




版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、DTU V4 Release NoteDTU V4使用說(shuō)明Date: 22/11/01Rotary LayeredDepth track ing display:井深跟蹤顯示:|* ROTARY LAYEREDRotary: 1573|Bit Depth:1138.1 ft|鉆頭進(jìn)尺:1138.1 英尺Block:STOP RESET堵塞:停止復(fù)位|REF Slips: INCo nn ectio n: 0.0 ft|Hook Load: 75.1psi SP: 1400A) MENU|The flashi ng asterisk at the top left of the display
2、in dicates that sett in g/pulli ng slips detect ion is active.在左上角閃爍的星號(hào) 表示使用 放置/拖動(dòng)卡瓦“ Rotary: -raw counts value from the rotary sensor (shaft encoder).“ Rotary.-旋轉(zhuǎn)傳感器(軸式編碼器)所紀(jì)錄的原始計(jì)數(shù)值“ Block: -current direction of travel of the travelling block -UP, DOWN or STOP. When the ROP is low the direct ion wi
3、ll not be show n continu ously, it will alter nate with STOP .“ Block. -當(dāng)前游動(dòng)滑車的行進(jìn)方向 -UP(上),DOWN(下)或STOP(停止).在機(jī)械鉆速較低的 情況下,對(duì)該方向的顯示是不連續(xù)的,它將轉(zhuǎn)換成 “ STOP.“ RESET -indicates that a manual or automatic depth adjustment has beenmade and Orienteer has yet to ack no wledge receipt of the reset.“ RESET -表明進(jìn)行了手動(dòng)或
4、自動(dòng)調(diào)整,且定向軟件此時(shí)才接 收到復(fù)位信號(hào)“ REF-flashes to indicate that the draw works reference point (coil and layer) has not been set.“ REF-通過(guò)閃爍來(lái)表示還沒(méi)對(duì)絞車的參考點(diǎn)(纜圈和層數(shù))進(jìn)行設(shè)置“ Slips: -IN, OUT, IN or OUT. Indicates whether the drill string is in or out of slips. When enclosed in square brackets the displayed bit depth shoul
5、d not be considered accurate. This occurs for a period of 7.5 sec on dswhe n sett ing or pull ing slips.“ Slips.-旋(內(nèi)),OUT(外),IN或OUT.表示鉆柱是在卡瓦內(nèi)或卡瓦外.當(dāng)其被圍在方形支撐架中時(shí),關(guān)于鉆頭深度的顯示值是不精確的.當(dāng)放置或拖動(dòng)卡瓦時(shí),這種情況會(huì)持續(xù)7.5秒鐘.“ Connection: -when pulling slips the length of drill pipe added during the connection is calculated a
6、nd displayed.“Connection.-當(dāng)拖動(dòng)卡瓦時(shí),在計(jì)算和顯示連接的過(guò)程中,鉆桿的長(zhǎng)度以被加入“ Hookload -weight of string currently supported by the hook.“ Hookload大鉤載荷)-大鉤當(dāng)前所承受的鉆 柱的重量“ SP-hookload threshold for detect ion of sett in g/pull ing slips. This is subject to a +-5% hysteresis.“ SP-為了檢測(cè)是否為放置/拖動(dòng)卡瓦,而標(biāo)出的大鉤載荷的極限.該值易受到一個(gè)+/-5%滯后 作用
7、Accurate depth track ing using rotary layered使用旋轉(zhuǎn)層進(jìn)的方法進(jìn)行精確的深度跟蹤To achieve accurate depth tracking the following stepsmust be followed: 為了實(shí)現(xiàn)精確的深度 跟蹤,請(qǐng)按以下步驟進(jìn) 行:a) Remove a ny existi ng correct ion factors 去掉所有現(xiàn)存的較正參數(shù)b) Setup draw works configuration 對(duì)絞車配置進(jìn)行設(shè)定c) Set draw works referenee point 設(shè)定絞車參考點(diǎn)d
8、) Establish a hookload threshold setting 設(shè)定大鉤載荷的極限值e) Setcurrent bit depth確定當(dāng)前鉆頭深度f(wàn)) Correct any errors present更正當(dāng)前存在的任何錯(cuò) 誤a) Remove existi ng correct ion factors去掉所有現(xiàn)存的較正 參數(shù)From the ma in menu select “ DeptIC on trol ”o accessthe depth con trol menu: 在主菜單中選擇” Depth Control 進(jìn)入深度控制菜單I*depth 整鉆頭深度cont
