




版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、COCOMO SCORMInteractive Courseware Project Cost Modeling,Roger Smith & Lacey Edwards SPARTA Inc. Orlando, Florida and Lacey.E,COCOMO-SCORM Project: Proposed Solution,“Every complex project requires project managers and sponsors to calculate the expected level of effort, duration, and cost of the pro
2、ject. Developing web-based content to the Sharable Content Object Reference Model (SCORM) is complex enough that an algorithm is necessary to assist both the government and developers in estimating the size of the project. SPARTA and Anteon propose to create an interactive courseware estimation tool
3、 based on widely used Instructional Systems Design (ISD) methodologies and on the principles contained in the well-established and widely accepted COCOMO II model for software project estimation.”,Proposed Technical Concept:,Interactive Courseware Estimation Tool,Development and Test Cost Estimates,
4、COCOMO ISD,Project Description,Create an interactive project estimation tool for ISD/SCORM content Algorithmic foundation for the tool is the COCOMO II algorithm developed for software projects by the research team at the University of Southern California and led by Barry Boehm ISD methodology estim
5、ated will be the ADDIE model developed at Florida State University and adopted by the U.S. Armed Services Resulting algorithm and tools will estimate the person-months required to create a SCORM conformant learning product Dollar costs can be derived outside of the model by applying industry or spec
6、ific company labor rates,COCOMO Model Family,COQUALMO 1998,COCOMO 81 1981,COPROMO 1998,COSoSIMO 2004,Legend: Model has been calibrated with historical project data and expert (Delphi) data Model is derived from COCOMO II Model has been calibrated with expert (Delphi) data,COCOTS 2000,COSYSMO 2002,CO
7、RADMO 1999,iDAVE 2003,COPLIMO 2003,COPSEMO 1998,COCOMO II 2000,DBA COCOMO 2004,COINCOMO 2004,Security Extension 2004,Costing Secure System 2004,Software Cost Models,Software Extensions,Other Independent Estimation Models,Dates indicate the time that the first paper was published for the model,COCOMO
8、 II Tool Example,Users Perspective,COCOMO II Modeling Methodology,ADDIE Process,Job/Task Analysis Needs Analysis Learning Analysis Situation Analysis Technical Analysis,Design Plan Instructional Media Design Report SCORM Plan,Storyboards Programming Multimedia Testing,Trials Pilot tests,Reliability
9、Validation Training Plan,COSCOMO Drivers(27 Input Variables),Size Source Lines of Code (SLOC) Design Modification (DM) Code Modification (CM) Integration (IM) Assessment (AA) Understanding (SU) Unfamiliarity (UNFAM) Scale Drivers Development Flexibility (FLEX) Process Maturity (PMAT) Precedentedness
10、 (PREC) Arch/Risk Resolution (RESL) Team Cohesion (TEAM) Product Effort Multipliers (EM) Required Reliability (RELY) Product Complexity (CPLX) Required Reuse (RUSE) Documentation (DOCU),Platform EM Platform Volatility (PVOL) Bandwidth (BAND) Personnel EM Senior Capability (SCAP) Developer Capability
11、 (DCAP) Personnel Continuity (PCON) Applications Experience (APEX) Platform Experience (PLEX) Development Tools Experience (DTEX) Project EM Lifecycle Tools (LIFE) Multisite Development (SITE) Required Development Schedule (SCED),Quantitative Size Variables,EM Effect on Project,Course Hours,Project
12、Cost,15 Effort Multipliers Set to Nominal,Qualitative Project Variables,Nominal/Standard Levels,Effort Multipliers,Scale Drivers,EM Effect on Project,Course Hours,Nom. Cost,15 Effort Multipliers Other Than Nominal,Est. Cost,Data Collection Form,(see Excel file for entire form),COSCOMO Estimates,* Su
13、rvey was not completed. All remaining variables were estimated.,Defense Nuclear Weapons School,Building PRED(30) for COSCOMO,0%,% Variance of Estimated Value,-30%,+30%,Total Project Cost (PM),DNWS -3.8%,EHA -20%,ALC +333%,6,24,78,Reliability = PRED(30),Reliability of COCOMO family of models is often
14、 measured by the percentage of test cases that it will estimate within 30% of the actual project costs e.g. If a project requires 300 person-months to complete, then its PRED(30) range would be (210 to 390) If the model estimates 70% of its test cases within this range then the models PRED(30) = 70%
15、 COCOMO Family Model Levels COCOMO II: PRED(30) = 64% COSYSMO: PRED(30) = 56% COSCOMO: PRED(30) = unknown at this time,Delphi Calibration Survey,Using Delphi Method to gather independent opinions about the level of effort associated with each setting on each variable. Collect individual responses Ca
16、lculate group average Present averages to each person and allow them to change their responses if they would like Convene group work session to settle on acceptable values Round 1 of Delphi Conducted Via Private Survey Round 2 Conducted in Seminar Form,Conclusion,COCOMO II has been modified to inclu
17、de variables that are important to SCORM courseware developers Variable weights are being adjusted by Delphi surveys of experts Model is being calibrated through the collection of historical project information Current results show that this approach is feasible It is to early to determine the degree of success that
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- ××超市某超市員工招聘制度
- 網絡安全保障協(xié)議和責任界定
- 汽車行業(yè)購車資格及經濟實力出資證明書(6篇)
- 2025年自動造型線項目申請報告
- 法律邏輯學案例分析與解析手冊
- 2025年橋架項目提案報告
- 冬日雪景抒寫作文9篇
- 2025年保密局公務員錄用考試申論試卷
- 建筑設計優(yōu)化服務協(xié)議
- 2025年大學輔導員招聘考試:學生社團管理案例分析歷年真題解析匯編
- 數(shù)據倉庫安全防護策略-全面剖析
- 2024-2025學年慶陽市數(shù)學五下期末質量檢測模擬試題含答案
- 2025年中考第一次模擬考試地理(青海卷)(全解全析)
- 鋼鐵企業(yè)ESG實踐與創(chuàng)新戰(zhàn)略研究報告
- 摩擦起電機理、調控與應用研究的現(xiàn)狀及展望
- 私募股權投資基金(雙GP)合作框架協(xié)議書范本
- 顯微根尖手術治療
- 電網工程設備材料信息參考價(2024年第四季度)
- 高級餐飲食品安全管理員技能鑒定理論考試題庫500題(含答案)
- 《水性涂料產品介紹》課件
- 數(shù)據中心運維服務投標方案(技術標)
評論
0/150
提交評論