實習報告范文英語版_第1頁
實習報告范文英語版_第2頁
實習報告范文英語版_第3頁
實習報告范文英語版_第4頁
實習報告范文英語版_第5頁
已閱讀5頁,還剩7頁未讀, 繼續(xù)免費閱讀

下載本文檔

版權說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權,請進行舉報或認領

文檔簡介

1、實習報告范文英語版實習是我們脫離大學之前的一次珍貴演習,正確地認識自己。以下是小編為大家整理的實習報告范文英語版。范文一graduation reportgraduation practice is to complete the final phase of the universitys course to be the most important section of the practice. practice is every qualified students must havean experience that allows us to enhance profession

2、alism in the practice of awarenessand practice of awareness. we practice during the process of training units in theschool and support, more guidance of experts, through training we learned a lot in class, not simply the knowledge of school for our future design and lay a solid foundation. at the sa

3、me time allow themselves to contact the school for the purpose ofinternship training of our ability, the five-week internship to increase their ability to havea lot of knowledge, greatly improved.graduation purposeinternship is designed to improve the ability of students and social contacts and to u

4、nderstand and master, verify and consolidate learned basic course content. enable students to understand the modern high-rise building design and the actual construction of electrical easy to ignore the problem, students integrate theory with practice, love the professional, enthusiastic, committed

5、to thinking of chinas modernization drive.graduation contentto achieve the above objective practice, practice the main content should include:1. understand the internship process and production organization of productionmanagement.2. understand the performance of some electrical products and feature

6、s.3. control low-voltage distribution system design, weak part of the design, lighting,part of the design, dynamic part of the design, lightning protection and grounding part of the design.4. institute of electrical equipment used in operating methods and the basic working principle.although this pr

7、actice is only 3 weeks time, but during that time, the theory for somecommon things, with perceptual awareness, feel benefit.here are some of my summary of the internship period, and their feelings and experiences. to carry out their work in the future, and the future work of great help tome.visit t

8、he west campus, dongsheng building and city hall and linear low-voltagepower distribution room, and the laying of the roof there are weaknesses in the design of some of mine. now i will explain in detail the building of the lightning protection and grounding1. basic principles:lightning protection d

9、esign of technical measures should be the existing national standard lightning protection design of buildings for lightning protection, refer to building lightning protection design standard corresponding requirements, the use of ball lightning rod protection method, the use of other potential join

10、the most important safety measures.2. anti-cloud-to-measure, should meet the following requirements:(1) air terminals using the lightning rod, lightning protection zone (network), or a combination of both, it should be used as a metal roof building air terminals, but should be consistent with regula

11、tory requirements. containing radioactive material should not be used air terminals. the elimination of other forms of lightning, it should only be used with high pole tower roof was added to our building on. protrusions on the roof, such as satellite and receiver antenna, holiday lights, aviation o

12、bstruction lights and air-cooled unit, the roof should be in the range of lightning protection devices, if not calculated by ball within the scope of protection should be separate lightning rod, with protection, lightning protection device connected with the roof.(2) deflectors should give priority

13、to the use of reinforced concrete building columns or shear walls in the main bar, but also should use the building on fire ladders, steel columns, metal chimneys, etc., as deflectors.when the use of steel in reinforced concrete columns, steel columns as a natural drop, and also used as a grounding

14、device based steel with no disconnect card, but it should be located in a number of suitable locations outside the bar connected with the column connecting plate, for the measurement, an external artificial grounding and equipotential bonding for use.brick buildings surrounded by a separate deflecto

15、rs in the external walls and the installation of 1.8 meters from the ground disconnected card. the 1.7 meters to 0.3 meters underground for some protective measures should be taken.(3) the use of grounding devices should give priority to the building of reinforced concrete base. a reinforced concret

16、e ground beam, should in the beam reinforced with a ring grounding device; not reinforced concrete ground beam, it can not in the building surrounding strip of reinforced concrete base closed, galvanized flat steel with a direct lay-40x4 pit in the outer groove to form a circular grounding.!-empiren

17、ews.page-when the transformer and the work of the diesel generator neutral grounding, electrical protective earth grounding system work and share weak grounding device, the grounding resistance should be less than 1 euro. use common grounding, the weak systems should their equipment room, and buildi

