版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
專(zhuān)用
人人文庫(kù)
NATIONALSTANDARD
OFTHEPEOPLESREPUBLICOFCHINA
CodeforAcceptanceofMineralProcessing
EquipmentInstallationEngineering
GB50377-2006
ChiefDevelopmentDepartment:ChinaMetallurgicalConstructionAssociation
ApprovalDepartment:MinistryofConstructionofthePeoplesRepublicofChina
ImplementationDate:February1,2007
專(zhuān)用
人人文庫(kù)
ChinaPlanningPress
Beijing2015
圖書(shū)在版編目(CIP)數(shù)據(jù)
選礦機(jī)械設(shè)備工程安裝驗(yàn)收規(guī)范英文中國(guó)冶金建設(shè)
GB50377-2006:/
協(xié)會(huì)組織編譯北京中國(guó)計(jì)劃出版社
.—:,2015.12
ISBN978-7-5182-0299-7
中選礦機(jī)械機(jī)械設(shè)備設(shè)備安裝工程驗(yàn)收技
Ⅰ.①G…Ⅱ.①…Ⅲ.①----
術(shù)規(guī)范中國(guó)英文
--Ⅳ.①TD45-65
中國(guó)版本圖書(shū)館數(shù)據(jù)核字第號(hào)
CIP(2015)266852
ChineseeditionfirstpublishedinthePeoplesRepublicofChinain2006
EnglisheditionfirstpublishedinthePeoplesRepublicofChinain2015
byChinaPlanningPress
rd專(zhuān)用
3Floor,CTower,GuohongBuilding
No.A11,Muxidi-Beili,XichengDistrict
Beijing,100038
PrintedinChinabyBeijingJinghuaHucaisPrintingCO.,LTD
?2006byMinistryofConstructionof
thePeoplesRepublicofChina
Allrightsreserved.Nopartofthispublicationmaybereproducedortransmittedinanyformor
byanymea人人文庫(kù)ns,graphic,electronic,ormechanical,includingphotocopying,recording,
oranyinformationstorageandretrievalsystems,withoutwrittenpermissionofthepublisher.
Thisbookissoldsubjecttotheconditionthatitshallnot,bywayoftradeorotherwise,belent,
resold,hiredoutorotherwisecirculatedwithoutthepublisherspriorconsentinanyformof
blindingorcoverotherthanthatinwhichthisispublishedandwithoutasimilarcondition
includingthisconditionbeingimposedonthesubsequentpurchaser.
ISBN978-7-5182-0299-7
AnnouncementoftheMinistryof
ConstructionofthePeoplesRepublicofChina
No.475
AnnouncementonPublishingtheNationalStandardof
CodeforAcceptanceofMineralProcessingEquipmentInstallation
Engineering
bytheMinistryofConstruction
CodeforAcceptanceofMineralProcessingEquipmentInstallationEngineering
hasbeen
approvedasanationalstandardwithaserialnumberofGB50377-2006andwillbeimplemented
onFeb.1,2007.Articles2.0.4and2.0.14inthiscodearemandatoryonesandmustbe
implementedstrictly.
AuthorizedbytheStandardRatingInstituteoftheMinistryofConstruction,thiscodeis
publishedanddistributedbytheChinaPlanningPress.專(zhuān)用
TheMinistryofConstructionofthePeoplesRepublicofChina
August24,2006
人人文庫(kù)
Foreword
ThiscodewasdevelopedbyChinaThirdMetallurgicalGroupCo.,Ltd.andotherrelevant
organizationsaccordingtotherequirementsofDocumentJIANBIAOHAN[2005]No.124issuedby
NoticeonPrintingandDistributingtheDevelopmentand
MinistryofConstruction(MOC)-
RevisionPlanthendbatchofNationalEngineeringConstructionStandardsin
(2)2005.
Thecodedevelopmentgroupcheckedandfinalizedthiscodeafterreferencetocurrentrelevant
nationallawsandregulationsandstandards,andbyconductinginvestigationandresearch,
summarizingthepastexperienceinrelationtoqualityacceptanceofmineralprocessingequipment
installationengineering,discussingandmodifyingtheprovisionsrepeatedly,andwidelysoliciting
opinionsfromrelatedorganizationsandexperts.
