GB 50754-2012 GB50754-2012擠壓鋼管工程設(shè)計(jì)規(guī)范-英文_第1頁
GB 50754-2012 GB50754-2012擠壓鋼管工程設(shè)計(jì)規(guī)范-英文_第2頁
GB 50754-2012 GB50754-2012擠壓鋼管工程設(shè)計(jì)規(guī)范-英文_第3頁
GB 50754-2012 GB50754-2012擠壓鋼管工程設(shè)計(jì)規(guī)范-英文_第4頁
GB 50754-2012 GB50754-2012擠壓鋼管工程設(shè)計(jì)規(guī)范-英文_第5頁
免費(fèi)預(yù)覽已結(jié)束,剩余45頁請(qǐng)購買后查看

付費(fèi)閱讀全文

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

專用

人人文庫

NATIONALSTANDARD

OFTHEPEOPLESREPUBLICOFCHINA

CodeforDesignofSteelPipeExtrusionEngineering

GB50754-2012

ChiefDevelopmentDepartment:ChinaMetallurgicalConstructionAssociation

ApprovalDepartment:MinistryofHousingandUrban-RuralDevelopment

ofthePeoplesRepublicofChina

ImplementationDate:August1,2012

專用

人人文庫

ChinaPlanningPress

Beijing2016

圖書在版編目(CIP)數(shù)據(jù)

擠壓鋼管工程設(shè)計(jì)規(guī)范英文中華人民共和國(guó)住房和城

GB50754-2012:/

鄉(xiāng)建設(shè)部組織編譯北京中國(guó)計(jì)劃出版社

.—:,2016.1

ISBN978-7-5182-0322-2

中管道鋼管管道工程設(shè)計(jì)規(guī)范中國(guó)

Ⅰ.①G…Ⅱ.①…Ⅲ.①----

英文

Ⅳ.①TU81

中國(guó)版本圖書館數(shù)據(jù)核字第號(hào)

CIP(2015)281878

ChineseeditionfirstpublishedinthePeoplesRepublicofChinain2012

EnglisheditionfirstpublishedinthePeoplesRepublicofChinain2016

byChinaPlanningPress

rd專用

3Floor,CTower,GuohongBuilding

No.A11,Muxidi-Beili,XichengDistrict

Beijing,100038

PrintedinChinabyBeijingJinghuaHucaisPrintingCO.,LTD

?2012byMinistryofHousingandUrban-RuralDevelopmentof

thePeoplesRepublicofChina

Allrightsreserved.Nopartofthispublicationmaybereproducedortransmittedinanyformor

byanymea人人文庫ns,graphic,electronic,ormechanical,includingphotocopying,recording,

oranyinformationstorageandretrievalsystems,withoutwrittenpermissionofthepublisher.

Thisbookissoldsubjecttotheconditionthatitshallnot,bywayoftradeorotherwise,belent,

resold,hiredoutorotherwisecirculatedwithoutthepublisherspriorconsentinanyformof

blindingorcoverotherthanthatinwhichthisispublishedandwithoutasimilarcondition

includingthisconditionbeingimposedonthesubsequentpurchaser.

ISBN978-7-5182-0322-2

AnnouncementoftheMinistryofHousingandUrban-Rural

DevelopmentofthePeoplesRepublicofChina

No.1264

Announcementonpublishingthenationalstandardof

CodeforDesignofSteelPipeExtrusionEngineering

CodeforDesignofSteelPipeExtrusionEngineering

(hereinafterreferredtoastheCode)

hasbeenapprovedasanationalstandardwithaserialnumberGB50754-2012andwillbe

implementedonAugust1,2012.InthisCode,provisions6.1.14,6.1.21(2,3,4),12.2.5and

12.2.6arecompulsoryandmustbeenforcedstrictly.

AuthorizedbytheStandardQuotaResearchInstituteofourMinistry,thisCodeispublished

anddistributedbyChinaPlanningPress.專用

MinistryofHousingandUrban-RuralDevelopmentofthePeoplesRepublicofChina

January21,2012

人人文庫

Foreword

ThisCodeisdevelopedbyCapitalEngineering&ResearchIncorporationLimited(CERI)in

conjunctionwithotherrelevantorganizationsaccordingtotherequirementsofDocumentJianBiao

[2009]NO.88issuedbyMinistryofHousingandUrban-RuralDevelopment,P.R.China

DevelopmentandRevisionPlanofNationalEngineering

(MOHURD)-"NoticeonPrintingthe

ConstructionStandardsin

2009".

