GB 50443-2016 GB50443-2016水泥工廠節(jié)能設(shè)計規(guī)范:英文_第1頁
GB 50443-2016 GB50443-2016水泥工廠節(jié)能設(shè)計規(guī)范:英文_第2頁
GB 50443-2016 GB50443-2016水泥工廠節(jié)能設(shè)計規(guī)范:英文_第3頁
免費(fèi)預(yù)覽已結(jié)束,剩余19頁請購買后查看

付費(fèi)閱讀全文

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)

文檔簡介

專用

人人文庫

NATIONALSTANDARD

OFTHEPEOPLESREPUBLICOFCHINA

CodeforDesignofEnergyConservationofCementPlant

GB50443-2016

ChiefDevelopmentDepartment:NationalBuildingMaterialsIndustryStandardRatingStation

ApprovalDepartment:MinistryofHousingandUrban-RuralDevelopment

ofthePeoplesRepublicofChina

ImplementationDate:April1,2017專用

人人文庫

ChinaPlanningPress

Beijing2018

ChineseeditionfirstpublishedinthePeoplesRepublicofChinain2016

EnglisheditionfirstpublishedinthePeoplesRepublicofChinain2018

byChinaPlanningPress

rd專用

3Floor,CTower,GuohongBuilding

No.A11,Muxidi-Beili,XichengDistrict

Beijing,100038

www.jhpress.com

PrintedinChinabyFactoryattachedtoBeijingInstituteofGraphicCommunication

?2016bytheStateEconomicandTradeCommissionof

thePeoplesRepublicofChina

Allrightsreserved.Nopartofthispublicationmaybereproducedortransmittedinanyformor

byanym人人文庫eans,graphic,electronic,ormechanical,includingphotocopying,recording,

oranyinformationstorageandretrievalsystems,withoutwrittenpermissionofthepublisher.

Thisbookissoldsubjecttotheconditionthatitshallnot,bywayoftradeorotherwise,belent,

resold,hiredoutorotherwisecirculatedwithoutthepublisherspriorconsentinanyformof

blindingorcoverotherthanthatinwhichthisispublishedandwithoutasimilarcondition

includingthisconditionbeingimposedonthesubsequentpurchaser.

ISBN978-7-5182-0822-7

AnnouncementofMinistryofHousingandUrban-Rural

DevelopmentofthePeoplesRepublicofChina

No.1275

AnnouncementofPublishingtheNationalStandardof

CodeforDesignofEnergyConservationofCementPlant

CodeforDesignofEnergyConservationofCementPlant

hasbeenapprovedasanationalstandardwith

aserialnumberofGB50443-2016,andwillbeimplementedonApril1,2017.Inwhich,clauses3.2.1and

CodeforDesignofEnergy

3.3.1aremandatoryoneandmustbeimplementedstrictly.Theoriginal

ConservationofCementPlant

GB50443-2007shallberepealedsimultaneously.

AuthorizedbyResearchInstituteofStandardsandNormsofMOHU專用RD,thiscodeispublishedand

distributedbyChinaPlanningPress.

TheMinistryofHousingandUrban-RuralDevelopment

August18,2016

人人文庫

Foreword

AccordingtotherequirementsofDocumentJIANBIAO〔2013〕No.169issuedbyTheMinistryof

HousingandUrban-RuralDevelopment(MOHURD)-"NoticeonPrintingandDistributingthe

DevelopmentandRevisionPlanofNationalEngineeringConstructionStandardsin2014",thiscodeis

revisedbytheTianjinCementIndustryDesignandResearchInstituteCo.,Ltdandtherelevantunits.

Duringtherevisionprocessofthiscode,thepreparationteamhasgonethroughextensiveinvestigation

andresearch,conscientiouslysummarizedpracticalexperiences,aswellasreferredtorelevantdomesticand

internationaladvancedstandards.Onthebasisofextensivecomments,thecodewasfinallysubmittedtothe

MOHURDforexaminationandfinalization.

Thiscodeconsistsof7chapters,covering:Generalprovisions,EnergysavingofgeneralLayoutand

building,Energysavingofprocessdesign,Energysavingofpowersystem,Energysavingofmine

engineering,Energysavingofutilities,andEnergymetering.

