




已閱讀5頁(yè),還剩1頁(yè)未讀, 繼續(xù)免費(fèi)閱讀
版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
Breaking & Reinstatement Concrete Road m破復(fù)水泥路面Breaking & Reinstatement Tarmacadam road m破復(fù)柏油路面Breaking & Reinstatement Free stone road m破復(fù)碎石路面Breaking & Reinstatement Concrete Brick Road m破復(fù)水泥花磚路面Breaking & Reinstatement Brick Road m破復(fù)花磚路面Breaking & Reinstatement Stone Step 1 pcs破復(fù)石臺(tái)階1處Breaking & Reinstatement Concrete Drain 1pcs破復(fù)水泥排水溝1處Breaking & Reinstatement Stone Drain 1pcs破復(fù)石質(zhì)排水溝1處Fixing 100mm Galvanized steel pipe m along side of brige 沿橋側(cè)釘固100mm鋼管 mProtectShield:2(W) x3(L)m護(hù)坡2(寬) x3(長(zhǎng))ProtectBank:2(H)m護(hù)坎2(高)mView of Occupied Pipe管孔占用圖Installing OF Cable15m and Reserving 20m in Eq. Room安裝進(jìn)局光纜15m,局內(nèi)光纜預(yù)留20mTermitarium白蟻窩Thrust boring-100mm Galvanized steel pipe頂管100mm 33/44mm HDPE Pipe Protection33/44mm HDPE管保護(hù)100mm Galvanized Steel Pipe Protection100mm鋼管保護(hù)Draw up100mm Galvanized steel pipe 1 Pcs引上100mm鋼管1根2*28/32mm PE Sub-duct28/32mm 子管兩根Concrete Wrap m水泥包封 mPunching 1 Concrete Wall Hole打穿一個(gè)水泥墻洞End AA端Newly Duct新建管道channel of building樓內(nèi)豎井installation plastic cable trough along wall沿墻安裝塑料線槽plastic warning tape塑料警示帶OF Cable trench光纜溝2*28/32mm PE Sub-duct2根28/32mm子管parking lots停車場(chǎng)注:除以上特殊說(shuō)明,本圖中安裝50mm鋼管均包括布放一根28/32塑料子管;安裝80mm鋼管均包括布放2根28/32塑料子管。 Note: 128/32mm subduct to be used in 50mm Galvanized steel pipe and 228/32mm subduct in 80mm Galvanized steel pipe in the diagram except special statement.Workload TableSNDescriptionUnit1Route Obstacle & bush Cleaning清理路由障礙及灌木叢2Breaking & Reinstatement Road Surface破復(fù)路面2.1Duct trench管道溝2.1.1Concrete road surface 水泥路面2.1.2Tarmacadam road surface 柏油路面2.1.3Brick road surface 花磚路面2.1.4Concrete brick road surface 水泥花磚路面2.2Direct Buried Trench(W=0.4m)直埋挖溝2.2.1Concrete road surface 水泥路面2.2.3Tarmacadam road surface 柏油路面2.3Handhole(Joint Handhole)(L=0.9m,W=0.85m)人孔2.3.1Concrete road surface 水泥路面2.3.2Free stone road surface碎石路面2.3.3Tarmacadam road surface 柏油路面2.3.4Concrete brick road surface 水泥花磚路面2.3.5Brick road surface 花磚路面3Breaking & Reinstatement Road ditch (Hard rock)破復(fù)路側(cè)溝3.1Stone drain石質(zhì)水溝3.2Concrete drain水泥水溝3.3Concrete wall水泥墻3.4Concrete floor hole水泥樓層洞3.5Concrete steps水泥臺(tái)階4Excavation & Backfill 開(kāi)挖及回填4.1Duct Trench (depth from the top of the pipe)管道溝soil with gravel (1.0m)砂礫土4.2Direct buried Trench直埋溝4.2.1normal soil (D=1.0m)普通土(D1.0m)4.2.2soil with gravel (D=0.8m)砂礫土(D0.8m)4.2.4Hard rock (D=0.6m)硬石5Spread the thin soil in the Rock Ditch巖石溝鋪細(xì)沙6Installation of HDPE