Thepreparationpanelmadeanin-depthstudyandconcludedexperiencesinpipeextrusion

engineeringinChinaduringformulatingtheCode.Asresultsofwidelyconsultingdomestic

extruded-pipeproducers,designinstitutes,rawmaterialsuppliers,end-users,equipment

manufacturers,authoritiesconcerned,professionalassociationsandexpertsinthisfield,andbased

onstudyingandabsorbingexperienceswell-proveninmanyyearsathomeandabroadbytaking

intoaccountthecurrentengineeringpracticeinChina,thisCodewasexaminedandapprovedafter

repeateddiscussionsandconscientiousmodifications.

ThisCodecomprises12chapterswiththemaincontentsincludi專用nggeneralprovisions,terms,

basicrequirement,rawmaterial,producingprocess,equipment,productioncapacitycalculation,

layoutandprocessplant,electricalautomation,auxiliarysystem,maineconomicalandtechnical

targetandsecurity&environmentalprotection.

Theprovisionsprintedinboldtypeinthisstandardarecompulsoryandmustbeenforced

strictly.

MOHURDisinchargeoftheadministrationofthisstandard(code)andtheexplanationofthe

compulsoryprovisions.ChinaMetallurgicalConstructionAssociationtakesresponsibilityfor

routinemanagement,andCERIisresponsibleforexplainingthetechnicaldetails.Allrelevant

organizationsarekindlyrequestedtosumupexperiencesbytakingintoaccounttheirown

engineeringpracticesduringtheprocessofimplementingthisCode.Ifanyamendmentandaddition

isfoundnecessary,pleasemailyourcommentsandsuggestionstotheCodeAdministrationOfficeof

CERI(Address:No.7Jiananjie,BeijingEconomic&TechnicalDevelopmentArea;Postcode:

100176)forreferencesinfuturerevision.

ChiefDevelopmentOrganization,ParticipatingDevelopmentOrganizations,ChiefDrafting

StaffandChiefEx人人文庫aminantsarelistedbelow.

ChiefDevelomentOranization

pg:

MCCCapitalEngineering&ResearchIncorporationLimited

ParticiatinDevelomentOranizations

pgpg:

JiangyouGreat-WallSpecialSteelCo.,LtdofPanzhihuaSteelCorp.

ZhejiangJIULIHi-TechMetalsCo.,Ltd.

SpecialSteelBusinessDivisionofBaosteel

ShanxiTaigangStainlessSteelCo.,Ltd.

InnerMongoliaNorthHeavyIndustriesGroupCo.,Ltd.

TianjinPipe(Group)Corporation

·1·

ChiefDraftinStaff

g:

TanXuefengLanXingchangShaoYuBaiZhenZhongXidi

ZhangZengquanAnHongshengZhangHaijunGongZhangyao

LiLishengLiuHuanliangDingBuwenLiZhenzi

ChiefExaminants

:

YangXiuqinLiXiaohongWuRendongWangChangcheng

WangZongbaoSuChenglongXuLianwenGuoYuxiPengXipeng

專用

人人文庫

·2·

Contents

……………

1GeneralProvisions(1)

…………………………

2Terms(2)

……………

3BasicRequirement(4)

…………………

4RawMaterial(5)

………………

4.1TheHorizontalExtrusionProcess(5)

…………………

4.2TheVerticalExtrusionProcess(5)

……………

5ProductionProcess(6)

………………

5.1TheHorizontalExtrusionProcess(6)

…………………

5.2TheVerticalExtrusionProcess(6)

……………………

6Equipments(7)

……………………

6.1HorizontalExtrusionPress(7)

………………………

6.2VerticalExtrusionPress(9)

……………

7ProductionCapacityCalculation(11)

……………………

專用()

8LayoutandProcessPlant12

………………

8.1TheSiteofPlant(12)

………………………

8.2Layout(12)

……………………

8.3ConveyanceofPlantMaterial(13)

…………

9ElectricAutomation(14)

………………

9.1ElectricSystem(14)

…………

9.2AutomaticApparatus(14)

………………

9.3TelecomSystem(15)

……………

10AuxiliarySystem(16)

……………………

10.1WaterSupplyandDrainage(16)