Therehavebeensomesignificantchangesinthisnationalstandardinthefollowingaspects:

1.AddedEnglishContents.專用

2.Deletedthe"Terms".

3.Modifiedtheenergyconsumptiondesignindex.

4.Increasedtheconceptof"Energyconservationforwasteco-processingsystemofcementkilns".

Theprovisionsprintedinboldtypearemandatoryonesandmustbeimplementedstrictly.

Thiscodeisunderthejurisdictionof,anditsmandatoryprovisionsareinterpretedbytheMOHURD.

TheNationalBuildingMaterialsIndustryStandardRatingStationisresponsibleforroutinemanagement.The

TianjinCementIndustryDesignandResearchInstituteCo.,Ltdisinchargeoftheexplanationoftechnical

specifications.Ifthereisaneedtomodifyandsupplementwhenimplementingthiscode,pleasesendthe

commentsandrelatedinformationtotheTianjinCementIndustryDesignandResearchInstituteCo.,Ltd

(Address:No.1YinheliBeiRoad,BeichenDistrict,Tianjin;Postcode:300400),asreferencesforfuture

revision.

Chiefdevelopmentorganization,co-developmentorganizations,participatingdevelopment

organizations,chiefdraftersstaffandchiefreviewersstaffofthecode:

ChiefDevelopmentOrganization

:

人人文庫TianjinCementIndustryDesignandResearchInstituteCo.,Ltd

Co-DevelopmentOrganizations

:

SinomaTechnology&EquipmentGroupCo.,Ltd

LafargeShuiOnCementCo.,Ltd

ChinaNationalMaterialsGroupCorporationLtd

NanjingKisenInternationalEngineeringCo.,Ltd

HCRDIEngineeringCompany

ChengduDesignandResearchInstituteofBuildingMaterialsIndustryCo.,Ltd

HenanBuildingMaterialsResearch&DesignInstituteCo.,Ltd

ParticipatingDevelopmentOrganizations

:

ChinaResourcesCementHoldingsLimited

·1·

GansuQilianshanCementGroupCo.,Ltd

BBMGGroupCo.,Ltd

ChiefDraftersStaff

:

XuPeitaoHeXiaolongLeiMingWangYangDiDongrenYinZhicheng

LiuTaoLiWeiguangFanYulinGaoLiansongYangLulinLiuJikai

LihuiLiHuirongZhangWanchangZhangZhizhongTaoCuilinMengjun

ChiefReviewersStaff

:

ZengXueminShiJinglinZhaoGuodongJoel.vanderstichelen(ZhouYue)

FanXiaohongZhuXiaobinDingQishengLuBingquanLuWenyun

YiJianrongLiShengyuGuanYueZhangZhongweiLuanJun

ZhangHongna

專用

人人文庫

·2·

Contents

………………

1GeneralProvisions(1)

…………………

2EnergySavingofGeneralLayoutandBuilding(2)

…………………

2.1GeneralLayout(2)

………………………

2.2Building(2)

………………

3EnergySavingofProcessDesign(4)

…………

3.1GeneralRequirements(4)

………………

3.2TheMainEnergyConsumptionIndex(4)

…………

3.3ClinkerBurningSystem(5)

……………………

3.4CrushingandGrindingSystem(6)

……………………

3.5WasteHeatUtilizationSystem(6)

………

3.6WasteCo-processingSystemofCementKilns(6)

………………………

3.7Others(7)

…………………

4EnergySavingofPowerSystem(8)

…………………專用…………

4.1PowerSupplyandDistributionSystem(8)

……………

4.2ElectricalEquipment(8)

………………………

4.3Lighting(8)

……………

5EnergySavingofMineEngineering(9)

………………………

5.1MiningandTransportation(9)

……………………

5.2Drilling,LoadingandTransportationEquipment(9)

………………………

6EnergySavingofUtilities(10)

…………………

6.1WaterSupply(10)

…………

6.2Heating,VentilationandAirConditioning(10)

…………………

7EnergyMetering(12)

………………

ExplanationofWordinginThisCode(13)

……………

ListofQuotedStandards(14)

人人文庫

1GeneralProvisions

1.0.1

Thiscodeispreparedwithaviewtostandardizeenergyconservationdesignofcementplant,which

helpstoutilizeenergyefficientlyandrationally.