Thecodeconsistsof8chapters,coveringGeneralrequirement,Basicrequirement,Equipment
foundation,AnchorboltsandBaseplate,Equipmentandmaterialapproach,Feedingandore
drawingequipment,Crushing,grindingandsievingequipment,Classifyingandsortingequipment,
andDewateringequipmentand5appendixes.Chapters5to8aredivisionalworksinmineral
,專(zhuān)用,
processingequipmentinstallationengineeringChapter3Equipmentfoundationanchorboltsand
baseplateandChapter4Equipmentandmaterialapproacharesetoutseparatelyasthecontents
thereinrelatetoconstituentworksandarethegeneralqualitycontrolelementsforeachconstituent
works.
Theprovisionprintedinboldtypearecompulsoryonesandmustbeenforcedstrictly.
Thiscodemaybesubjecttopartialrevisioninthefuture,andtheinformationaboutthe
revisionaswellastherevisedcontentswillbepublishedinrelevantjournal.
Thiscodeisunderthejurisdictionof,anditsmandatoryprovisionsareinterpretedbythe
MinistryofConstruction,whereasChinaThirdMetallurgicalConstructionCorp.isinchargeofthe
explanationoftechnicalspecifications.Allrelevantorganizationsarekindlyinvitedtosummarize
andaccumulateactualexperienceswhenimplementingthiscode.Relevantcommentsand
recommendations,whenevernecessary,shouldbesubmittedtotheTechnicalQualityDepartmentof
ChinaThirdMetallurgicalGroupCo.,Ltd(Address:No139,DongjianStreet,LishanDistrict,
AnshanCity,LiaoningProvince.Zipcode:114039,E-mail:hezhijiang2005@163.com,Fax:
ChiefDevelopmentOrganization,ParticipatingDevelopmentOrganizationsandChiefDrafting
Staff:
ChiefDevelomentOranization
pg:
ChinaThirdMetallurgicalConstructionCorp.
ParticiatinDevelomentOranizations
pgpg:
ShanghaiBaoyeConstructionCo.
Ltd.,ChinaMCC20GroupCorp.Ltd.
ChiefDraftinStaff
g:
WangQiangCuiHuichuanXieFuchunGuanTiexingSunXiuxia
Contents
……………
1GeneralProvisions(1)
……………
2BasicRequirement(2)
………
3EquipmentFoundation,AnchorBoltandBasePlate(5)
…………
3.1GeneralRequirement(5)
…………
3.2EquipmentFoundation(5)
…………………
3.3AnchorBolts(6)
……………………
3.4BasePlate(6)
…………
4EquipmentandMaterialApproach(7)
…………
4.1GeneralRequirement(7)
……………………
4.2Equipment(7)
………………………
4.3Material(7)
………
5FeedingandOreDrawingEquipment(8)
…………
5.1GeneralRequirement(8)
…………………
5.2InstallationofTramcarDumer專(zhuān)用
p(8)
………………
5.3InstallationofPlate-TypeFeeder(9)
…………………
5.4InstallationofElectromagneticVibrationFeeder(10)
……………………
5.5InstallationofDiskFeeder(11)
……………………
5.6InstallationofChuteFeeder(11)
………
5.7InstallationofChainandPendulumFeeders(12)
………………
5.8InstallationofOreDrawingGate(12)
………………
5.9TestRunofFeedingandOreDrawingEquipment(12)
…………………
6Crushing,GrindingandSievingEquipment(14)
…………
6.1GeneralRequirement(14)
……………………
6.2InstallationofJawCrusher(14)
……………………
6.3InstallationofCycleCrusher(15)
……………………
6.4InstallationofTaperCrusher(15)
…………
6.5InstallationofOreMill(18)
…………………
6.6Installationof人人文庫(kù)VibrationSieve(20)
……………
6.7TestRunofCrushing,GrindingandSievingEquipment(21)
…………
7ClassifyingandSortingEquipment(23)
…………
7.1GeneralRequirement(23)
…………………
7.2InstallationofSpiralClassifier(23)
……………………
7.3InstallationofHydrocyclone(24)
………………………
7.4InstallationofFineSieve(24)
……………………
7.5InstallationofBarrel-TypeMagneticSeparator(25)
……………………
7.6InstallationofTurnCageMagneticSeparator(26)