9、rol*其 中: adjust bit depth-調(diào)|1) Adjust Bit置鉆頭深度Depth 4) Scali ng Factor|reset bit depth-重|2) Reset Bit Depth井深單位5) Conn ection Offset|set depth un its-設(shè)定|3) Set Depth Units參數(shù)D) Exit|scali ng factor-比例11connection offset-連接偏移exit -退出 Select “ Scalinbacto/Set the scaling factor to one.選擇“ ScalingFactor
10、 ”設(shè)定該參數(shù)為1Select “ ConnectionOffset ” Set the offset to zero. 選擇 “ ConnectionOffset 設(shè)定偏差為零b) Setup draw works con figurati on:對(duì)絞車配置進(jìn)行設(shè)定To achieve accurate depth tracking it is essential that the draw works configuration is set up correctly. From the main menu select Calibrate Sensors. The calibrate m
11、enu contains four options:為了獲得精確的深度 跟蹤,非常有必要對(duì)絞 車進(jìn)行正確設(shè)定.從主菜單中選擇Calibrate Sensors. 在calibrate菜單中包含 4個(gè)選項(xiàng)|1其中:draw works data - 絞車數(shù)據(jù)|*|refere nee point4卄-參考|1) Draw Works傳感器Data4) Factory Defaults|hookload sen sor-大鉤|2) Refere nee Poi nt廠商默認(rèn)值1factory defaults-生產(chǎn)|3) Hookload Se nsorD) Exit|exit-退出Option
12、1) provides accessto the configuration parameters that allow calculation of travelling block moveme nt compe nsatedfor drum layeri ng. Select ion of optio n 1) displays the first half of the curre nt draw works calibration:選項(xiàng)1)可以提供配置參數(shù),以便將游動(dòng)滑車的移動(dòng)補(bǔ)償?shù)綕L筒層上選擇選項(xiàng)1),顯示第一半關(guān)于當(dāng)前游動(dòng)滑車的標(biāo)定值|1其中:layer 1 coil第一層上一個(gè)
13、線圈的長(zhǎng)度len gth -大繩的直-每一|*|rope diameter|Layer 1 coil le ngth:層上纜線的圈數(shù)3.141ftA) Dow n|coils per layer|Rope diameter:0.125ftC) Edit|Coils per layer:136.00 to 36.001D) Exit|上的纜線數(shù)|*VIEWDRAWWORKS DATA*回轉(zhuǎn)所進(jìn)行的計(jì)數(shù)|Lines in derrick:10goes UP -計(jì)數(shù)值隨著滑|Counts per rev:31|Cou nts INCREASE as blk goes UPA) UpC) Edit|D
14、) Exit|其中:lines in derrick鉆塔counts per rev- 每一次|counts INCREASE as blk車上移而增加Scrolling down using AShows the remaining settings: 按下“ A”顯示剩余設(shè)置To change any of these settings press Cto reach the Edit Draw Works Data menu. 若要改變這些值中的 任意一個(gè),按下” C進(jìn)入” EditDraw Works Data”菜單|*|4) Lines in Derrick|5) Rotary Se
15、n sorLen gthD) Exit|Seethesection entitled Edit Draw Works Data Menu for a full breakdown of the menu structure. 察看這個(gè)標(biāo)有 edit draw works data menu的單元中細(xì)目分類1) Coils per Layer:The number of coils on each layer of the winch can be entered as a single value that applies to all layers or as in dividual val
16、ues for each layer. If en tered as in dividual values it is importa nt that Layef corresponds to the layer whose coil length is used in option 3). Try to include part coils in this measureme ntfor in creased accuracy.指絞盤(pán)上每一層的纜 繩圈數(shù),既可以將所有 層設(shè)置為統(tǒng)一的一個(gè)值,也可以對(duì)每一個(gè)層進(jìn)行單獨(dú) 設(shè)置.若要對(duì)每一個(gè)層進(jìn)行單獨(dú)設(shè)置 ,則一定要注意,“l(fā)ayer1 ”與在選項(xiàng)