1.0.2

Thiscodeisapplicabletoenergyconservationdesignfornewconstruction,extensionandrenovation

ofcementplant.

1.0.3

Theselectedequipmentshallbeenergysavingproductorwater-savingproduct.

1.0.4

Inadditiontotherequirementsstipulatedinthisstandard,theenergyconservationdesignofcement

plantshallmeettherequirementsofthecurrentrelevantstandardsofthenation.

專用

人人文庫

·1·

2EnergySavingofGeneralLayoutandBuilding

2.1GeneralLayout

2.1.1

Inadditiontomeetingtherequirementsofprocessflow,thegenerallayoutshallbewithreasonable

useoftopography,cleardivisionandcompactarrangement.

2.1.2

Theclinkerproductionlineshouldbesetnearbythelimestonemine.Thecementgrindinglineshall

beclosetotheproductmarketandthesourceofadditivematerial,andshallbelocatedoutsidetheblasting

securityline.

2.2Building

2.2.1

Buildingsofthecementplantshallbeclassifiedaccordingtotheirpurposes,functionsandenergy-

savingrequirements,andshallbeinaccordancewiththefollowingrequirements:

1

Intheplant,theOfficeBuilding,CentralControlRoom,Laboratory,individualofficesfor

workshops,ComplexBuildingandpublicbuildingssuchastheDiningRoom,BathHouseandGuardRoom

shallbeclassifiedasClassA.專用

2

Intheplant,theresidentialbuildingssuchasthestaffdormitoryshallbeclassifiedasClassB.

3

Productionbuildingswithheatingorairconditioning,andauxiliarybuildingswithlowtemperature

heatingsuchasindividualsubstations,WaterPumpingStation,WaterTreatmentRoom,CompressedAir

Station,Garage,ServiceShopetc.,shallbeclassifiedasClassC.

4

AuxiliaryindustrialbuildingsrequiringheatingorairconditioningsuchasDutyRoom,Checkout

Room,ControlRoominsidetheworkshopswithoutheatingorairconditioningshallbeclassifiedasclassD.

2.2.2

TheopensizeofexternalwindowsofClassCandDbuildingsofacementplantlocatedinnon-

heatingregionsshouldbeenlargedfornaturalventilation.Mechanicalventilationfacilitiesshallbeinstalled

ifopenablecasementscannotbeadopted.

2.2.3

AporchorothermeasuresshallbeadoptedforClassCbuildingsinseverecoldregionssoasto

preventcoldair.

2.2.4

ExternalwindowsofClassCandDbuildingsinseverecoldandcoldregionsmaybeselected

accordingtothosespecifiedinTable2.2.4.TheAirpermeabilitylevelofexternalwindowsshallnotbe

GraduationandTestMethodfor

lowerthantheLeve人人文庫l3specifiedinthecurrentnationalstandardGB/T7107

AirPermeabilityPerformanceofWindows

.Thesameairpermeabilityrequirementsareapplicabletoexternal

2

doorsandthethermalconductivityofdoorpanelsshallnotbebelow1.5W/m·K.

Table2.2.4WindowsofClassCandDbuildingsinseverecoldandcoldregions

RegionsClassExternalwindow

CDoubleglazingwithsingleplasticsteelframe

Severecold

DInsulatingglazingwithplasticsteelframe

CSingleglazingwithplasticsteelframe

Cold

DDoubleglazingwithsingleplasticsteelframe

2.2.5

TheenergyefficientdesignofClassAbuildingsshallmeettherelevantrequirementsofthecurrent

DesignStandardforEnergyEfficiencyinPublicBuildings

nationalstandardGB50189.WhentheShape

·2·

Coefficientofsmallsingle-storypublicbuildingsinthesimplestshapeisabove0.4,limitofthermal

conductivityofroofandexternalwallsmaybeincreasedby5%oforiginalvalue.