……………………
7.7InstallationofRing-TypeMagneticSeparator(27)
·1·
………
7.8InstallationofMagneticDewateringTank(29)
…………
7.9InstallationofFlotator(29)
…………
7.10InstallationofJigger(30)
………………………
7.11InstallationofSwingBed(31)
…………
7.12InstallationofCentrifugalConcentrator(31)
…………………
7.13InstallationofHeavy-MediumVibratoryChute(32)
………………
7.14InstallationofSpiralConcentrator(33)
…………………
7.15TestRunofClassifyingandSortingEquipment(33)
………………………
8DewateringEquipment(36)
…………
8.1GeneralRequirement(36)
……………………
8.2InstallationofCenterDrive-TypeConcentrator(36)
…………………
8.3InstallationofCircumDrive-TypeConcentrator(36)
………………
8.4InstallationofFeedingChuteFrameofConcentrator(38)
……………
8.5InstallationofTubeInternalFilteringVacuumFilter(38)
…………………
8.6InstallationofExternalFilteringVacuumFilter(40)
……………
8.7TestRunofDewateringEquipment(42)
AppendixAQualityAcceptanceRecordTablefor
…………
ConstituentWorksofMineralProcessingEquipmentI專(zhuān)用nstallation(44)
AppendixBQualityAcceptanceRecordTablefor
……………
DivisionalWorksofMineralProcessingEquipmentInstallation(45)
AppendixCQualityAcceptanceRecordTablefor
……………
MineralProcessingEquipmentInstallationWorks(46)
AppendixDMineralProcessingEquipment
………………
No-LoadTestRunRecordTable(47)
………
AppendixEAppearanceQualityAcceptanceRecordforUnitWorks(48)
…………
ExplanationofWordingInThisCode(49)
……………
Addition:ExplanationsofProvisions(51)
人人文庫(kù)
·2·
1GeneralProvisions
1.0.1
Thiscodeispreparedwithaviewtoenhancethequalitymanagementofmineralprocessing
equipmentinstallationengineering,carryoutuniformlytheacceptanceofmineralprocessing
equipmentinstallationengineeringandguaranteetheengineeringquality.
1.0.2
Thiscodeisapplicabletotheinstallationqualityacceptanceoforefeedinganddrawing
equipment,crushing,grindingandsievingequipment,classifyingandsortingequipmentand
dewateringequipment.
1.0.3
Therequirementsforinstallationqualityassetforthintheengineeringtechnicaldocumentsand
contractdocumentsadoptedintheconstructionofmineralprocessingequipmentinstallationengineering
shallnotbelowerthantherequirementsspecifiedinthiscode.
1.0.4
Inadditiontotherequirementsstipulatedinthiscode,thosestipulatedinthecurrent
relevantstandardsofthenationshallbecompliedwith.
專(zhuān)用
人人文庫(kù)
·1·
2BasicRequirement
2.0.1
Thecontractorofmineralprocessingequipmentinstallationengineeringprojectshallhave
appropriateconstructionqualifications,andconstructiontechnicalstandardsavailableatconstructionsite,a
soundqualitymanagementsystem,relevantqualitycontrolandinspectionrules,aswellastheconstruction
organizationdesign,constructionplan,jobdesignandothertechnicaldocumentswhichhavebeenapproved
bytheprojecttechnicalleader.
2.0.2
Withoutthedesignchangenoticeorsignedtechnicalcertificatefromdesignorganization,
constructiondrawingsmustnotbemodified.
2.0.3
Themeasuringinstrumentsthathavebeenmetrollogicallyverifiedandcalibratedmustbe
usedforqualityinspectionandacceptanceofmineralprocessingequipmentinstallationengineering.
2.0.4Thewelderperformingweldingworkformineralprocessingequipmentinstallationengineeringmust
bequalifiedbyexaminationandobtainacertificate,andmustperformtheweldingworkwithinthescopefor
whichheisqualifiedandapproved.
