




版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
橋梁預(yù)制件制作協(xié)議中英文對(duì)照版AGREEMENTOFBRIDGEPREFABRICATEDPARTSENGINEERING橋梁預(yù)制件制作協(xié)議TABLEOFCONTENTS目錄1.OBLIGATIONS各方義務(wù)2.TOTALPRICE總價(jià)3.CONDITIONSOFPAYMENT付款條件4.TIMESCHEDULE工期計(jì)劃5.QUALITYREQUIREMENTS質(zhì)量要求6.WARRANTY質(zhì)量保修7.LOCATIONOFDELIVERY交付地點(diǎn)8.TERMINATION終止合同9.OTHERMATTERS其他事項(xiàng)10.Attachment附件ThisAgreementismadebetween本協(xié)議由如下當(dāng)事方簽訂:ChinaInternationalWater&ElectricCorporation(CWE)-BranchOfficeinthePhilippines,abranchandsubsidiaryofCWE(Beijing,China)authorizedtodobusinessinthePhilippines.中國(guó)國(guó)際水電公司(CWE)菲律賓分公司,系該公司(中國(guó)北京)的分公司和子公司,授權(quán)在菲律賓開(kāi)展業(yè)務(wù)。-and--和-BBRPhilippinesCorporation,dulyregisteredandexistingunderthelawsoftheRepublicofthePhilippineswithofficeaddressatSuite502,7EastCapitolBuildingNo.7EastCapitolDrive,Brgy.Kapitolyo,PasigCity,representedbyitsManagerMr.ReyC.D.Singh,hereinafterreferredtoasBBR.BBR菲律賓公司,根據(jù)菲律賓共和國(guó)法律正式注冊(cè)和續(xù)存,辦公地址為Kapitolyo,Pasig市Brgy東國(guó)會(huì)大廈7號(hào)502套房,經(jīng)理為Mr.雷伊·C·D。辛格(以下簡(jiǎn)稱(chēng)BBR)。WHEREASCWEhasbeenawardedtheContractfortheRestorationofMancatianBridgeincludingAccessRoadalongtheAngeles-PoracRoad,PinatuboHazardUrgentMitigationProject-PhaseII,ContractPackageNo.7bythePhilippinegovernment,hereinafterreferredtoasthe“Project”.鑒于中國(guó)國(guó)際水電公司已被授予修復(fù)曼卡提安橋的合同,包括沿Angeles-Porac公路的通道,Pinatubo災(zāi)害緊急緩解項(xiàng)目-第二階段,菲律賓政府第7號(hào)合同包(下稱(chēng)“項(xiàng)目”)。NOWTHEREFORE,thePartiesheretoagreeasfollows:雙方同意如下:1.OBLIGATIONS各方義務(wù)TobeprovidedbyBBR:由中國(guó)國(guó)際水電公司提供:PreparationofShopDrawingsforApprovalbytheConsultantandtheowner.準(zhǔn)備制作車(chē)間圖紙以供咨詢(xún)工程師和業(yè)主批準(zhǔn)。SubmitMethodStatementforFabricationofAASHTOGirder,TendonExtensionCalculation,orotherdocumentsrequiredbyCWEortheConsultant.提交制造AASHTO梁,張拉計(jì)算或中國(guó)國(guó)際水電公司或咨詢(xún)工程師要求的其他文件的方法陳述。Fabricationof36PiecesofAASHTOPrestressedConcreteGirders,TypeIV-B(L=29.65m.)includingbutnotlimitedtotheprovisionoftheallnecessarySupervision,Labor,MaterialsandEquipmentsfortheFabricationWorks.制造36件AASHTO預(yù)應(yīng)力混凝土梁,型號(hào)為IV-B(L=29.65米),包括但不限于為制造工程提供所有必要的監(jiān)理、勞務(wù)、材料和設(shè)備。Deliveryofthe36PiecesofAASHTOPrestressedConcreteGirders,TypeIV-B(L=29.65m.)throughaAccessRoadtoaTruck-AccessiblelocationontheProjectSite.將36件AASHTO預(yù)應(yīng)力混凝土梁,IV-B型(L=29.65米)通過(guò)通道運(yùn)送到項(xiàng)目現(xiàn)場(chǎng)的卡車(chē)可達(dá)位置。AllnecessaryPermits,Licenses,Clearances,etc.requiredbyLawtobeprovidedbyCWE:法律規(guī)定的所有必要許可證,執(zhí)照,準(zhǔn)許等由中國(guó)國(guó)際水電公司提供:ProvisionofsuitableAccesstotheUnloadingSiteincludingtheclearingofanyObstructions.