2.2.6

TheenergyefficientdesignofClassBbuildingsshallbecarriedoutonthebasisoftheirlocation

DesignStandard

andclimateandbeinrespectivecompliancewiththecurrentprofessionalstandardsJGJ75

forEnergyEfficiencyofResidentialBuildingsinHotSummerandWarmWinterZoneDesign

,JGJ134

StandardforEnergyEfficiencyofResidentialBuildingsinHotSummerandColdWinterZone

andJGJ26

DesignStandardforEnergyEfficiencyofResidentialBuildingsinSevereColdandColdZones

.

2.2.7

AstotheenergyefficientdesignofClassCbuildings,theminimumthermalresistanceoftheirroof

ThermalDesign

andexternalwallsmaybedeterminedaccordingtothecurrentnationalstandardGB50176

CodeforCivilBuilding

aswellasindoorandoutdoortemperature.Ifexternalwallsrequirethermal

insulation,exteriorthermalinsulationmeasuresforexternalwallsshouldbeadopted.

2.2.8

TheenergyefficientdesignofClassDbuildingsmaycomplywiththecurrentnationalstandardGB

ThermalDesignCodeforCivilBuilding

50176.Theminimumthermalresistanceofexternalwallsmaybe

determinedbytheindoorandoutdoortemperature.Theinteriorthermalinsulationforinternalwallsshallbe

adoptedatthesametime.Theexteriorsurfaceofpartitionwallsoftheroomswithheatinginsidethenon-

heatingworkshopsshalladoptexteriorthermalinsulationmeasuresforexternalwalls.

2.2.9

Glasscurtainwallsshouldnotbeappliedtoanybuildingsofthec專用ementplant.

人人文庫

·3·

3EnergySavingofProcessDesign

3.1GeneralRequirements

3.1.1

Smallandmediumsizedthree-phaseasynchronousmotor,fan,watercentrifugalpump,three-phase

distributiontransformersandothergeneralequipmentusedintheproductionlineshallmeetthe

MinimumAllowableValuesofEnergyEfficiencyandthe

requirementsofcurrentnationalstandardGB30254

EnergyEfficiencyGradesforCageThree-phaseHighVoltageInductionMotorMinimumAllowable

,GB18613

ValuesofEnergyEfficiencyandEnergyEfficiencyGradesforSmallandMediumThree-phaseAsynchronous

MotorsMinimumAllowableValuesofEnergyEfficiencyandEnergyEfficiencyGradesforFan

,GB19761,

TheMinimumAllowableValuesofEnergyEfficiencyandEvaluatingValuesofEnergyConservation

GB19762

ofCentrifugalPumpforFreshWaterTheMinimumAllowableValuesofEnergyEficiencyand

,andGB20052

theEvaluatingValuesofEnergyConservationforThree-phaseDistributionTransformers

.

3.1.2

Theproductionlineshalladoptadvancedproductiontechnologyandenergysavingequipment.

Frequencyconversionspeedregulatingsystemshallbeadoptedinrawmaterialgrindingcirculatingfan,kiln

tailhightemperaturefan,exhaustfan,kilnheadexhaustfan,coalmillex專用haustfan,cementgrindingroller

regrindingsystemcirculatingfanandcementgrindingsystemfanetc.

3.1.3

Theproductionworkshoplayoutshallbesetaccordingtotheprinciplethatthematerialconveying

distanceandpipelengthisrelativelyshort,andthesystemresistanceislow.Materialshouldbeconveyed

fromhightolow.

3.2TheMainEnergyConsumptionIndex

3.2.1Whenthereisnowasteco-processingthemainenergyconsumptiondesignindexofnewand

expansioncementproductionlineduringassessmentperiodshallbeinaccordancewiththose

specifiedinTable3.2.1.

Table3.2.1Mainenergyconsumptiondesignindexofnewand

expansioncementproductionlineduringassessmentperiod

Comparable

ComparableComparableComparableComparable

comprehensive

comprehensivecomprehensivecomprehensivecomprehensive

Dailyoutputelectricity

standardcoalpowerconsumptionenergyconsumptionenergyconsumption

D(t/d)人人文庫consumption

consumptionofofcementofclinkerofcement

ofclinker

clinker(kgce/t)(kW·h/t)(kgce/t)(kgce/t)

(kW·h/t)

D7000101.556.080.0108.588.0

≥≤≤≤≤≤

5000D<7000102.057.082.0109.089.0

≤≤≤≤≤≤

4000D<5000103.058.084.0110.090.0

≤≤≤≤≤≤

3000D<4000103.559.086.0111.091.0

≤≤≤≤≤≤

D<3000105.560.088.0113.092.0

≤≤≤≤≤

Cementgrindingstation--36.0--

·4·

3.2.2

Thetimeperiodofenergyefficiencyassessmentshallmeettherelevantrequirementsofcurrent

CodeforDesignofCementPlant

nationalstandardGB50295.