17、3)中使用的纜圈所處的層 相一致.為了提高精度,可以試著在此次測(cè)量中包含部分纜圈.2) Rope DiameterDiameter of the rope should be measured either using callipers or by wrapping a piece of string around the rope by a number of complete turns,measuring the length and using the following formula: 可以使用測(cè)徑規(guī)測(cè)量 大繩的直徑.或?qū)⒁唤乩K子纏繞在 大繩上,數(shù)出完整的圈數(shù),并該圈數(shù)的繩子 所
18、對(duì)應(yīng)的長(zhǎng)度,然后通過(guò)以下公式計(jì)算大繩的直徑Rope Diameter = length / turns / PI大繩直徑=長(zhǎng)度/圈數(shù)/pi3) Layer 1 coil length 第一層的 線 圈長(zhǎng)度This is the length of one coil on the first (bottom) layer of rope on the drum. If the bottom layer is not accessible for measureme nt the n the layer treated as layer 1 should be the lowest layer t
19、hat is ever used, ie the layer that is partially unwrapped when the travelling block is at its lowest possible position. It is very important that the layer chosen will never be fully unwound from the drum.The length should be measuredby marking two adjace nt coils with chalk, spooli ng those coils
20、off the drum and measuri ng the distanee between the two chalk marks. If this is not possible andthe actual drum diameter is known the layer 1 coil length can be calculated as follows:這是指在纜盤(pán)最底部那一層一圈纜繩的長(zhǎng)度.如果無(wú)法對(duì)最底層纜繩進(jìn)行測(cè)量,那么將使用過(guò)的纜繩中處于最底層的 那一層作為第一層.例如:當(dāng)滑動(dòng)絞車位于其最低位置時(shí),大繩被部分松開(kāi)的那一層.必須注意的是,所選的那一層永遠(yuǎn)不會(huì)完全從纜盤(pán)上被松開(kāi)
21、.用粉筆在兩個(gè) 相鄰的線圈之間進(jìn)行標(biāo)注,將這些線圈從纜盤(pán)上松開(kāi),測(cè)量這兩個(gè)標(biāo)志之間的距離.如果無(wú)法完成 上述過(guò)程,且實(shí)際的纜盤(pán)直徑已知,那么第一層的線圈長(zhǎng) 度可以通過(guò)以下公式進(jìn)行計(jì)算:Layer 1 coil length = (drum diameter + rope diameter) * PI層1纜圈的長(zhǎng)度=(纜盤(pán)直徑+大繩直徑廣piMeasuri ng the dista nee betwee n the two adjace nt chalk marks can be achieved by using adhesive tape to securea tape measureatt
22、he first chalk mark then lowering the travelling block until the second chalk mark is just off the drum.對(duì)相鄰兩個(gè)標(biāo)記間距離的測(cè)量可以通過(guò)以下方式實(shí)現(xiàn):用粘性膠帶將一個(gè)皮尺固定在第一個(gè)標(biāo)志處,然后使絞車向下移,直到第二個(gè)標(biāo)記剛剛脫離纜盤(pán)為止.4) Lines in derrickThis is the total number of lines running between the travelling block and the crown block,ie: 這是指在滑動(dòng)絞車和定滑輪之
23、間的總纜線數(shù).例如:Lines in derrick = Number of sheavesin travelling block * 2鉆塔上的纜線數(shù)=在絞車上的線數(shù)*25) Rotary Sensor旋轉(zhuǎn)傳感器|I*|其中 :counts per rev|1) Cou nts per的選擇Rev|select directio n|2) Select Directi on1D) Exit|1-每一轉(zhuǎn)-方向1) Counts per RevIf this is not known it can be measured by marking the position of the centra
