免費(fèi)預(yù)覽已結(jié)束,剩余1頁(yè)可下載查看
下載本文檔
版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
北京建筑工程學(xué)院土木工程專業(yè)畢業(yè)設(shè)計(jì)(論文) 第 5 頁(yè)摘要本工程為公寓式辦公樓 所謂“公寓式辦公樓”,是指單元式小空間劃分、每個(gè)單元平均建筑面積不大于150平方米、有獨(dú)立衛(wèi)生設(shè)備的辦公建筑。此種物業(yè)因面積較小且相對(duì)獨(dú)立,較適合小型公司辦公,但它仍屬辦公樓而非住宅。一、工程概況: 1、工程所在地:豐臺(tái)區(qū)靛廠路 2、工程名稱:錦鼎商務(wù)大廈 3、建筑面積:12900平方米 4、層數(shù):地上9層,地下2層 5、層高:首層層高為4米,二層至九層層高均為3.2米,室內(nèi)外高差0.45米。6、外圍護(hù)墻采用250mm陶??招拇u砌塊墻體(外保溫),內(nèi)墻采用150mm陶??招拇u砌塊墻體7、 結(jié)構(gòu)體系:框架-剪力墻8、 主要建筑材料:鋼筋、混凝土、砂漿、陶??招拇u砌塊9、 防火要求:采用高層民用建筑設(shè)計(jì)防火規(guī)范GB50045-95(2001年版)。建筑分類為二類,地上地下均為1級(jí) 電梯:設(shè)四部液壓電梯,其中一部為消防電梯, 樓梯:設(shè)兩部樓梯,均為封閉樓梯二、建筑設(shè)計(jì) 1、建筑設(shè)置三個(gè)出入口,其中西側(cè)主出入口與北側(cè)出入口均設(shè)有無(wú)障礙坡道 2、平面布置:首層設(shè)置庫(kù)藏室、資料室、接待室、廳室、安保監(jiān)控室、物業(yè)管理,二層至九層為辦公區(qū)。 3、中型會(huì)議室按照無(wú)桌椅,即0.8平米每人,70人使用來(lái)設(shè)計(jì);小型會(huì)議室按照有桌椅,即1.8平米每人,30人使用來(lái)設(shè)計(jì) 4、設(shè)備專業(yè)用房每層1間,20 -30 m 5、使用人數(shù)規(guī)??刂疲喊?00人,男女比例7:3三、結(jié)構(gòu)設(shè)計(jì) 結(jié)構(gòu)形式現(xiàn)澆鋼筋混凝土框架剪力墻結(jié)構(gòu); 樓蓋結(jié)構(gòu)樓蓋及屋蓋采用普通鋼筋混凝土現(xiàn)澆樓板; 1、結(jié)構(gòu)計(jì)算內(nèi)容 (1) 荷載計(jì)算。 (2) 樓蓋與屋蓋設(shè)計(jì)。 (3) 地震作用與綜合框架與剪力墻的剛度計(jì)算。 (4) 地震作用計(jì)算與位移驗(yàn)算。 (5) 地震作用下綜合框架與剪力墻內(nèi)力計(jì)算,地震作用一榀框架一榀內(nèi)力 計(jì)算。 (6) 重力荷載作用下框架內(nèi)力計(jì)算。 (7) 框架內(nèi)力組合。 (8) 框架梁與柱配筋計(jì)算。 (9) 剪力墻內(nèi)力與配筋計(jì)算。 (10) 基礎(chǔ)設(shè)計(jì)。關(guān)鍵詞:公寓式辦公樓、框架-剪力墻、混凝土、無(wú)障礙、現(xiàn)澆AbstractThis project is the apartment-office building The so-called apartment building refers to the space divided into small units, whose average floor area is not more than 150 square meters with every unit , and an office building with separate sanitary facilities. This architecture form is more suitable for small companies because of the smaller and relatively independent.But it is still an office buildings rather than dwelling house. First, the profile of the project: 1, Location: Dian-Chang Road, Fengtai District. 2, Name: Jin-Ding Commercial Building. 3, The architectural area: 12,900 square meters. 4, Rise: 9 on the ground floor, the ground floor of 2 storey. 5, story height: the first story is 4 meters high, and others are 3.2 meters high. The difference between indoor and outdoor are 0.45 meters high. 6, The building envelope outside is the ceramsite hollow block of 250 thickness (the insulation outside), and the interior walls is 150. 7, The structural system: a frame-sheer wall structure. 8, The main construction materials: steel, concrete, mortar, ceramic hollow brick block. 9, The fire safety requirements: the fire safety in the design of tall buildings of GB50045-95 (2001). The Classified of the building is II, and the fire safety requirement of the whole building is the first. Elevator: four hydraulic elevators, one of them is for the firemans lifts, Staircase: two for the stairs, all of them are the closed stairs. Second, the architectural design 1, Three access, of which is the main in the west side ,which is equipped with barrier-free ramp and the same as the door in the northern side. 2, Layout: There are storehouse, reference room, reception room, hall, security and supervisor room, property management Room, from two floor to nine are offices.3, Medium-sized conference room which except for tables and chairs. That is 0.8 square meters per person and 70 people in all; Small conference rooms which in accordance with tables and chairs. That is 1.8 square meters per person and 30 people in all. 4, There is an equipment room on each floor, which is ahout 20 to 30 square meters 5, the scale of people : 600 people, and male to female ratio is 7:3 .Third, the structural design Structure style: the frame-sheer wall of the cast-in-place reinforced concrete structure; Floor construction : the floor and roof are cast-in-place reinforced concrete floor slab; 1, the structure calculations (1) Load computation. (2) The floor and roof design. (3) The role and the Integrated Framework for the earthquake and the stiffness of shear wall calculation. (4) The role of earthquake displacement calculation and checking. (5) under the Integrated Framework for the earthquake and the wall of internal forces. (6) Gravity loads calculated under the framework of internal forces. (7) Combination of the framework of internal forces. (8) Frame b
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 幼兒教師的教學(xué)故事六篇
- 全國(guó)新型電力系統(tǒng)(配電自動(dòng)化)職業(yè)技能競(jìng)賽參考試題庫(kù)500題(含答案)
- 《預(yù)防未成年人犯罪法》知識(shí)考試題庫(kù)80題(含答案)
- 大學(xué)衛(wèi)生學(xué)課件
- 汽車租賃合同詳細(xì)條款正規(guī)范本
- 滄州房屋租賃合同
- 棉花運(yùn)輸合同范本
- 標(biāo)準(zhǔn)的員工勞動(dòng)合同
- 大數(shù)據(jù)分析平臺(tái)建設(shè)及運(yùn)營(yíng)合同
- 海外房產(chǎn)銷售代理合同范本
- 護(hù)理人文知識(shí)培訓(xùn)課件
- 建筑工程施工安全管理課件
- 2025年春新人教版數(shù)學(xué)七年級(jí)下冊(cè)教學(xué)課件 7.2.3 平行線的性質(zhì)(第1課時(shí))
- 安徽省合肥市2025年高三第一次教學(xué)質(zhì)量檢測(cè)地理試題(含答案)
- 2025年新合同管理工作計(jì)劃
- 光伏項(xiàng)目安全培訓(xùn)課件
- 2023年湖南省張家界市中考數(shù)學(xué)真題試卷附答案
- 《愛(ài)麗絲漫游奇境》
- 全面解讀新能源法律風(fēng)險(xiǎn)與應(yīng)對(duì)措施
- 民法學(xué)詳細(xì)教案
- 浙江省杭州市2023年中考一模語(yǔ)文試題及答案
評(píng)論
0/150
提交評(píng)論