




全文預(yù)覽已結(jié)束
下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
Highway engineering change reasonanalysis and cost of the project of influenceabstract : in The implementation stage because of highway engineering design factors,environmental factors,The influence of variousKeywords : engineering change,reason,costDue to the highway project period,long,line,So broad in construction of various causes by the engineering change is inevitableengineering change could lead to increase of construction cost or Time limit of the owner and the contractor,between the claim will claim and theowner of change and the causes of the costand when the owner change engineering bidding of construction conditions of commitment .santongyiping referred to in The preceding paragraph,The engineering tight finish,delay purpose will increase The contracters sees can increase content of missing the contract cost,and the owners requirements,And shortcen delivery of finished ahead of the original connectons And the owner of the contract with the materials or equipment supply for the category And quantity,cause cost increase or decrease,And the oothe design of change and the causes of the costThe design adopts the new standard,new technology,new technology,to replace the original design of the project,And put to use more)和the requirements of the project,The main structure change shape And size change etc,make the cost increase,And design personneltthe contractor to change and cause the influence . costThe contractor is unable to perform The contract Or cant completed ly,The contractor shall take remedial measures proposed change,This kis and puts forward such reasons,And more economical and reasonable,optimizing design scheme,this kind of change if owner recognized this kind of other changes generally does not make owner cost increase,but will make The contractor under loss,Due to the contractor technologythe supervisor of change and the causes of the costSupervision by the owner,Commissioned by the cause of the change of the owner or expenses directly influence the cost . 1 and supervision engineencethe site supervision engineers in actual situation in the contract and the technical specific a Tion for the design,according to local modificationand supervision engineers work and coordination ability damage caused by lack of rework,Engineering cost change w
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 貨運(yùn)保險(xiǎn)行業(yè)深度調(diào)研及發(fā)展項(xiàng)目商業(yè)計(jì)劃書
- 介入支架創(chuàng)新創(chuàng)業(yè)項(xiàng)目商業(yè)計(jì)劃書
- 人造石英石洗手臺(tái)盆生產(chǎn)創(chuàng)新創(chuàng)業(yè)項(xiàng)目商業(yè)計(jì)劃書
- 證券營業(yè)部行業(yè)深度調(diào)研及發(fā)展項(xiàng)目商業(yè)計(jì)劃書
- 口腔衛(wèi)生指導(dǎo)企業(yè)制定與實(shí)施新質(zhì)生產(chǎn)力項(xiàng)目商業(yè)計(jì)劃書
- 體育運(yùn)動(dòng)課題研究成果簡(jiǎn)述格式范文
- 2025小學(xué)一年級(jí)數(shù)學(xué)下冊(cè)復(fù)習(xí)計(jì)劃及安排
- 牛津深圳版六年級(jí)英語閱讀提升計(jì)劃
- 贊賢小學(xué)2024-2025學(xué)年度扶貧學(xué)校管理計(jì)劃
- 小學(xué)人工智能科技節(jié)活動(dòng)方案范文
- 家用冰箱市場(chǎng)調(diào)研報(bào)告
- 國際財(cái)務(wù)報(bào)告準(zhǔn)則
- 初中數(shù)學(xué)-專項(xiàng)24 圓內(nèi)最大張角米勒角問題
- 行政單位酒店住宿合同
- 機(jī)械設(shè)備安裝程序、安裝分類、固定方式及安裝新技術(shù)應(yīng)用
- 大樓維修改造工程投標(biāo)方案(完整技術(shù)標(biāo))
- 《建筑施工安全檢查標(biāo)準(zhǔn)》JGJ
- 建筑陶瓷磚檢測(cè)報(bào)告及原始記錄
- 施工現(xiàn)場(chǎng)安全生產(chǎn)(文明施工)檢查評(píng)價(jià)表
- 液氧試題(試題復(fù)習(xí))
評(píng)論
0/150
提交評(píng)論