CQI-12 Coating System Assessment英文資料表格_第1頁
CQI-12 Coating System Assessment英文資料表格_第2頁
CQI-12 Coating System Assessment英文資料表格_第3頁
CQI-12 Coating System Assessment英文資料表格_第4頁
CQI-12 Coating System Assessment英文資料表格_第5頁
已閱讀5頁,還剩42頁未讀 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

PROCESSTABLEE-Electrocoat,,,,

"Allrequirementsgivenbelowaresubordinatetocustomerspecificrequirements.

Thecustomermayhaveadditionalrequirements,e.g.,inspectiontesting,greaterfrequencies,etc.Whenperformingthejobaudit,theauditorshallverifycoaterisconformingtocustomerrequirements.",,,,

,,,,,

Item#,"Related

CSAQuestion#",Category/ProcessSteps,Control,Monitoring

1.0,,Pre-ElectrocoatPaintApplicationPartAppearance,,

E1.1,1.42.11,Incomingpartsareinspectedforcleanlinessand/oruniformphosphatecoating(whenphosphateisused).,Manual,PerControlPlan/LogSheet(1perhour)

2.0,,ElectrocoatLaboratory,,

E2.1,2.14,Laboratoryequipmentiscalibratedandingoodworkingorder.,N/A,

E2.2,2.14,"Laboratorystandardsandreagentsareproperlystored,labeled,andnotexpired.",N/A,

E2.3,2.14,"Laboratoryrecords,internalandexternal,arefiledandaccessibleforreview.",N/A,PerControlPlan/LogSheet(1/shiftminimum)

3.0,,ElectrocoatTank,,

E3.1,"1.4

2.11

2.12","Bathparameters(pH,conductivity,solidcontent,temperature,voltage)arecheckedandadjusted.",Automatic/Manual,PerControlPlan/LogSheet

E3.2,"1.4

1.6

2.11

2.12",Linespeedsetupischecked.,Automatic/Manual,PerControlPlan/LogSheet

E3.3,"1.4

2.11

2.12",Linespeedisverified.,Manual,Once/weekminimum

E3.4,"1.4

2.11

2.12","Thereiscirculationanditismonitored.(flowmeter,pressuregage)",Automatic/Manual,PerControlPlan/LogSheet(1/shiftminimum)

E3.5,"1.4

2.11

2.12",Bagfilterpressuresaremonitored.Bagschangedwhenpsidifferential.>5-10PSI.,Automatic/Manual,PerControlPlan/LogSheet(1/shiftminimum)

E3.6,"1.4

2.11

2.12",Flowdirectionischecked(formonorailsystem).,Manual,PerControlPlan/LogSheet(1/shiftminimum)

E3.7,"1.4

2.11

2.12",Flowovertheweirischecked.,Manual,PerControlPlan(1/shiftminimum)

E3.8,"1.4

2.11

2.12",Bathischeckedformicrobialcontamination.,Manual,PerControlPlan/LogSheet(1/perweekminimum)

E3.9,"1.4

2.11

2.12",IncomingDI/ROwaterischeckedforcleanliness.(conductivity),Automatic/Manual,PerControlPlan/LogSheet(1/shiftminimum)

E3.10,"1.4

1.17

2.11

2.12",Paintracksarebeingmaintained.,Automatic/Manual,Asneeded

E3.11,"1.4

1.17

2.11

2.12",Thereisapaintrackmaintenanceschedule.,Manual,Required

E3.12,"1.4

1.17

2.11

2.12",Thereisatankcleanupschedule.,Manual,Required(1/yearminimum)

4.0,,AnolyteSystem,,

E4.1,"1.4

2.11

2.12",Theanolytesolutionisbeingcontrolledwithintherequiredconductivitylimits.,Automatic/Manual,PerControlPlan/LogSheet(1/shiftminimum)

E4.2,"1.4

2.11

2.12",Theconductivityreadingontheanolytetankhasbeenconfirmedinthelaboratory.,Automatic/Manual,PerControlPlan/LogSheet1/week

E4.3,"1.4

2.11

2.12",ThepHoftheanolytesolutionhasbeenchecked.,Automatic/Manual,PerControlPlan/LogSheet(1pershift)

E4.4,"1.4

2.11

2.12",Anodeshavebeeninspected.,Manual,PerControlPlan/LogSheet(1persixmonths)

E4.5,"1.4

2.11

2.12",Theanolytesolutionisbeingcirculatedtoeachcell.,Automatic/Manual,PerControlPlan/LogSheet(1/shiftminimum)

E4.6,"1.4

2.11

2.12",Dumpandcleanscheduleforanolytebeingmaintained.,Manual,PerControlPlan/LogSheet

E4.7,"1.4

2.11

2.12",Amperagedrawhasbeencheckedoneachanode.,Automatic/Manual,PerControlPlan/LogSheet

5.0,,Rectifier,,

E5.1,"1.4

1.6

2.11

2.12",Thepropervoltageisbeingusedfortheloadsize.,Manual,perEquip.Mfg.

E5.2,"1.4

2.11

2.12",Therampuptimetofullvoltagehasbeenverified.,Automatic/Manual,PerControlPlan/LogSheet(1pershift)

E5.3,2.10,Thereisasafetybeacontoalertpersonnelwhensystemisenergized.,,

E5.4,"1.4

1.17

2.11

2.12",Therippleoftherectifierhasbeencheckedbyanapprovedelectrician.,Automatic/Manual,PerControlPlan/materialsupplier

6.0,,RinseSystem,,

E6.1,"1.4

2.11

2.12",Immersionrinsetanksareoperatingattheproperlevelsandtanksarebeingagitatedcorrectly.,Automatic/Manual,PerControlPlan/LogSheet(1/shiftminimum)

E6.2,"1.4

2.11

2.12",Thereissufficientpermeatesuppliedtotherinse.,Automatic/Manual,PerControlPlan/LogSheet(1/shiftminimum)

E6.3,"1.4

2.11

2.12",ThepHandconductivityoftherinsehavebeenrecorded.,Manual,PerControlPlan/LogSheet(1/shiftminimum)

E6.4,"1.4

2.11

2.12",Thereismicrobialtestingofrinses.,Manual,PerControlPlan/materialsupplier

E6.5,"1.4

2.11

2.12",Theultrafiltersareoperatingatproperpressuresandbagfiltersarebeingused.Whatsizebags?,Automatic/Manual,PerControlPlan/LogSheet(1/shiftminimum)

E6.6,"1.4

1.17

2.11

2.12",Rinseshavebeenclean

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論