………………

10.2ThermalPower(16)

……………

10.3FuelGasSystem(17)

…………………

11MainEconomicalandTechnicalTargets(18)

……………………

12SecurityandEnvironmentalProtection(19)

……………………

12.1Security人人文庫(19)

……………………

12.2EnvironmentalProtection(19)

…………

ExplanationofWordinginThisCode(20)

…………

ListofQuotedStandards(21)

……………

Addition:ExplanationofProvisions(23)

1GeneralProvisions

1.0.1

ThisCodeisformulatedwithaviewtostandardizingthedesignofpipeextrusion

engineering,advancingthepipe-extrusiontechnologyandequipmentinChinaandguaranteeingthe

engineeringqualityaswell.

1.0.2

ThisCodeisapplicabletothedesignofconstruction,extensionandrenovationofpipe

extrusionengineering.

1.0.3

Thepipeextrusionengineeringmentionedinprovision1.0.2shallfullyimplementthe

nationalindustrydevelopmentpoliciesandpoliciesstressingonhighquality,highefficiency,energy

savingandenvironmentalprotection.

1.0.4

Thedesignofpipe-extrusionengineeringshallcomplywithnotonlytherequirements

stipulatedinthisCode,butalsothoseinthecurrentrelevantonesofthenation.

專用

人人文庫

·1·

2Terms

2.0.1

Expanding

Theprocessofusingtoolstoexpandasmallholealreadyinsidethebillettothesizerequested

forextrusion.

2.0.2

Piercing

Theprocessinwhichthesolidbilletisfirstputintoapiercingcontainerandupsetwith

upsettingsteminordertomakeitfullyoccupytheinnerspaceofthecontainer.Thenextstepis

tousetoolstopierceathrough-holealongthecenterofthebilletaccordingtoextrusion

requirement.

2.0.3

Extruding

Aproductionprocess,inwhichthebilletisplacedintoalargevesselthatconsistsofextrusion

container,extrusiondie,mandrelanddummyblock;thenextrusionforceappliedbyextrusionstem

willforcemetalsflowingoutalongtheinterspaceformedbyextrusiondieandmandreltoallowthe

billettobeextrudedintopipeproduct.

2.0.4專用

Millset

Apackageofalltechnologicalequipmentsthatisnecessaryfortheentireprocess,rangingfrom

rawmaterialpreparationtoendproductswhicharespecifiedintheproductmix.

2.0.5

Annualnecessaryproductiontimeofmillset

Annualactualproductiontimethatisnecessaryforachievingtheannualproductionoutputas

specifiedintheproductmix.

2.0.6

Dutyratioofmillset

Apercentageofactualannualworkingtimetoeffectiveannualworkingtimeofthemill

set.

2.0.7

Online

Anoperationmodeinwhichaworkingstockcanbetransportedtoadesignatedworking

procedurefromacontinuouslyoperatedextrusionline,orviceversa,withouttheneedofliftingand

transportequipmentandmanualhandlingaswell.

2.0.8

Visualexamination

Amethodto人人文庫observetheinsideandoutsidesurfaceofsteelpipewitheithernakedeyesor

simpletoolslikelow-magnificationmagnifierorendoscopestofindoutsurfacedefect,ifany.

2.0.9

Non-destructivetesting

Ageneraldescriptionofflawdetectionmethodswithoutdamagingpropertiesandintegrityof

materialorproducttobetested.

2.0.10

Ultrasonicinspection

Anon-destructivetestingmethodofusingultrasonictodetecttheinsideandoutsidesurface

defect,ifany.

2.0.11

Eddycurrentinspection

Aflawtestingmethodtogenerateeddycurrentinsideaconductivespecimen,andthendetect

·2·

defect,ifany,bymeasuringthevariationofeddycurrent.

2.0.12

Onlinesolutiontreatment

Aheattreatmentmethodtoobtainsupersaturatedsolidsolutionbyutilizingfastcoolingofthe

residualheatgeneratedduringpipeextrusion.

專用

人人文庫

·3·

3BasicRequirement

3.0.1

Thenameofextrusionpressshallbeexpressedas"ΧΧΧMNextrusionpress",ofwhichthe

"ΧΧΧ"referstonominalextrusionforce.

3.0.2

ExtrusionpressesshouldbeselectedbasedonTable3.0.2.