2.0.5
Themineralprocessingequipmentinstallationengineeringshallbecarriedoutaccordingto
,專(zhuān)用
therequiredproceduresandhandoverinspectionshallbemadebetweentherelatedtypesofwork
andrecordsshallbemade.Thequalityofeachprocesswithinthesamedisciplineshallbecontrolled
inaccordancewithtechnicalstandardforconstruction.Inspectionshallbecarriedoutforeach
processaftercompletionandrecordsshallbemade.Itisnotallowedtoproceedwiththenextone
untilpreviousprocesshasbeeninspectedtobequalified.
2.0.6
Secondarygroutingforequipmentandotherconcealedworksinmineralprocessing
equipmentinstallationengineeringshallbeinspectedforacceptancebyrelevantorganizations,
whichshallbeinformedbythecontractor,beforeconcealing,andtheinspectionshallbe
documented.
2.0.7
Thequalityacceptanceofthemineralprocessingequipmentinstallationengineeringshall
becarriedoutaccordingtoconstituentworks,divisionalworksandunitworksonthebasisofself-
inspectionbythecontractor.Thedivisionofdivisionalworksandconstituentworksshouldbein
accordancewiththosespecifiedinTable2.0.7.
Table2.0.7Divisionofdivisionalworksandconstituent
人人文庫(kù)worksinmineralprocessingequipmentinstallationengineering
Nameof
No.Nameofconstituentworks
divisionalworks
Installationoftramcardumperandplate-typefeeder;installationofelectromagneticvibration
Installationoforefeeding
1feeder;installationofdiskfeeder;installationofchutefeeder;installationofchainfeeder;
anddrawingequipment
installationofpendulumfeederandoredrawinggate
Installationofcrushing,
Installationofjawcrusher,installationofcyclecrusher;installationofconecrusher;installation
2grindingand
oforemill;installationofvibrationsieve,etc.
sievingequipment
·2·
Table2.0.7(Continued)
Nameof
No.Nameofconstituentworks
divisionalworks
Installationofspiralclassifier,installationofhydrocyclone;installationoffinesieveanddrum
Installationofclassifyingmagneticseparator;installationofturncagemagneticseparator;installationofring-typemagnetic
3
andsortingequipmentseparator;installationofmagneticdewateringtank,flotator,jigger,swingbed,centrifugal
separator,heavy-mediumvibratorychuteandspiralconcentrator
Installationofcenterdrive-typeconcentrator;installationofcircularorbitandcentralturnplate
Installationofseatofcircumdrive-typeconcentrator;assemblyofrakeanddrivingmechanismofconcentrator;
4
concentratorandfilterinstallationoffeedingchuteframeofconcentrator;installationoftubeinternalfilteringvacuum
filterandexternalfilteringvacuumfilter,etc.
2.0.8
Thequalityacceptanceofconstituentworksshallbeinaccordancewiththefollowing
requirements:
1
Theinspectionofdominantitemsmustbeinaccordancewithqualitystandardrequirements
ofthiscode;
2
Alltheinspectionresultsofgeneralitemsshallbeinaccordancewithrequirementsofthis
code;
3
Thequalityacceptancerecordsandqualityconformancecerti專(zhuān)用ficatemustbecomplete.
2.0.9
Thequalityacceptanceofdivisionalworksshallbeinaccordancewiththefollowing
requirements:
1
Alltheconstituentworksincludedinthedivisionalworksshallpassthequalityacceptance;
2
Qualitycontroldatashallbecomplete;
3
Theresultoftheno-loadtestrunofindividualequipmentshallbeinaccordancewith
requirements.
2.0.10
Thequalityacceptanceofunitworksshallbeinaccordancewiththefollowingrequirements:
1
Thedivisionalworksincludedintheunitworksshallpassthequalityacceptanceinspection;
2
Qualitycontroldatashallbecomplete;
3
Theresultofno-loadjointcommissioningoftheequipmentshallbeinaccordancewith
requirements;
4
Theappearanceshallpassthequalityacceptance.
