


全文預覽已結束
下載本文檔
版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
光伏項目收資清單Required Information List for PV Solar Project一、 氣象資料 Meteorology Information1、氣象站地理位置(最好提供坐標)、海拔高度、觀測記錄數(shù)據(jù)的輻射儀器型號及記錄方式、位置、高程、場地周圍環(huán)境、周圍遮蔽情況,以及建站以來站址、輻射觀測儀器及其周圍環(huán)境變動的時間和情況等。Submit Location (Geographic coordinates best) and altitude of the meteorological station; type, record method, location, altitude, environment, shielding situation of the radiation measurement instrument which is used to observe and record radiation data. If the meteorological station has moved, the radiation measurement instrument has been changed, or the environment has changed, please submit change time and details of them.2、氣象站長系列數(shù)據(jù)Measurement Data during many years from the meteorological station(1)多年歷年各月太陽輻射數(shù)據(jù)資料(含直接輻射、散射輻射、總輻射資料、日照時數(shù));Monthly radiation data (including direct radiation, diffuse radiation, total radiation and sunshine duration) over the years.(2)多年平均氣溫、極端最高氣溫、極端最低氣溫、晝最高氣溫、晝最低氣溫,多年各月平均氣溫;Yearly average temperature, extreme highest temperature, extreme lowest temperature, highest temperature in the day time and lowest temperature in the day time.Monthly average temperature over the years.(3)多年平均降水量和蒸發(fā)量;Yearly average precipitation amount and evaporation amount over the years.(4)多年最大凍土深度和積雪厚度;Yearly maximum frozen soil depth and maximum snow cover depth over the years.(5)多年平均風速、多年極大風速及其發(fā)生的時間、主導風向;Yearly average wind speed, maximum wind speed, its occurrence time and the predominant wind direction over the years.(6)30年災害性天氣資料,如沙塵、雷電、暴雨、冰雹等。Damaging weather information (like sandstorm, thunder and lightning, rainstorm, hail etc.) over the last 30 years.二、 電氣資料Electrical Information1、當?shù)仉娏ο到y(tǒng)現(xiàn)狀及規(guī)劃: Present situation and planning of the local power system:(1) 所在地區(qū)電力系統(tǒng)現(xiàn)狀概況及發(fā)展規(guī)劃,包括電網(wǎng)現(xiàn)狀圖、規(guī)劃圖;General present situation and development planning of the local power system, including drawings of the existing power grid and planning drawings of power grid.(2) 電網(wǎng)地理接線圖,電源結構及負荷情況等;Power grid geographical line diagram;(3) 所在地區(qū)變電站一次主接線圖。Primary electrical single line diagram of the substation in the area where the PV station is located.2、擬接入廠區(qū)變電站的電壓等級、名稱、主接線圖,系統(tǒng)最大、最小運行方式下的短路容量、最大負荷、平均負荷、最小負荷及出現(xiàn)季節(jié)月份,主變壓器型號、參數(shù),斷路器參數(shù),距離光伏電站直線距離。Voltage class, name and single line diagram of the PV plant substation which will be built to connect the existing gridShort circuit capacity, maximum load, average load, minimum load and occurrence season and month under the maximum/minimum operational mode of electric power system.Type and parameters of the main transformer, parameters of the circuit-breaker and the distance between the substation and the PV Power Plant.三、 場區(qū)資料Site Information1項目所在位置地理坐標及場址范圍地理坐標Geographic coordinates of the project site, and the geographic coordinates of the key points which are used to determine the site range;2實測地形圖(如平坦地區(qū)1:2000,丘陵地區(qū)1:1000,山地1:500)Measured topographic maps (such as flat area 1:2000, hilly area 1:1000, mountain 1:500)3場址自然條件,場區(qū)周圍環(huán)境,包括:場區(qū)周邊工業(yè)企業(yè)、居民區(qū),與城市規(guī)劃的關系,對外交通條件,包括公路、鐵路和水路,附近有無文物保護區(qū)、軍事設施。Natural conditions and environment situation of the site: including industrial area and residential area near the site, the relation between the site and the city planning, transportation condition of the access to the site (including roads, railway and waterway), and whether there are cultural relics protection area and military facilities;4場址區(qū)域洪水評價分析報告。Evaluation and analysis reports of the flood in the site area;5場址土地征(租)地費。Lease fee of the site land;7地震安全性評價(地震基本烈度9度以上)。Seismic risk evaluation (when seismic basic intensity is above 9 degree in GB codes)8、場址區(qū)工程地質資料(地質、地貌、地下水的深度、水文資料、凍土層厚度、接地電阻);Engineering geology information of the site(geology, landforms, underground water level, hydrology information, frozen soil depth and earthing resistor);9、土地利用規(guī)劃、已查明重要礦產資源分布、自然環(huán)境保護、軍事用地、文物保護等敏感區(qū)的
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 新型鄰苯二甲腈樹脂合成及其改性環(huán)氧樹脂性能研究
- 健康評估實驗報告
- 冬季安全教育班會
- 生動活潑健康課件
- 《社會財務共享服務實務》課件-智能報稅
- 預防疾病課件
- 行政管理制度培訓
- 《航空渦輪發(fā)動機》課件-27典型高涵道比渦扇發(fā)動機起飛推力設置與發(fā)動機環(huán)境污染介紹
- 勞動促成長健康伴我行
- 預算工程師課件
- 商業(yè)保理行業(yè)營銷策略方案
- 《掃描電子顯微鏡》課件
- 水利水電工程施工截流設計說明書
- 變速箱廠總平面布置設計設施規(guī)劃與物流分析課程設計
- 兒科高級生命支持(NEW)
- 婦科門診工作流程
- 鋼筋加工廠安全教育培訓
- 高中數(shù)學研究性學習報告
- 學校章程樣稿
- 天然藥物提取與分離技術
- GB/T 18255-2022焦化粘油類產品餾程的測定方法
評論
0/150
提交評論