為卸貨地點(diǎn)提供合適的通道,包括清除任何障礙物。UnloadingoftheAASHTOPrestressedConcreteGirdersfromtheDeliveryTrailers/Truck.從交付拖車(chē)/卡車(chē)上卸下AASHTO預(yù)應(yīng)力混凝土梁。InstallationoftheAASHTOPrestressedConcreteGirdersincludingtheprovisionofthenecessaryInstallationAccessories(e.g.BearingPads,BearingSleeves,etc.).安裝AASHTO預(yù)應(yīng)力混凝土梁,包括提供必要的安裝附件(例如軸承墊,軸承套等)。2.TOTALPRICE總價(jià)CWEshallpayBBRtheTotalPriceofElevenMillionTwoHundredThirtyTwoThousandpesos(PHP11,232,000.00)fortheFabricationandDeliveryofthe36PiecesofAASHTOPrestressedConcreteGirders,TypeIV-B(L=29.65m.)TheUnitPriceforeachPrestressedConcreteGirdersisThreeHundredTwelveThousandPesos(PHP312,000.00).中國(guó)國(guó)際水電公司將向支付11,232,000.00比索的總價(jià),用于制造和交付36件AASHTO預(yù)應(yīng)力混凝土梁,型號(hào)為IV-B(L=29.65m。)每個(gè)預(yù)應(yīng)力混凝土梁的單價(jià)為312,000.00比索。Itisexpresslyunderstoodandagreed,theUnitPricesareinfullsatisfactionofallitscostsincurredbyBBRforsupervision,survey,laboratoryandfieldtest,materials,equipment,laborandanyotherpersonnelitwillemploy,tools,temporaryfacilitiesandconsumablesnecessary,butnotlimited,forthecompletionofthefabricationofgirders,includingcontingencies,overtimeofextrashifting,projectinsurance,taxesofeverykindincludingtheVAT,withholdingtaxandnaturethatmaybeassessedagainstBBRunderthiscontract,inclusiveofallfees,charges,licenses,itsadministrativeexpensesandoverhead,itsprofitandgenerallyanyandallotherattendantfees.各方同意,單位價(jià)格完全滿(mǎn)足BBR對(duì)監(jiān)理、勘察、實(shí)驗(yàn)室和現(xiàn)場(chǎng)測(cè)試、材料,設(shè)備、勞務(wù)及其將雇用的任何其他人員,工具,臨時(shí)設(shè)施和消耗品所產(chǎn)生的所有費(fèi)用。但不限于完成大梁的制造,包括意外事故、加班、項(xiàng)目保險(xiǎn)、各種稅收,包括增值稅、預(yù)扣稅和BBR根據(jù)本合同據(jù)評(píng)估的性質(zhì),包括所有費(fèi)用、收費(fèi)、許可證、管理費(fèi)用和間接費(fèi)用、利潤(rùn)以及一般任何和所有其他附帶費(fèi)用。3.CONDITIONSOFPAYMENT付款條件a.FifteenPercent(15%)DownpaymentpayableuponsigningoftheContractwithacceptableperformancebondprovidedbyBBR.簽署合同時(shí),應(yīng)以BBR提供的可接受履約保證金支付15%的首付款(15%)。b.MonthlyProgressPaymentsubjecttobemadeinaccordancewiththeValuationoftheWorkDone,withalldulysupportingdocumentscertifiedbytheConsultantEngineer.FabricatedGirdershaveacorrespondingSeventyPercent(70%)AccomplishmentValuewhiletheDeliveryoftheGirdershaveacorrespondingThirtyPercent(30%)AccomplishmentValue.Tenpercent(10%)ofamountofmonthlyprogressbillingshallbedeductedasretentionmoneyofthiscontract.每月進(jìn)度付款根據(jù)工作估價(jià)進(jìn)行,所有正式支持文件均由咨詢(xún)工程師工程師認(rèn)證。制造的大梁具有相應(yīng)的百分之七十(70%)的成就值,而大梁的交付具有相應(yīng)的百分之三十(30%)的成就值。月度進(jìn)度計(jì)費(fèi)金額的百分之十(10%)應(yīng)扣除為本合同的保留金。