18、ng insulation grounding stud, with more than 25 mm2 copper cable or wire welded steel pipe made through a separate drop, the foundations of buildings connected with the ground plate. weak system of general requirements for grounding resistance of less than 4 ohms, should be an independent ground sys

19、tem view often ? boxu chile to catch car owner thereupon low ash wood ho chant argon ? 0 meters.3. sideswipe against mine measures should meet the following requirements:height over 30 meters of reinforced concrete structures, steel structures, should take the following anti-swipe mine and equipoten

20、tial bonding of the protective measures:(1) steel frame and reinforced concrete should be connected to each other;(2) should be used within the steel column or reinforced concrete columns reinforced as a lightning protection device deflectors;(3) should be 30 meters and over the railings on the exte

21、rnal walls, doors, windows and other large metal objects and lightning protection device is connected;(4) vertical laying of metal pipes and metal top and low-end devices to be connected with the mine;(5) columns and ring beam without the buildings, walls should be laid at intervals of around three

22、out of galvanized round steel ¢ 12 to do the grading rings, a combination of columns and ring beam, the use of steel for the ring beam grading ring. all the building every three vertical metal pipe connected with a grading ring. grading ring should be connected with the lightning protection dev

23、ice deflectors.4. lightning induction of measures, should meet the following requirements:(1) the protection of metal objects within the building ground, is the main measure lightning induction. therefore, the building housing the equipment, pipelines, and other major metal frame should be close to

24、receiving the grounding or electrical equipment, lightning protection grounding device(2) parallel to the laying of pipes, cables metal jacket structure and a long metal object, the spacing is less than 100mm should be used jumper wire, cross-junction spacing should not exceed 30m; crossing clearanc

25、e less than 100mm, the should be across the intersection.5. lightning invasion wave of measures, should meet the following requirements:(1) line of low voltage lines should be buried with the cable directly into the home end of the cable jacket or the protection of metal pipe on the device receiving

26、 the lightning protection and grounding; if connected to overhead lines should be changed into the household 50m cable, cable for connection at arrester should be installed, and with the cable metal sheath, steel and iron insulator feet, fittings, etc. together, the impulse grounding resistance shou

27、ld not exceed 10 ohms. if overhead wires are used, the arrester should be installed into office.(2) overhead and underground metal pipes, should be in and out of buildings and lightning protection grounding device connected at.fixed on the building of holiday lights, aviation obstruction lights and

28、other electrical equipment of the line, should be based on the importance of building the mine to take corresponding measures invasive radio waves:a. no metal or electrical equipment protection network should cover the protection of air terminals within;b. the line leads from the distribution box sh

29、ould wear steel. ends of the pipe is connected with metal distribution box; the other side of the metal casing and electrical equipment, protective cover is connected, and lightning protection devices connected to your nearest roof. pipe should be located off the middle of the jumper.third, and expe

30、riencethis internship, i learned that the size of the plant level, the production process and the production of some conventional products, the study design in the future i believe there will be more help.in addition, i feel that through this internship for me after the choice of electrical equipmen

31、t, lighting, power, systems, lightning protection and grounding aspects of the design will be very helpful thank the school and the teacher gave us this gui internship opportunities.范文二it is my honor to stand here today. first of all, i want to thank our dean mrs. li to give me this chance to delive

32、r a speech to you. thanks.this is a speech about practice report, in the first place i want to share with you about my work experience.in the first summer vacation in the college, i changed 3 part-time jobs. the first one was waiter; the second one was teaching assistant in talking time language vil

33、lage (ttlv); the third one was interpreter in a highway service station. maybe you will ask me how can you get 3 part-time jobs and why do you want to change it? actually this is a good question. here are 3 reasons: first i want to speak english,second i want to practice english, third i want to use

34、 english. this was also the main reason i quitted the first one job waiter. then i searched ttlv online and i attended the interview and passed the teaching test. everything seems went smoothly, i started to work there in a few days later. i was a teaching assistant there, i was in charge of 8 stude

35、nts in my class and i assisted the foreign teacher to interpret for the students during the class. i work there for 20 days then i left because of olympic games in china. so i lost, that seems god always take good care of me, one of my supervisor in ttlv recommended a good job to me after i lost a few days, that was my third job in that vacation. i was an interpreter and i was in charge of communication with foreign friends there. i worked there for 30 days, i got 1500rmb which was my first time to earn so much money by m

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論