24、l (rotating) part of the se nsor relative to the outer (stati on ary) part the n rotat ing the se nsorthrough exactly on efull turn while observing the rotary counts display on the main depth tracking display. Because the DTU sensesboth the rising and falling edgesof the rotary sensor output signal
25、the value required may be double the manufacturer quoted figure.在為止的情況下,可通過(guò)以下方法進(jìn)行測(cè)量:將傳感器上相對(duì)于外部(固定部分)的中心部位標(biāo)注出來(lái),然后將傳感器完整的旋轉(zhuǎn)一圈,觀察在深度跟蹤主 頁(yè)面上顯示的旋轉(zhuǎn)計(jì)數(shù)值由于DTU傳感器能夠感應(yīng)旋轉(zhuǎn)傳感器輸出信號(hào)的上跳沿和下跳沿,則所需的數(shù)值也許是生產(chǎn)商所提供數(shù)值的兩倍2) Select directionDepencbhgtheientatix6 nhe rotsaiysomthraworks drumatlceunt value frorithensi(ncreaSther
26、hehn4avellihbpcmoves up or dowimpThefey toestabiwhethershtsthenaidepth trackisig 傳感器中原原即settin 的絞定的設(shè)動(dòng)方向正設(shè)定最簡(jiǎn)gcorreictto obsthreeoclkavlirectiOndicatoh yhile the biSicteotion. If iSihEorrelcehelettte著絞車的上移或下這取決加在絞盤(pán)傳感#的匕 量侖;設(shè)置為動(dòng)況情查深度跟蹤王頁(yè)面上所顯萬(wàn)向確定該設(shè)c)Set DraWorkReferencen 設(shè)置車參考點(diǎn)In orderthe DTUusthe laye
27、dagorrectly it mudthenurwelnit/eindoiposition on thcteaworks. Ftbmalibratiohehaele(ReferehRsint : 中選擇須要知道道當(dāng)和絞車上線圈的位其能夠正確纜層數(shù)在Calibrat菜單 *-*;*i Reference:Current:1) Set new referenceoointLayer: 1 Coil: 5跖D) ExitTheispla/iows arevioienyered referehceRefehfelaceheayer/cpOlsitiOhat thdDTWhinks the draw w
28、oriesOs Currenfttheurrepio siti(isnocorreietthe actubUmbefayeahd cOiteCah be, seenon thre works dibymsuanspection doesomatchealuessplayed CurrehefnSen ewefererpcenihoube selected andhectuvalueltereCbtthatheeferehCehmust be updateChwCrenh 這里顯示en 如ui顯示的并打須重新輸八參考點(diǎn)卄OEstablitHe hooklttaCsholetti ng (Setn
29、 確定鉤載荷極參考點(diǎn) RecothemaximlhmDkloadvaheelStrinihdSpS! possibfeserthehookload durirbothotary drilahglidihShcecotlCeminimUmokl(vaClwhileut of slips. From thenaimenselectHooklSaBoin”nenter valtieas roughlylwabetweeie two工.|中時(shí)下最大大鉤負(fù)載值可能,在旋轉(zhuǎn)鉆進(jìn)和滑鉆時(shí)觀察大鉤負(fù)載在鉆柱脫離卡記時(shí)下大鉤負(fù)載值最小e)Set currbittdep設(shè)置 在”exe”單mgC01Obpe了任事
30、個(gè)當(dāng)前位考點(diǎn)翻用眼睛所看到纜盤(pán)車絞邛圈數(shù)與符么選擇;seheweferehBen設(shè)置新的參考,并輸入實(shí)際注意n;noIIO:TyCP erro, thereorrectnyerrors present何存在的誤差講行糾正 j J 亠 Ji-tanteredhere naaditionbeytun eetpeiaCki ng rendUce is procedure,,、,.瓦萬(wàn)面也有可能存在誤差 驟進(jìn)行totpopwho血gth is kraccuirateiy.件自量一的鉆長(zhǎng)而不豐僅依賴于鉆da為常在ISB1) Obseaconnecbemmiade using aofdcTp 使用一段u知
31、n. measure 恤rfhbe 官標(biāo)簽上標(biāo)注的長(zhǎng)度2) Recothe Conneeo compieee;he cstHinis動(dòng)設(shè)定深eff作為連ndhsplayodthe depth tdackiag dhosonnection is oOSlipSWe wCathiShe“DTCSnnectehh|t”.一旦完成連接,記錄下顯示在深度跟蹤屏幕上的connection長(zhǎng)度.例如:鉆柱脫離卡瓦.我們稱此為 ”DTU 連接長(zhǎng)度 ”3) Lower the string until the bottom shoulder joint of the piece of drill pipe th