c.TheTenPercent(10%)RetentionMoneywillbereleasedThree(3)MonthsaftertheDeliveryofthelastPrestressedConcreteGirders,PriortothereleaseoftheRetentionMoney,asuitableGuaranteeBondwillbesubmittedbyBBRtoCWE.10%(10%)保留金將在最后一個(gè)預(yù)應(yīng)力混凝土梁交付后三(3)個(gè)月發(fā)布,在保留金發(fā)放之前,BBR將向CWE提交合適的擔(dān)保債券。4.TIMESCHEDULE工期計(jì)劃FabricatedgirdersshallbetakengoodcareofinBBR’splant(freeofcharge)andbedeliveredtotheprojectjobsiteforinstallationaccordingtothescheduleofCWEfordelivery.ThedeliveryofthePrestressedConcreteGirdersshouldbecompletedbyFebruary20,2004.Becauseoftheurgencyandimportanceofthisproject,BBRshallstrictlyfollowthescheduleofproductionandberesponsibleforanydelaysduetothefailureofexecutingthiscontractexceptforforcemajeure.裝配式梁應(yīng)在BBR的工廠中得到妥善的保養(yǎng)(免費(fèi)),并按照CWE的計(jì)劃交付到工程工地進(jìn)行安裝。預(yù)應(yīng)力混凝土梁的交付應(yīng)在2004年2月20日前完成。由于本項(xiàng)目的緊迫性和重要性,除不可抗力外,BBR應(yīng)嚴(yán)格遵守生產(chǎn)計(jì)劃,并對(duì)因未能執(zhí)行本合同而造成的任何延誤負(fù)責(zé)。5.QUALITYREQUIREMENTS質(zhì)量要求(1)BBRwillberesponsibleofperformingfabricationoftheGirders,concretedesignmixinaccordancewiththerequirementsfromtheApprovedShopDrawingsandrelevanttechnicalspecificationsfromDPWH(DepartmentofPublicWorksandHighwaysofRepublicofthePhilippines)andstandardsasinforceinPhilippinesandshallsubmititforapproval.HavingobtainedtheapprovalfromboththeContractorandtheProjectConsultanttotheDesignMix,BBRcanuseittoproduceconcretefortheWorksmentionedabove.FortheminimumrequirementstotheConcreteDesignMix,pleaseseetheapprovedshopdrawingsandtechnicalspecifications.BBR將負(fù)責(zé)進(jìn)行大梁,混凝土設(shè)計(jì)組合的制作,按照批準(zhǔn)的制作車(chē)間圖紙和DPWH(菲律賓共和國(guó)公共工程和高速公路部門(mén))的相關(guān)技術(shù)規(guī)范和菲律賓現(xiàn)行標(biāo)準(zhǔn)的要求并提交批準(zhǔn)。獲得承包商和設(shè)計(jì)組合項(xiàng)目咨詢(xún)工程師的批準(zhǔn)后,BBR可以使用批準(zhǔn)的制作車(chē)間圖紙為上述工程生產(chǎn)混凝土。有關(guān)混凝土設(shè)計(jì)組合的最低要求,請(qǐng)參閱批準(zhǔn)的車(chē)間圖紙和技術(shù)規(guī)格。(2)Allmaterialsusedforthispurpose,suchasreinforcingsteelbars,pre-stressingstrands,cement,aggregates,settingretarder,additivesandadmixtures,etc.,tobeusedthroughouttheWorksshallcomplywiththerelevantspecificationsandstandardsmadebyDPWH,andshallsatisfytherequirementsshownintheapprovedshopdrawings.AlltherelevantcertificatesandinformationinclusiveofCertificateofConformity,TestReportandotherinformation,whichcandemonstratetheeligibilitiesofthematerials,shall,intheopinionsoftheContractorandtheConsultant,besubmittedtotheContractorandtheConsultantpriortotheuseofthematerials.用于此目的的所有材料,如在整個(gè)工程中使用的鋼筋、預(yù)應(yīng)力鋼絞線、水泥、骨料、緩凝劑、添加劑和外加劑等,應(yīng)符合DPWH(菲律賓共和國(guó)公共工程和高速公路部門(mén))制定的相關(guān)規(guī)范和標(biāo)準(zhǔn),并應(yīng)滿(mǎn)足批準(zhǔn)的車(chē)間圖紙中明示的要求。所有相關(guān)的證書(shū)和信息,包括符合性證書(shū)、測(cè)試報(bào)告和在承包商和咨詢(xún)工程師的意見(jiàn)中可以證明材料的合格性的其他信息,應(yīng)當(dāng)在使用之前提交給承包商和咨詢(xún)工程師。