2.0.11
Theappearanceinspectionitemsofunitworksshallbeinaccordancewiththefollowing
requirements:人人文庫(kù)
1
Connectingbolts:nutsandwashersshallbecompleteasdesigned.Boltshallnotbelower
thanthenutafterbeingsecured,exposedthreadsshallbedamage-free,andthescrew-indirectionof
boltsshallbethesameunlessotherwisedesignedforconstructionreason;
2
Sealingcondition:noobviousoil/water/gasleakage;
3
Pipelining:reasonablelayoutandorderlyarrangement;
4
Layingofdeadeningandthermalinsulatingmaterials:eventhicknessoflayer,securebindingand
relativelysmoothsurface;
5
Paintcoating:uniformcoating,securebindingandrelativelysmoothsurface;
6
Walkway,ladderandrail:firmfixing,andnoobviousappearancedefects;
·3·
7
Weldbead:relativelyuniformripples,withweldingslagandspattersroughlyremoved;
8
Weldcut:noslagatthecut;
9
Finishedproductprotection:theequipmentshallbedamage-free,withitsexposedmachining
surfacewell-protected;
10
Civilizedconstruction:well-organizedmanagementofconstructionsiteandnosundries
aroundtheequipment;
Randominspectionoftheaboveitemsshallbemadeatnotlessthantenplaces.
2.0.12
Qualityacceptancerecordformineralprocessingequipmentinstallationshallbeinaccordance
withthefollowingrequirements:
1
ThequalityacceptancerecordforconstituentworkshallbeinaccordancewithAppendixA
hereto;
2
ThequalityacceptancerecordfordivisionalworksshallbeinaccordancewithAppendixB
hereto;
3
ThequalityacceptancerecordforunitworksshallbeinaccordancewithAppendixC
hereto;
4
Theequipmentno-loadtestrunrecordshallbeinaccordancewithAppendixDhereto.
2.0.13
Worksthatfailtobeinaccordancewithrequirementsmustberepairedorreworked
immediately,andshallbeacceptedagain.
2.0.14Worksofwhichthequalityisnotinaccordancewiththerequ專(zhuān)用irementsandstillfailtosatisfy
thesafeuserequirementsafterrepairorreworkshallnotbeaccepted.
2.0.15
Thequalityacceptanceofmineralprocessingequipmentinstallationshallbecarriedout
accordingtothefollowingprocedures:
1
Theconstituentworksshallbeacceptedbythetechnicalleader(foreman)andthequality
inspectorofthecontractorundertheorganizationofthesupervisingengineer(Ownersproject
technicalleader);
2
Thedivisionalworksshallbecheckedandacceptedbytheprojectleader,technicalleaderand
qualityleaderofthecontractorundertheorganizationofthechiefsupervisingengineer(Ownersproject
technicalleader);
3
Aftertheunitworksiscompleted,thecontractorshallorganizerelatedpersonneltocarry
outunitworksinspectionandappraisalandsubmittheacceptancereporttotheowner;
4
Aftertheownerreceivestheprojectacceptancereport,theowners(project)leadershall
organizetheleadersfromthegeneralcontractor(includingsubcontractors),thedesignerandthe
supervisortocarry人人文庫(kù)outunitworksacceptance;
5
Whereasubcontractorisinvolvedinunitworksconstruction,thegeneralcontractorshall
beresponsiblefortheoverallqualityoftheunitworks;thesubcontractorshallcheckandassess
thecontractedworksinthepresenceofaworkerfromthegeneralcontractoraccordingtothe
proceduresspecifiedherein.Afterthesubcontractedworkiscompleted,therelatedengineeringdata
shallbesubmittedtothegeneralcontractor.
·4·
3EquipmentFoundation,AnchorBoltandBasePlate
3.1GeneralRequirement
3.1.1
Thischapterisapplicabletotheinstallationqualityacceptanceofmineralprocessingequipment
foundation,anchorboltandbaseplate.
3.1.2
Beforeequipmentinstallation,equipmentfoundationacceptanceinspectionmustbemade,
andequipmentshallnotbeinstalledifthefoundationfailstopasstherequiredqualityacceptance
inspection.
