




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、、 Accounting for materials1 EOQ1 D1 DTC方5-屈叫Q字Co=costofp lac ing one order Ch= holdi ng per unit D=dema nd annum Q=re-order qua ntity Annual stockhold ing Costs =-* Q2兀 AnnualDordering二-*costperstock11EBQ邊生產(chǎn)一邊消費(fèi) Q=batch size D=dema nd per annumCh=cost of holding one unit for one yearCo=cost of setti
2、ng a batch ready to be p roduceR=annual repleni shme nt rate2.Stock control system.minimum stock levelreorder level -(average usage maximum stock levelX average lead time)Maximum level = reorder level + reorder quantity(mi nimum usage average inventory = safety inventory +X minimum lead time)reorder
3、 quantity2 free inventory=physicalinventory + inventory onorder -nventory requisitioned (not issued)二、Accounting for labor1. direct labor cost Time-based system Wages = (Hours worked x basic rate of pay per hour) + (overtime hours workedX overtime premium per hour )Idle time: time spent doing nothin
4、g is called idle time.Overtime p remium: overtime hours are paid at a higher rate tha n the basic hourly rate.Bonus payments: ap ayme nt in additi onto a basicsalary,eitherforachiev ingorexceed ingcerta intargets. P iecework systemsWages - Units p roducedx Rateof pay per unit2. labor turnoverLabor t
5、urnover =number of leavers who require replacementsaverage number of employee* 100%3. labor efficiency Efficie ncy ratio=Exp ected hours to p roduce out put (std hours) * 仙Actual hours to p roduce out put勵(lì)山f MaF*尋附止W葉船刃g(shù)血卅理卩&血!)Fatal hours avci:血紡誠g吐謔) Capacity ratio- _:耳 1UU%ft&urs to produceoutput
6、(jrtf Production volume ratio- . .=:二* 100%北MI h陽陽血M血肝& f b皿g吐話)fettorsA虛G廿第竝f力 LT- _UflEt上式冠聞biidgLffa output申飛石一三、Accounting for overheadsl.absor pti on costi ngP rime cost / direct costOverheads / in direct costP roducti onoverheads (in direct materials,expen ses)Non-p roducti onoverheads(admi ni
7、 stratio ndistributi on overheads)in directlabor, in directoverheads, selli ng andorsrfefcd costs Absor pti on rate= P redeterm ined absor pti on rate=2. un der/over absorbed a. If Actual overhead in curredthen overheads are over absorbed (O) (NO)b.If Actual overhead in curred-Absorbed overhead = P
8、OSITIVE (P), the noverheads are un der absorbed (U) (PU) Overhead absorbed=Actual activity * absorptionrate based on thebudget.Cost ledger: a manu facturi ng orga ni zati on might record its costs in a set of ledger acco un ts, called cost ledger.The ledgers not contain acco unts for bank, debtors,
9、non-curre nt assets.Cost control accounts, it is for recording the matching double entry whenever the entry would be to an ledger. Raw material, WIP or Fini shed goods-Absorbed overhead = NEGATIVE (N),account not contained in the costa. Buy: Dr raw material Cr cost controlb. issue: Dr WIPDr p roduct
10、 ionDr non-p roduct ionCr raw materialc. finished: Dr finished goodLabora.P ay: Dr salary and wagesCr WIPCr cost controlb.A pp ortio n: Dr WIPoDr p roduct ionQDr non-production -Cr salary and wages Manu facturi ng overheada. Incurred: Dr productionaCr cost control b. Absorption: Dr WIP0Cr p roduct i
11、on -HCr -c. Over-absorbed: Dr productionUn der-absorbed: Dr -S 0 Cr p roduct ionH四、l.job costing P rice=unit cost + profit p rice= un it cost+2. Batch cost ing(unit cost“ 1” *n%Cost per unit batch =Mtal production cojt. d/ batch五、I.Normal lossSolutio n p rocedures:Calculate the nu mber of no rmal lo
12、ss un itsCalculate the exp ected nu mber of out put un its Total the p rocess costsCalculate the cost per unitWrite up the p rocess acco unt and no rmal loss acco untTotal progress cost = Scrip value lof n&rmai less (殘值)Cost per Wit =Excepted Gwtpui2. Abno rmal lossWIP: work-i n-p rogress p roduct.E
13、quivale nt un its: un its of out put rema ins in an uncomp leted state can be exp ressed as a prop orti on of a comp leted un it.3. Weight average methodcost為初&本期實(shí)沬Eus為吻期爭真本期約界Equivale nt un its: all comp leted un its and the closi ng WIP work done. Costs to be acco un ted for: opening stock values
14、and curre nt costs. Cost per equivale nt unitCosts of fini shed p roducti onComp lete the p rocess acco unt4.The FIFO methodCost朮再實(shí)際發(fā)生的成本EusEquivale nt un its: the comp leti on of opening WIP, un its started and comp leted in the p eriod, the work done on clos ing WIP.Costs to be acco un ted for: curre nt cost added.Cost per equivale nt un it.Cost of fini shed p roduct ion: cost
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 中原地產(chǎn)手房買賣合同
- 學(xué)校采購校服合同
- 工地門窗安裝合同
- 建設(shè)工程勞務(wù)分包合同
- 場地汽車租賃合同
- 污水處理廠施工合同
- 漳州理工職業(yè)學(xué)院《飛機(jī)液壓與燃油系統(tǒng)》2023-2024學(xué)年第二學(xué)期期末試卷
- 漳州理工職業(yè)學(xué)院《室內(nèi)模型設(shè)計(jì)》2023-2024學(xué)年第二學(xué)期期末試卷
- 江西水利職業(yè)學(xué)院《現(xiàn)代儀器分析綜合實(shí)驗(yàn)》2023-2024學(xué)年第二學(xué)期期末試卷
- 北京郵電大學(xué)世紀(jì)學(xué)院《物流管理》2023-2024學(xué)年第二學(xué)期期末試卷
- 《病理檢驗(yàn)技術(shù)》課程標(biāo)準(zhǔn)
- 立式加工中心說明書
- NcStudio-V15-激光平面切割控制系統(tǒng)用戶手冊(LS1500)
- 氮?dú)庵舷⑹鹿拾咐?jīng)驗(yàn)分享
- 國家安全人人有責(zé)國家安全主題教育PPT模板
- BowTieXP風(fēng)險(xiǎn)與管理軟件介紹
- 污水管網(wǎng)計(jì)算說明書
- 原子雜化軌道理論
- 文化產(chǎn)業(yè)園項(xiàng)目建議書范文
- 互聯(lián)網(wǎng)銷售卷煙(煙草)案件的分析
- 公務(wù)員考察政審表樣本
評論
0/150
提交評論