Table3.0.2Extrusionpressseries

NoSpecificationsofextrusionpressseries

125MNextrusionpress

231.5MNextrusionpress

340MNextrusionpress

450MNextrusionpress

563MNextrusionpress

680MNextrusionpress

7125MNextrusionpress

8250MNextrusionpress

9360MNextrusionpress專用

3.0.3

Theextrusionpressshallbedesignedtoworkunderacontinuousduty.

3.0.4

Theannualeffectiveworkingtimeofextrusionpressshallnotbelessthan5000h,andthe

annualnecessaryproductiontimeshallnotbelessthan4000h.

3.0.5

Thedutyratiooftheextrusionpressshallnotbelowerthan80%.

3.0.6

Thepipeextrusionengineeringshouldincorporatetheconstructionofglass-padmanufacturing

facilitywhichiscapableofproducingallsizesofglasspadsforextrusionpress.

3.0.7

Thepipeextrusionengineeringshouldalsoincorporatenecessaryphysical&chemical

testingfacilitiestomeetinspectionrequirementsspecifiedinrelevantproductstandards.

3.0.8

Thesupply,repairandassemblyofproductiontoolsanddiesshallbespecifiedin

engineeringdesign.

3.0.9

Thecapacityofequipmentusedformachiningorrepairingspecialproductiontoolsanddies

shallbecalculated人人文庫andcheckedindesigninordertosatisfythemillset.

·4·

4RawMaterial

4.1TheHorizontalExtrusionProcess

4.1.1

Thecastbillet,rolledbilletandforgedbilletwithroundsectionmaybeusedasraw

materialforhorizontalextrusion.

4.1.2

Thechemicalcomposition,microstructureandthelikeofthebilletsshallcomplywiththose

specifiedintherelevantcurrentnationalstandardsrelatedtosteelpipeproducts.

4.1.3

Thereshallbenodefectslikelap,linedefect,crackandshrinkagecavityonthesurfaceand

insideofthebillet.

4.1.4

Theoutlinedimensionsshallmeettherequirementofextrusionprocess.

4.2TheVerticalExtrusionProcess

4.2.1

Thesolidroundbillet,polygonalingotsorhollowbilletmaybeusedasrawmaterialfor

verticalextrusionprocess.

4.2.2

Technicalspecificationsofthebillets,suchaschemicalco專用mposition,shallcomplywith

thosespecifiedintherelevantcurrentnationalstandardsrelatedtosteelpipeproducts.

4.2.3

Hollowbilletsshouldbeusedunderthefollowingcircumstances:

1

extrudingmetalsthataredifficulttobedeformed;

2

extrudingthin-wallpipeproducts;

3

extrudingrare-metalpipesthatareveryeasytostickthepiercingrod;

4

usingtheextrusionpresswhichhasnoindependentpiercingunit.

4.2.4

Thesurfaceorinnerofthebilletsshallbefreeofdefectslikelap,scab,crack,shrinkage

cavity,etc.

4.2.5

Theoutsidediameterofthebilletshallmatchtheinsidediameterofthepiercercontainer.

人人文庫

·5·

5ProductionProcess

5.1TheHorizontalExtrusionProcess

5.1.1

Thehorizontalextrusionprocessshallcompriseraw-materialpreparation,extrusion

forming,pipefinishing,heattreatmentandproductinspection.

5.1.2

Raw-materialpreparationshallincludestraightening,peeling,cutting,drilling,end-face

machining,visualinspectionandgrinding.Otherproceduresmaybeaddeddependingonproduct

variety.

5.1.3

Extrusionformingshallcomprisebilletcleaning,reheating,descaling,lubricationfor

expanding,piercingorexpanding,descaling,secondaryreheating,lubricationforextrusion,

extruding,coolingandcollection.Otherproceduresmaybeaddeddependingonproductvariety.

5.1.4

Pipefinishingshallcomprisestraightening,cuttingtolength,pipe-endtreatment,insideand

outsidesurfaceprocessing,weighing,spraymarking,printingandpacking.Otherproceduresmaybe

addeddependingonproductvariety.

5.1.5

Onlinesolutiontreatment,offlinesolutiontreatment,normali專用zing&temperingtreatment,

annealingandthelikemaybeusedforheattreatment.

5.1.6

Productinspectionshallincludenondestructivetest(NDT),insideandoutsidesurface

inspectionandoutlinedimensioninspection.Otherproceduresmaybeaddeddependingonproduct

variety.