6.WARRANTY質(zhì)量保修BBRwillgiveaone(1)YearWarrantyforthePrestressedConcreteGirdersfromtheDeliveryDateofthelastPrestressedConcreteGirder.WithinthisPeriod,anydefectsinthePrestressedConcreteGirdersthatmaybeobservedandwhichareduetothenegligenceofBBRwillberectifiedbyBBRatitsownexpense.BBR將從最后一個(gè)預(yù)應(yīng)力混凝土梁的交付日期起對(duì)預(yù)應(yīng)力混凝土梁進(jìn)行一(1)年的保修。在此期間內(nèi),由于BBR的疏忽而導(dǎo)致的預(yù)應(yīng)力混凝土梁的任何缺陷將由BBR保修并承擔(dān)費(fèi)用。7.LOCATIONOFDELIVERY交付地點(diǎn)ProjectSite,Brgy.Pasig,Porac,Pampanga項(xiàng)目現(xiàn)場(chǎng)8.TERMINATION終止合同IfBBRfailstofulfillitsObligationdescribedinClause1,2,3,4and5,CWEmaygivenoticetoBBRtoperformitsObligationswithinaspecifiedreasonabletime.IfBBRfailstocomplywiththementionednotice,CWEshallbeentitledtoterminatetheContract.如果BBR未能履行第1,2,3,4和5條所述的義務(wù),CWE可以通知BBR在指定的合理時(shí)間內(nèi)履行其義務(wù)。如果BBR未能遵守上述通知,CWE有權(quán)終止合同。IfCWEfailstofulfillitsObligationdescribedinClauses1,2and3,BBRmaygivenoticetoCWEtoperformitsObligationswithinaspecifiedreasonabletime.IfCWEfailstocomplywiththementionednotice,BBRshallbeentitledtoterminatetheContract.如果CWE未能履行第1,2和3條所述的義務(wù),BBR可以在規(guī)定的合理時(shí)間內(nèi)通知CWE履行其義務(wù)。如果CWE未能遵守上述通知,BBR有權(quán)終止合同。9.OTHERMATTERS其他事項(xiàng)(l)BBRshallsubmit,within3daysofsigningthecontract,aPerformanceBondissuedbyareputableBank/SuretyCorporationwiththeamountequivalentto30%ofthecontractprice.ThePerformanceBondshallbereturnedtoBBRwithinoneweekafterdeliveryofthelastPrestressedConcreteGirderwithoutanyQualityProblem.BBR應(yīng)在簽訂合同后3天內(nèi)提交由信譽(yù)良好的銀行/擔(dān)保公司發(fā)行的履約保函,金額相當(dāng)于合同價(jià)格的30%。如無(wú)質(zhì)量問(wèn)題,履約保函應(yīng)在交付最后一個(gè)預(yù)應(yīng)力混凝土梁后一周內(nèi)退回BBR。(2)Intheeventofaccidentsoccurredduringtheoperationofthegirderduetostructuralproblemsanddisqualifiedmaterialsforfabrication,BBRshallberesponsiblef
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 六一活動(dòng)密室逃脫活動(dòng)方案
- 六一活動(dòng)競(jìng)拍活動(dòng)方案
- 六一活動(dòng)警營(yíng)活動(dòng)方案
- 六一活動(dòng)遛娃活動(dòng)方案
- 六一社區(qū)義診活動(dòng)方案
- 六一老會(huì)員活動(dòng)方案
- 六一節(jié)目活動(dòng)方案
- 六年級(jí)中隊(duì)活動(dòng)方案
- 藥浴考試試題及答案
- 六盤(pán)水團(tuán)建活動(dòng)策劃方案
- 2024年IMO中國(guó)國(guó)家集訓(xùn)隊(duì)第一階段選拔試題及答案解析
- 《個(gè)人防護(hù)與職業(yè)健康》課件
- 大學(xué)生創(chuàng)業(yè)項(xiàng)目案例路演
- 蘇教版四年級(jí)數(shù)學(xué)下冊(cè)《多邊形的內(nèi)角和》市級(jí)公開(kāi)課教案
- 安徽省蚌埠市2023-2024學(xué)年高一下學(xué)期7月期末考試 化學(xué) 含解析
- 高中物理選擇性必修第二冊(cè)全冊(cè)考試高分突破必刷檢測(cè)卷(基礎(chǔ)版)
- 《陜西省分布的國(guó)家重點(diǎn)保護(hù)野生植物名錄》
- 口腔拔牙手術(shù)知情同意書(shū)
- 【蘇教版】2023-2024學(xué)年六年級(jí)科學(xué)上冊(cè)期末模擬試卷2
- 民族團(tuán)結(jié)先進(jìn)個(gè)人事跡材料3篇匯集
- 2024版標(biāo)前協(xié)議書(shū)-風(fēng)力發(fā)電場(chǎng)工程3篇
評(píng)論
0/150
提交評(píng)論