3.1.3
Settlementobservationshallbecarriedoutforthefoundationofthemainmineralprocessing
equipmentandrecordsshallbemade.
3.2EquipmentFoundation
ⅠDominantItems
3.2.1
Equipmentfoundationstrengthmustbeinaccordancewithrequirementsofthetechnical
designdocuments.
:專(zhuān)用
Inspectionquantityexhaustivecheck.
Inspectionmethod:checkthefoundationhandoverdocuments.
3.2.2
Beforetheequipmentisputinplace,thelayoutdrawingforcentralstandardplateand
elevationbenchmarkshallbemadeaccordingtotheconstructionmapandthemeasurementcontrol
network,andthenthecentralstandardplateandelevationbenchmarkshallbesetandthegeodetic
controlpointbemeasuredaccordingtothelayoutdrawing.Thepermanentcentralstandardplate
andelevationbenchmarkshallbeembeddedforthemainequipmentandcontinuousproductionline.
Inspectionquantity:exhaustivecheck.
Inspectionmethod:measurementresultlistcheck,andvisualcheck.
ⅡGeneralItems
3.2.3
Theaxislocation,elevationandsizeandtheanchorboltlocationoftheequipmentfoundationshall
beinaccordancewithrequirementsofthedesigndocumentsandthestipulationsofcurrentnational
GeneralCodeforConstructionandAcceptanceofMechanicalEquipmentInstallation
standardGB50231
Engineering.
Inspectionqua人人文庫(kù)ntity:exhaustivecheck.
Inspectionmethod:checkthereviewrecord.
3
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年搪瓷架子行業(yè)深度研究分析報(bào)告
- 2025年潤(rùn)滑設(shè)備項(xiàng)目可行性研究報(bào)告
- 2024-2030年中國(guó)艾瑞昔布行業(yè)市場(chǎng)深度研究及發(fā)展趨勢(shì)預(yù)測(cè)報(bào)告
- 2025年浮雕瓷器項(xiàng)目投資可行性研究分析報(bào)告
- 2024-2029年中國(guó)出租車(chē)行業(yè)經(jīng)營(yíng)管理模式與投資發(fā)展預(yù)測(cè)分析報(bào)告
- 2025年急救包行業(yè)分析報(bào)告及未來(lái)五至十年行業(yè)發(fā)展報(bào)告
- 2025年阻燃型電纜橋架項(xiàng)目投資可行性研究分析報(bào)告
- 2025年全球及中國(guó)咖啡豆市場(chǎng)前瞻與投資戰(zhàn)略規(guī)劃分析報(bào)告
- 2024-2027年中國(guó)家庭保險(xiǎn)行業(yè)發(fā)展監(jiān)測(cè)及投資戰(zhàn)略研究報(bào)告
- 2018-2024年中國(guó)膳食纖維糖果未來(lái)趨勢(shì)預(yù)測(cè)分析及投資規(guī)劃研究建議報(bào)告
- 寒潮雨雪應(yīng)急預(yù)案范文(2篇)
- 垃圾車(chē)駕駛員聘用合同
- 變壓器搬遷施工方案
- 單位轉(zhuǎn)賬個(gè)人合同模板
- 八年級(jí)語(yǔ)文下冊(cè) 成語(yǔ)故事 第十五課 諱疾忌醫(yī) 第六課時(shí) 口語(yǔ)交際教案 新教版(漢語(yǔ))
- EPC項(xiàng)目采購(gòu)階段質(zhì)量保證措施
- T-NAHIEM 101-2023 急診科建設(shè)與設(shè)備配置標(biāo)準(zhǔn)
- 四川2024年專(zhuān)業(yè)技術(shù)人員公需科目“數(shù)字經(jīng)濟(jì)與驅(qū)動(dòng)發(fā)展”參考答案(通用版)
- 煤炭裝卸服務(wù)合同
- 廣東省佛山市順德區(qū)2023學(xué)年中考一模物理試題(含答案解析)
- 高考英語(yǔ)真題100個(gè)長(zhǎng)難句(語(yǔ)法填空)
評(píng)論
0/150
提交評(píng)論