.2410.8550.00542.50K1+25010.469.4250.00470.75K1+3008.378.1850.00408.75K1+3507.988.7650.00437.75K1+4009.539.6950.00484.25K1+4509.8411.4350.00571.25K1+50013.0114.6450.00732.00K1+55016.2715.2650.00762.75K1+60014.2416.5550.00827.25K1+65018.8518.6550.00932.50K1+70018.4523.3450.001166.75K1+75028.2219.7550.00987.25K1+80011.2711.1650.00557.75K1+85011.0410.4350.00521.50K1+9009.8212.6550.00632.25K1+95015.4714.6250.00731.00K2+00013.7711.2050.00559.75K2+0508.6214.4550.00722.25K2+10020.2717.2750.00863.50K2+15014.2714.2450.00711.75K2+20014.2013.9750.00698.50K2+25013.7413.7050.00685.00K2+30013.6615.0150.00750.25K2+35016.3515.8950.00794.50K2+40015.4316.7550.00837.25K2+45018.0618.7750.00938.50K2+50019.4819.6750.00983.25K2+55019.8521.6350.001081.25K2+60023.4021.9750.001098.25K2+65020.5317.7750.00888.50K2+70015.0115.4450.00771.75K2+75015.8615.3950.00769.50K2+80014.9214.3050.00715.00K2+85013.6817.2150.00860.50K2+90020.7418.4750.00923.50K2+95016.2014.4850.00724.00K3+00012.7610.6850.00534.00K3+0508.6026.8650.001342.75K3+10045.1133.0650.001653.00K3+15021.0120.2650.001013.00K3+20019.5115.4350.00771.25K3+25011.3421.9750.001098.25K3+30032.5926.8350.001341.25K3+35021.0633.6550.001682.25K3+40046.2333.7650.001688.00K3+45021.2923.5350.001176.50K3+50025.7723.7321.00498.23K3+52121.68合計(jì)3521.0053594.236.施工組織設(shè)計(jì)6.1施工條件本次工程所在區(qū)域?qū)倌蟻啛釒ШQ笮约撅L(fēng)氣候。氣候溫暖,光照充足,冬無(wú)嚴(yán)寒,夏無(wú)酷暑。項(xiàng)目區(qū)數(shù)年平均氣溫20.8℃,極端最高氣溫36.6℃,極端最低氣溫3.8℃;全年最熱為6、7、8三個(gè)月,月平均氣溫28℃,最冷為12、1、2三個(gè)月,月平均氣溫12℃。降雨充沛,年降雨量在1100—1200mm之間,但年際差別很大,最大年降水量達(dá)成1583.7mm項(xiàng)目區(qū)常年主導(dǎo)風(fēng)向?yàn)闁|北風(fēng),季風(fēng)較明顯,冬季多為東北風(fēng),夏季則為西南風(fēng),數(shù)年平均風(fēng)速為5.4m/s,主導(dǎo)風(fēng)向的風(fēng)速較大,東北風(fēng)的年平均風(fēng)速均在7.1m/s,最大風(fēng)速為40m/s;每年夏秋兩季是本地區(qū)臺(tái)風(fēng)盛行季節(jié),據(jù)有關(guān)資料記錄,臺(tái)風(fēng)發(fā)生時(shí),其風(fēng)力強(qiáng)度大,連續(xù)時(shí)間長(zhǎng),風(fēng)力一般達(dá)成8~12級(jí),實(shí)測(cè)瞬時(shí)風(fēng)速可大于40m/s,臺(tái)風(fēng)平均連續(xù)天數(shù)為2.5天,最長(zhǎng)連續(xù)時(shí)間為6天。日照充足,熱量資源豐富,數(shù)年平均日照時(shí)數(shù)為2023小時(shí)左右,全年無(wú)霜期達(dá)328天。工程所需外來(lái)物資可經(jīng)現(xiàn)有混凝土道路運(yùn)送至工程區(qū)。施工用電可接附近后周村電網(wǎng)。施工用水可直接抽取東港溪水,其它生活物資分別從霞美鎮(zhèn)購(gòu)買供應(yīng)。工程清淤后泥沙外運(yùn)2km,如附近有農(nóng)田需求也可運(yùn)至農(nóng)田地塊,但距離不超過(guò)2km。6.2施工導(dǎo)流6.根據(jù)國(guó)家《防洪標(biāo)準(zhǔn)》GB50201-2023及《水利水電工程施工組織設(shè)計(jì)規(guī)范》規(guī)定,建設(shè)工程的導(dǎo)流建筑物級(jí)別為5級(jí),本工程起點(diǎn)位于霞美鎮(zhèn)前梧村東港溪河道(K0+000),終點(diǎn)毗鄰霞美鎮(zhèn)和杜潯鎮(zhèn)分界(K3+521)。施工圍堰用于淤積較為嚴(yán)重的河段,攔蓄河水,便于挖泥船航行。圍堰在清除淤泥后,應(yīng)立即拆除,不能影響行洪。施工期碰到暴雨,應(yīng)及時(shí)拆除圍堰。6.本次工程根據(jù)工程布置及工期安排,施工后及時(shí)拆除圍堰,僅需進(jìn)行短期圍堵,無(wú)需進(jìn)行專門的施工導(dǎo)流。6.3施工條件6.3.1場(chǎng)內(nèi)外交通本次工程位于省道S207及縣道X201旁,同時(shí)可結(jié)合水運(yùn)將設(shè)備運(yùn)送進(jìn)場(chǎng),交通較為便利。6.3.2施工用水、用電及材料供應(yīng)本工程施工用水量較小,生產(chǎn)用水可就近抽取河水,生活用水采用河流沿岸村莊的水源。施工用電由于負(fù)荷較小,擬采用汽油發(fā)電機(jī)現(xiàn)場(chǎng)發(fā)電。施工通訊,現(xiàn)有電信網(wǎng)絡(luò)發(fā)達(dá),交通便利,可以滿足工程施工指揮調(diào)度規(guī)定。6.4施工總體布置工程建設(shè)任務(wù)如下:(1)清淤河道總長(zhǎng)3.521km;(2)打撈沿線水葫蘆25210m2,外運(yùn)2km。根據(jù)項(xiàng)目、條件及工程量。本工程計(jì)劃施工總工期為3個(gè)月。6.3.1清障除雜清除河床淤泥前,一方面對(duì)河道開挖邊線范圍內(nèi)的植被、建筑垃圾及其他雜物進(jìn)行清理。清理工作擬采用人工與挖掘機(jī)配合進(jìn)行。對(duì)水葫蘆及蘆葦根、樹根等則由裝載機(jī)挖裝水葫蘆,采用1.5m3自卸汽車運(yùn)送裝載機(jī)運(yùn)至業(yè)主指定地點(diǎn)堆放或掩埋。6.3.2河床清淤河道清淤采用挖泥船航行清淤,局部河段依據(jù)現(xiàn)場(chǎng)條件可調(diào)配挖掘機(jī)進(jìn)行開挖清淤。同時(shí)采用人工開挖清淤。清理工作擬采用人工與機(jī)械開挖配合進(jìn)行。淤積較為嚴(yán)重的河段采用編織袋裝土設(shè)立施工圍堰,攔蓄河水,便于挖泥船航行。圍堰在清除淤泥后,應(yīng)立即拆除,不能影響行洪。7.

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論