3.2.3

Powerconsumptionindexofproductionsectionofnewandexpansioncementproductionlineshall

beinaccordancewiththosespecifiedinTable3.2.3,andfiringsystemshallbeinaccordancewiththose

specifiedinTable3.3.1.

Table3.2.3Powerconsumptionindexofproductionsectionofnewandexpansioncementproductionline

ProductionsectionDesignvalue(kW·h/t)ProductionsectionDesignvalue(kW·h/t)

Limestonecrushing≤1.5Cementgrinding≤32.0

Rawmaterialgrinding≤17.0Cementpackaging≤1.5

Coalpowderpreparation≤32.0

Notes:1Limestonecrushingpowerconsumptioncoversfeeding,crushinganddustcollectionequipment.Conveyingequipmentfromcrusher

outlettopre-homogenizingstockpilesarenotincluded.

2RawmaterialgrindingpowerconsumptioncoverstheprocessfromthebottomofRawmaterialmixingsilotothetopofraw-material

homogenizingsilo,includingblendingsilometeringequipment,rawmaterialsmillconveyorbelt,rawmaterialmill(includingroller

press),separator,grindingcirculatingfanandauxiliaryconveyingequipmentandrawmaterialsiloliftingmachineandconveyor

equipmentontopofmaterialsilo.Kilnexhaustfanisnotincluded.Thedesignvalueofrawmaterialgrindingisapplicableformedium-

grindability(BONDgrindingfunctionindexofrawmaterialis10kW·h/t~11kW·h/t).Ifthegrindabilityisdifferent,thedesign

valueshallbemodifiedaccordingtotheactualsituation.

3Coalpowderpreparation(orPetroleumcokeandotherfuels)powerconsumptioncoverstheprocessfromtheinletofmilltothetopof

rawmealhomogenizingsilo,includingweighingequipmentbelowrawcoalbin,main專用bodyofcoalmill,separator,exhaustfanand

auxiliarytransportationequipment.Weighingequipmentofpulverizedcoalandrootsblowerconveyingpulverizedcoalarenot

including.Thedesignvalueofrawcoalgrindingisapplicableformediumgrindability(HGIindexofrawcoalis50~55).Ifthe

grindabilityisdifferent,thedesignvalueshallbemodifiedaccordingtotheactualsituation.

4Cementgrindingpowerconsumptioncoverstheprocessfromthebottomofcementmixingsilotocementsilo,includingmainbodyof

cementmill,rollerpress,separator,dedustingequipment,exhaustfanandconveyingequipment.

5Cementpackingpowerconsumptioncoverstheprocessfromthebottomofcementsilototheloadingofbaggedcement,including

packingequipment,dedustingequipment,loaderandotherconveyingequipment.

3.3ClinkerBurningSystem

3.3.1Withoutco-processingincementkilnorby-pass,theenergyconsumptionindexesofkiln

burningsystemshallbeinaccordancewiththosespecifiedinTable3.3.1.

Table3.3.1Energyconsumptionindexesofkilnburningsystem

HeatefficiencyofsystemHeatconsumptionofclinkerPowerconsumptionofclinker

Dailyoutput(D,t/d)

(%)(kJ/kg)(kW·h/t)

D700056301027.5

≥≥≤≤

5000D<700056303228.0

≤≥≤≤

4000D<5000人人文庫55305028.0

≤≥≤≤

3000D<400055307328.5

≤≥≤≤

D<300053313628.5

≥≤≤

Notes1ThedesignconditionsofclinkerheatconsumptionarethattheburnabilityofrawmaterialisnolessthanclassCtheair

:,

driedbasislow

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論