32、at has just been connectedis exactly level with some reference point (for instance the rotary table). 向下放鉆柱 ,直到被連接鉆管的底端接頭端 面與某些參考點(diǎn) (例如:轉(zhuǎn)盤(pán))絕對(duì)水平.4) Recordthe bit depth. 記錄下鉆頭深度5) Lower the string until the top shoulder is level with the referencepoint. 向下放鉆柱 , 直到頂部端面與參考點(diǎn)水平 .6) Recordthe bit depth. 記錄下
33、當(dāng)前鉆頭深度7) Subtract the smaller of the two recorded depth values from the larger value. We will call this the DTUdepth change.在記錄下的兩個(gè)深度 值后, 用較大的那個(gè)值 減去較小的那個(gè)值 . 我們稱這個(gè)值為 ”DTU 深度變 化值”.The difference between the two recorded depths should now equal the length of the pipe connected.If it doesnotthen there i
34、s anerror in the draw works dataentered. If the error is verylarge it would be best to repeatthe procedurefrom a).If the error is reasonably small calculate a scaling factor as follows: 這 兩個(gè)值之差應(yīng)當(dāng)與 連接鉆管的長(zhǎng)度相同 . 如果不同 , 那么輸入的絞車數(shù)據(jù)存在誤差 .如果這個(gè)誤 差很大 , 最好從 a) 重新進(jìn)行 . 如果誤差相對(duì)較小 , 按 如下公式計(jì)算比例因子 :Scale factor = len
35、gth of drill pipe / DTU depth change比例因子 = 鉆管的長(zhǎng)度 /DTU 深度變化Now correct for anyslips detection error:現(xiàn)在 , 對(duì)任何 卡瓦檢測(cè)誤差 進(jìn)行 糾正 :Connection 0ffset = length of drill pipe -(DTU connection length * scale factor)連接偏差=鉆管的長(zhǎng)度-(DTU連接長(zhǎng)度*比例因子)8) Enterthe scale factor and connection offset via the “ DepthControl ”me
36、nu.在Depth Control菜單中輸入比例因子和連接偏差9) Resetthebit depth to thecurrent bit depth.將鉆頭深度設(shè)置為當(dāng) 前鉆頭深度N0TE: If aconnection offset of greater than 1 inch (2.54cm) is entered the DTU will flag adepth reset to0rienteer at theendof eachconnection. The connection offset will only be applied if the connection is gre
37、ater than 910 (3 metres).注意:如果輸入的連接 偏差大于1英寸(2.54厘米),那么DTU將在每一處連接的尾端相Orienteer軟件重新設(shè)定一個(gè)深 度標(biāo)志. 只有在連接長(zhǎng) 度大于 910 (米3 )時(shí)才使用連接偏差 .Main Menu:主菜單II*I Hookload SetPoi nt4) Depth Con trolII2) Depth Tracki ngMode 5) Test ModeI3) Calibrate Sen sorsID) ExitI1=1)I* 2)I* SELECT11) Rotary Stan dard12) Rotary Layered1
38、3) Water BottleMODE *=A) OkD) Abort|I*I= 3) Il) Draw WorksData4) Factory DefaultsIMe nuI2) Refere nee Poi ntI3) Hookload Se nsorID) ExitI1= 4) MenuI* * Adjust BitDepth 4) Scali ng Factor12) Reset Bit Depth13) Set Depth Units5) Conn ection OffsetID) ExitII*I= 5) Raw DataMe nu12) Firmware Info13) Draw
39、 WorksIPositi on1D) ExitI= Calibrate校訂菜單= Depth Control深度控制菜單= Test Mode檢測(cè)模式菜單Calibrate Menu:校驗(yàn)菜單|*|1) Draw Works Data 4) Factory Defaults|2) Refere nee Poi nt|3) Hookload SensorD) Exit|= 1)|* *|len gth:3.141ftA)Down|0.125ftC)Edit|36.00 to 36.00D)Exit|*|= Dow n|Li nes in derrick: 10A) Up |Cou nts pe