PIPE FOR Newly Duct新建管道安裝HPDE管6.1Installation of 4* 33/40mm HDPE pipe (4 way ducts)安裝4孔33/40mmHDPE管(4孔管道)6.2Installation of 2* 33/40mm HDPE pipe (2 way ducts)安裝2孔33/40mmHDPE管(2孔管道)7Installation of GI Pipe for Newly Duct (Breaking & Reinstatement Road across main road and bridge and culvert and Thrust boring- across main road or railway)新建管道安裝鋼管(用于穿越主要公路、橋梁,以及頂管過(guò)主要公路及鐵路)7.1Breaking & Reinstatement Road ,Installation of Galvanized steel pipe,D=100mm破復(fù)路面,安裝100mm鋼管保護(hù)7.2Thrust boring-Galvanized steel pipe,D=100mm (2 way ducts)頂管100mm,(2孔管道)8In and out Optical Fiber Cable Protection 進(jìn)出局光纜保護(hù)8.1Installation of 4* 33/40mm HDPE pipe (4 way ducts)安裝4* 33/40mm HDPE管(4孔管道)8.2Installation of 2* 33/40mm HDPE pipe (2 way ducts)安裝2* 33/40mm HDPE管(2孔管道)8.3Installation of 1* 33/40mm HDPE pipe (1 way ducts)安裝1* 33/40mm HDPE管(1孔管道)8.4Breaking & Reinstatement Road ,Installation of Galvanized steel pipe,D=100mm破復(fù)路面,安裝100mm鋼管保護(hù)8.5Breaking & Reinstatement Road ,Installation of Galvanized steel pipe,D=80mm, Including 2*28/32mm PE Sub-duct破復(fù)路面,安裝80mm鋼管保護(hù),穿2根28/32mm PE子管8.6Installation of Galvanized steel pipe,D=80mm(along wall or ground)沿墻或地面安裝80mm鋼管8.7Installation of Galvanized steel pipe,D=100mm(along wall or ground)沿墻或地面安裝100mm鋼管8.8Draw up steel pipe, D=80mm,Including 2*28/32mm引上80mm鋼管,穿放2根28/32mm子管8.90 Draw up steel pipe, D=100mm,Including 3*28/32mm引上100mm鋼管,穿放3根28/32mm子管8.10 installation 1*28/32mm HDPE pipe(along wall)沿墻安裝1孔28/32mm HDPE管8.11 installation 1*28/32mm HDPE pipe in the chanel of building沿豎井安裝1孔28/32mm HDPE管8.12installation 1*28/32mm HDPE pipe 安裝1孔28/32mm HDPE管8.13installation plastic cable trough along wall沿墻安裝塑料線槽8.14Concret envelop for 80mmGalvanized steel pipe Including 2*28/32mm包封80mm鋼管,內(nèi)穿2個(gè)子管9Cleaning of existing Handhole清理現(xiàn)有管道10Installation Handhole (LxWxD=0.9m x0. 85m x 1.0m)安裝手孔11 installation of Direct Buried Optical Fibre cable including marker post(GYTA53-24B1) (Including Supply of Accessary Materials)直埋光纜的敷設(shè),包括標(biāo)石(GYTA53-24B1)(包括備用材料)11.1In plain平原地區(qū)11.2In city or in hill城鎮(zhèn)或丘陵地區(qū)11.3installation of Duct O.F. Cable(GYTA53-24B1)敷設(shè)管道光纜(GYTA53-24B1) 11.4installation of Duct O.F. Cable(GYTA-36B1)敷設(shè)管道光纜(GYTA53-36B1)12O.F. Cable Splice & Test(24 fibers)光纜接頭盒及測(cè)試(24芯)12.1Duct O.F. Cable管道光纜12.2Direct Buried O.F. Cable 直埋光纜12O.F. Cable Splice & Test(36 fibers)光纜接頭盒及測(cè)試(36芯)12.1Duct O.F. Cable管道光纜13O.F. Cable Terminating &Test 光纜終端盒及測(cè)試O.F. Cable Termination &Test(36 fibers)光纜終端盒及測(cè)試(36芯)O.F. Cable Termination &Test(24 fibers)光纜終端盒及測(cè)試(24芯)14Relay