5.2TheVerticalExtrusionProcess

5.2.1

Theverticalextrusionprocessshallcompriseraw-materialpreparation,extrusionforming,

pipefinishing,heattreatmentandproductinspection.

5.2.2

Hot-transferandhot-chargingtechnologyshouldbeusedforrawmaterialoftheextrusion

process.

5.2.3

Raw-materialpreparationshallincludesurfacecleaningandriser-headcutting.

5.2.4

Extrusionformingshallcomprisereheating,descaling,lubricationforpiercing,upsetting&

piercing,descaling,lubricationforextrusion,extrudingandcooling.Otherproceduresmaybeadded

dependingonproductvariety.

5.2.5

Pipefinish人人文庫ingshallcompriseinside-andoutside-surfaceshotblasting,straightening,end-

facemachining,inside-andoutside-surfaceprocessing,weighing,sprayingmarking,printingand

packing.Otherproceduresmaybeaddeddependingonproductvariety.

5.2.6

Annealing,normalizing,normalizing&tempering,solutiontreatmentandthelikecanbe

usedforheattreatment.

5.2.7

Productinspectionshallincludenondestructivetest(NDT),insideandoutsidesurface

checkingandoutlinedimensioninspection.Otherproceduresmaybeaddeddependingonproduct

variety.

·6·

6Equipments

6.1HorizontalExtrusionPress

6.1.1

Thehorizontalpipeextrusionlineshallbeprovidedwithfull-linebasicautomationcontrol.

6.1.2

Eitherhydraulicormechanicalstraighteningmachinemaybeselectedforlong-billet

straighteningprocess.Straighteningunitshallbecombinedwithbilletturningdevice.

6.1.3

Eithermultiple-lengthpeelerorcut-to-lengthpeelercanbeselectedforpeelingprocess,and

thepeelershallmeetrequirementsasfollows.

1

Machiningsizesshallcoveralldiametersandlengthsofrawmaterials.

2

Thediametertoleranceandsurfaceroughnessaftermachiningshallconformtoextrusion

requirements.

3

Thesurfaceaftermachiningshallbefreeofanydefectthatmayaffecttheextrusion

product.

6.1.4

Thebandsawshouldbeselectedforbilletcutting.However,thecircularsawcanbea

choiceaswell.

6.1.5專用

Specialmachinetoolswhichcanperformdrillingandboreholeshallbeprovidedfordrilling

process.

6.1.6

TheCNClatheshouldbeusedforend-facemachining.

6.1.7

Thecontinuouswashinglineshouldbeselectedforbilletsurfacecleaning;andthebillet

dryingunitshallbeavailableaftercleaning.

6.1.8

Therotary-hearthfurnaceplusinductionfurnaceshouldbeselectedforbilletreheating;and

usinginductionfurnacealonemayalsobeanalternativeforthesame.Thefurnaceequipmentshall

meetthefollowingrequirements.

1

Therotary-hearthfurnaceshallmeetthetemperaturerequirementofbilletpreheatingfor

extrusionprocess.

2

Eithermains-frequencyinductionfurnaceorvariable-frequencyinductionfurnacemaybe

selectedforinductiveheating.

3

Inductionfurnaceshallensurethatthebilletreheatingtemperaturecansatisfythe

expandingandextrusionprocesses.

4

Thesizes人人文庫ofinductionfurnaceshallconformtoexpandingandextrudingdimension

requirement.

6.1.9

Theverticalexpanderforexpandingprocessshallbeselectedaccordingtothefollowing

requirements.

1

Theexpendershallbeabletoperformexpanding.Meanwhile,piercingmaybeexpectedas

anadditionalfunctionoftheexpender.

2

Themaximumexpanding(piercing)capacityshallsatisfytheneedofpipeproduction.

3

Theinsidediameterofexpandingcontainershallmatchthebilletdiameter.

4

Theremustbenoanycrackanddepressiononbilletsurfaceafterexpanding.

5

Electricstoveshallbeinstalledinexpandingsectionforpreheatingtoolsanddies.

·7·

6.1.10

Hydraulicdescalershallbeselectedforbilletsurfacedescaling,andthedescalingpressure

shallnotbelowerthan12MPa.