40、r rev:31C) Edit|Cou nts INCREASE as blk goes UP D) Exit|*|= Edit|1) Coils per Layer4) Lines in Derriek|Edit Draw WorksData_|2) Rope DiameterSen sor|大鉤數(shù)據(jù)編輯菜單|3) Layer 1 CoilLengthD) Exit|=5) Rotary= 2)|*| |Refere nee:Layer: 1Coil: 5.00| Curre nt:Layer: 2Coil: 19.74| Set new referencepointD) Exit|*|=
41、1) 1A) Ok|En ter curre ntlayer:1C) Clear|Max: 20Min:|11D) Abort|*|= Ok |A) Ok|En ter curre ntcoil:15C) Clear|Max: 150.00Min: 0.00D) Abort|SENSOR DATA*0.000 psi= Edit HookloadI* 3) jPressure at4ma:Sen sor Data MenuPressure at 20ma:I1450.0 psiC) EditID) ExitIResetting factory defaults will resetall ca
42、libration data entered by the operator. This option should therefore be usedwith caution._ 對(duì)生產(chǎn)商所設(shè)定的默認(rèn)值進(jìn)行重設(shè)定將會(huì)把操作人員所輸入的所有標(biāo)定數(shù)據(jù)進(jìn)行重置因此,使用此操作應(yīng)十分小心.I* 4) IRestori ng factory defaultswillA) OkD) AbortIIerase ALL calibrati ondata forIALL modes. Proceed?Depth Control Menu* 深度控制菜單I* 3)I* SET MetresI2) Feet=DE
43、PTHUNITS *A) OkD) AbortII=1) IIIII*adjustCurrent depth:|New bit depth:|Chan ge:1BIT depth*1137.57 ft1138.07 ft+0.50ft1A) OkB) +C)-|D) Abort|II11 *reset1BIT depth*=2) IICurrent depth: New bit depth:1138.07 ftftA) OkC) Clear|IIID) Abort|I* *I1.000A) Ok C) ClearID) AbortIIMax: 10.00Min: 0.01|*|= 5) |Cu
44、rre nt ofset:10.000 ftA) Ok | New offset:ftC) Clear|Max: 49.21Min: -49.21B) Neg D) Abort|*|5) Hardware Tests|PositionD) Exit|Displays raw data from the sensors.Hookload is displayed in volts where 0.48v = 4ma and 2.4v =20ma.顯示傳感器測(cè)得的原 始數(shù)據(jù).大鉤負(fù)載是以 電壓的形式表示的,其中0.48伏=4毫安,2.4伏=20毫安|1|*|檢測(cè)模式:旋轉(zhuǎn)纜層式= 1) |NowM
45、inMax|Hkld:0.58v0.58v0.58v B) Reset|Rot:157311573|1573D) Exit |r1|r| *|軟件版本信息= 2) |Orien teer DTU V4.00|Code space checksum:EC4E|D) Exit|Displays current layer and coil as calculated from the draw works data and reference point.顯示通過(guò)計(jì)算絞車數(shù) 據(jù)和參考點(diǎn)而得到的當(dāng)前纜層和纜圈|*|= 3) |Cou nts:1573|Layer:1Coil: 15.00|Block
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 房地產(chǎn)行業(yè)的品牌工作計(jì)劃
- 優(yōu)化產(chǎn)品價(jià)格策略計(jì)劃
- 質(zhì)量管理中的人員培訓(xùn)與團(tuán)隊(duì)建設(shè)
- 銷售增長(zhǎng)計(jì)劃
- 足球訓(xùn)練中的心理輔導(dǎo)與激勵(lì)
- 部編版初中語(yǔ)文必讀名著書(shū)目(完整版)
- 高中語(yǔ)文情感美文創(chuàng)造宣言
- 科技引領(lǐng)下的西安教育行業(yè)虛擬現(xiàn)實(shí)應(yīng)用前景
- 黑龍江2025年02月共青團(tuán)黑龍江省委員會(huì)事業(yè)單位上半年公開(kāi)招考3名工作人員筆試歷年典型考題(歷年真題考點(diǎn))解題思路附帶答案詳解
- 初中語(yǔ)文生活美文農(nóng)家客
- 網(wǎng)課智慧樹(shù)知道《老年醫(yī)學(xué)概論(浙江大學(xué))》章節(jié)測(cè)試答案
- MOOC 數(shù)據(jù)庫(kù)系統(tǒng)(中):建模與設(shè)計(jì)-哈爾濱工業(yè)大學(xué) 中國(guó)大學(xué)慕課答案
- 徽派建筑PPT江西婺源
- 正弦函數(shù)的圖像與性質(zhì)優(yōu)秀課件
- 山東省任氏宗親分布村落
- 北師大版小學(xué)數(shù)學(xué)五年級(jí)下冊(cè)《有趣的折疊》說(shuō)課稿
- 陜西省建設(shè)工程長(zhǎng)安杯獎(jiǎng)省優(yōu)質(zhì)工程結(jié)構(gòu)備案和復(fù)查的要求
- 典型示功圖分析(全)
- 水生觀賞動(dòng)物鑒賞與維護(hù)課程
- ATOS阿托斯葉片泵PFE-31PFE-41PFE-51選型資料樣本
- 日語(yǔ)綜合教程第五冊(cè)的PPT5-1
評(píng)論
0/150
提交評(píng)論