section cable tests (36fibers)中繼段測(cè)試(36芯)Relay section cable tests (24fibers)中繼段測(cè)試(24芯)15Direct Buried Optical Fiber Cable Protection 直埋光纜的保護(hù)15.1Breaking & Reinstatement Road ,Installation of Galvanized steel pipe,D=50mm, Including 1*28/32mm PE Sub-duct破復(fù)路面,安裝50mm鋼管,內(nèi)穿1根28/32mm PE子管15.2Breaking & Reinstatement Road ,Installation of Galvanized steel pipe,D=80mm, Including 2*28/32mm PE Sub-duct破復(fù)路面,安裝80mm鋼管,內(nèi)穿2根28/32mm PE子管15.3Thrust boring-Galvanized steel pipe,D=80mm Thrust boring-Galvanized steel pipe,D=80mm,Including 2*28/32mm PE Sub-duct頂管安裝80mm鋼管,內(nèi)穿2根28/32mm PE子管15.4installation of 1*33/40mm HDPE pipe安裝1根33/40mm HDPE管15.5Draw up steel pipe, D=50mm,Including 1*28/32mm PE Sub-duct安裝50mm引上鋼管,內(nèi)穿1根28/32mm PE 子管15.6Concret envelop for 80mm steel pipe 包封80mm 鋼管15.7Protection of protect-bank護(hù)坎15.8installation of Green plastic warning tape in OFC cable trench光纜溝安裝塑料警示帶8. Main Material ListSee table 8.1 for details.Table 8.1 Metropolitan Network of Kampala Main MaterialsNo.目錄TypeUnitQty.1OFCGYTA53-24B1Km光纜2OFCGYTA53-36B1Km光纜3Splicing Box(including splicing materials)24fibersPcs接頭盒(包括接頭材料)4Splicing Box(including splicing materials)36fibersPcs25O.F. Cable Termination(Including accessories)24fibersPcs光纜終端盒(包括備件)6O.F. Cable Termination(Including accessories)36fibersPcs497pigtail 3mPcs單頭尾纖8FCTC FlangePcs法蘭盤9Fixed Tape in NylonPiece尼龍?jiān)鷰?0Plastic Clip to clench cable(Including steel nails)Piece塑料光纜卡子(包括鋼釘)11Plastic Clip to clench PE Soft Pipe (Including steel nails)Piece330012Plastic Cable Trough(Including steel nails)M塑料線槽13warning tapEm警示帶14PE Soft Pipe32/28mmmPE軟管15HDPE Pipe33/40mmmHEPE管16Plastic adhesive taperoll塑料膠帶17Galvanized Iron Wire1.5mmKg鍍鋅鐵線18Galvanized Iron Wire3.0mmKg419Galvanized Iron Wire4.0mmKg49220Galvanized Jointi
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 臨床類風(fēng)濕疾病全程管理要點(diǎn)
- 中考英語(yǔ)-構(gòu)詞法(講練)(解析)
- 數(shù)字智慧方案食品安全追溯方案
- 2024年高速型數(shù)控銑床或數(shù)控仿形銑床投資申請(qǐng)報(bào)告代可行性研究報(bào)告
- 供電防護(hù)員練習(xí)試題(三)
- 職業(yè)資格-交通工程真題庫(kù)-5
- 職業(yè)資格-房地產(chǎn)經(jīng)紀(jì)綜合能力真題庫(kù)-10
- 明確方向2025年財(cái)務(wù)管理考試試題及答案
- 單招高頻試題及答案
- 高考數(shù)學(xué)試題及答案
- 投資項(xiàng)目評(píng)估智慧樹(shù)知到課后章節(jié)答案2023年下中央財(cái)經(jīng)大學(xué)
- 物資申購(gòu)管理制度范本(7篇)
- 2017電網(wǎng)運(yùn)行風(fēng)險(xiǎn)預(yù)警管控工作規(guī)范
- SL631-637-2012-水利水電工程單元工程施工質(zhì)量驗(yàn)收評(píng)定標(biāo)準(zhǔn)
- 科研助理服務(wù)合同
- 涉詐風(fēng)險(xiǎn)賬戶審查表
- 教科版六下科學(xué)全冊(cè)課時(shí)練(含答案)
- 年代小說(shuō)先鋒小說(shuō)
- 【超星爾雅學(xué)習(xí)通】世界建筑史網(wǎng)課章節(jié)答案
- (52)-皰疹性咽峽炎小兒推拿探秘
- 土建施工員培訓(xùn)課件
評(píng)論
0/150
提交評(píng)論