6.1.11

Thelubricationunitforapplyingglasspowderoninsideandoutsidesurfaceofthebillet

shallbeprovidedpriortoexpandingandextrusionandcomplywiththefollowingrequirementsas

well.

1

Thelubricationtableshouldbeusedforlubricatingthebilletoutsidesurfacewithglass

powder.

2

Theautomaticmanipulatorshouldbeusedforaddingglasspowdertolubricatethesurface

ofholeinsidethebilletbeforeexpanding;andthemanualmodemaybeselectedasanoption.

3

Themanipulatorforaddingglasspowdershouldbeselectedforlubricatingtheinside

surfaceofthebilletbeforeextrusion.

6.1.12

Theselectionofextrusionpressshallmeetthefollowingrequirements.

1

Theoilshouldbeusedastransmissionmediaforextrusionpress,andthewatermaybe

usedasanalternative.

2

Themaximumextrusionforceshallmeettheproductextrusionrequirement.

3

Theinsidediameterofextrusioncontainershallmatchthebilletdiameter.

4

Theextrusiontoolsshallhaveaquick-changefunction.

5

Theinnerwallofextrusioncontainershouldbecombinedwithautomaticcleaningdevice.

6專用

Thecoolingunitshallbeprovidedformandrelbar.

7

Preheatingandcoolingdevicesshallbeinstalledforextrusioncontainer.

8

Preheatingunitshallbeprovidedfortoolsanddies.

6.1.13

Thepipeextrusionpressmayincorporatetheequipmentwhichisabletoextrudeprofiled

barandshapedpipe.

6.1.14Thesafetyguardmustbeinstalledalongdeliveryrollertable,andmustbestrongenoughto

preventmandrelandpipefromrushingoutoftheguardincaseofaccident.

6.1.15

Quenchingtankandcollectionunitshallbeavailableinpipecoolingsection;andthe

coolingbedoronlinesprayingunitmaybeusedasanalternative.

6.1.16

Theroller-hearthfurnaceshouldbeselectedforheattreatmentinextrusionshop;andthe

bogie-hearthfurnaceandchamberfurnacemaybeaddedaswell.

6.1.17

Therollerstraightenershallbeprovidedforstraighteningprocess;andthestraightening

pressmaybeaddedaswell.Thestretcherstraightenershallbeinstalledincaseofproducingprofile

bars.

6.1.18

Equipmen人人文庫tselectionforsawingprocessshallconformtothefollowingrequirements.

1

Thesawingequipmentshallhavecutting-to-lengthfunction.

2

Thesawingequipmentshouldbecombinedwithdeburringunit.

6.1.19

Abrasivebeltgrindershouldbeselectedforpipeoutsidegrindingandthewet-type

grindingispreferable.

6.1.20

Thepipeinsidegrindingequipmentshallconformtothefollowingrequirements.

1

Thegrindingmachineshallbeabletoperformfull-lengthinsidegrinding;andtheinner

surfaceofpipeaftergrindingshallbefreeofanydefectlikescratchanddepression.

2

Thegrindershallbeequippedwithdedustingunit.Directemissionofdustgeneratedduring

grindingisstrictlyprohibited.

·8·

6.1.21

Picklingequipmentshallbeinstalledtoremovescalesfrominsideandoutsidesurfaceof

steelpipes;andtheshotblastingandpicklingequipmentmaybeprovidedsimultaneously.The

equipmentshallconformtotherequirementsasfollows.

1

Theshotblastingequipmentshallbeequippedtogetherwithdedustingunit.

2Theacid-mistcollectionandtreatmentunitmustbeprovidedforpicklingequipment.

3Thepicklingequipmentmustbecombinedwithcollectionandtreatmentfacilitiesforacid-

containedwastewater.

4Thewaste-acidcollectionsystemmustbeprovidedforpicklingequipment.

6.1.22

Ultrasonicflawdetectorandeddy-currentflawdetectorshallbeinstalledinnon-

destructivetest(NDT)section;andotherNDTequipmentmaybeaddedifnecessary.

6.1.23

Ultrasonicflawdetectorshallhaveafunctionofthicknessgauging.TheNDTequipment

shallbeabletomarkandrecorddefects.

6.2VerticalExtrusionPress

6.2.1

Eithertorchcuttingmachineorsawingmachinemaybeselectedforingotrisercutting.

6.2.2

Ingotgrindingmachineshouldbepro

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論