1、Heavy-duty Apron Feeder220010000mmProduct InstructionShenyang Mining Machinery Import & Export Corporation推薦精選Contents1.usage and useful scope 2.technical character3.working principle and structure character4.installation, commissioning and test run5.operation rules and maintenance6.lubricating推薦精選1
2、、usage and useful scope Heavy apron feeder widely used in mine, metallurgy, building material and coal departments. The machine usually is located under material bin and hopper with certain bin pressure. It can short distance transport kinds of materials with large density to crushing and sifting an
3、d transportation equipment equally and it is especially suitable for be used under primary crushing. It is not only suitable for treating big particle size material, but also thin particle size material. It can finish heavy-duty job in the bad environment and have good applicability to material part
4、icle size changing, temperature, viscosity, ice frost and rain snow effect, and it feeding quantity is right and equal. Installation of the machine can be horizontal, and also sloping. Max. inclined angle to up transporting is 23。 2、technical character: Specification-2200X9944mm Width of chain plate
5、-2200 mm The distance from sprocket shaft centerline to take up shaft centerline推薦精選 -9944 mm Feeding speed-0.010.067m/s Capacity-100650t/h Particle size-1.0x1.0x1.2m Adjustable distance of take up device-700 mm Inclined angle to up transporting-20 motor: Type-YP2280M-6 Power-55KW Revolution -980r/m
6、in reducer: Planet and orthogonal type Total speed ratio-6103、working principle and structure character The machine running come true by that motor drives sprocket shaft rotating through coupling and reducer, and at the same time the mesh between sprocket gear and pin shaft of chain makes chain plat
7、e moving along straight line. Chain plates are supported by thrust wheels and carry wheels installed on the frame, and adjusting take up device makes chain and sprocket mesh, thereby the machine finish the aim of transporting material to crusher.推薦精選 Heavy-duty apron feeder (see drawing 1) include d
8、rive unit1, chain plate device2, take up device3, main shaft device4, frame5, thrust wheel6, carry sprocket7, etc. and its main characters are as follows:3.1 drive unit (see drawing 2) include motor1, coupling2, orthogonal reducer3, planet reducer4, torque lever5, locked disc6, etc. the unit adopts
9、orthogonal shaft fulcrum float type, the sleeve of main shaft is installed in output shaft of planet reducer, and connection between them is through locked disc. The structure character is low weight and big speed ratio. Because of adopting fulcrum float type, to reduce additional bend moment to sha
10、ft caused by installation error, and to increase using life of transmission and easy for dismounting. 3.2 chain plate device (drawing 3) include: pan plate1, chain element2, etc. pan plate adopts single arc join type and is made by low alloy steel plate. Its character is high strength, wearproof and
11、 no leakage. Chain element adopt tank chain and its character is small pitch error, calm running, high strength, and no lubricating. 推薦精選3.3 take up device(drawing 4) is screw lever take up mechanism and it include: shaft1, two carry wheels2, rolling bearing3, bearing housing4, complex spring5, and
12、take up screw6, etc. carry wheel is fixed on the shaft through sleeve, roller bearing and bearing housing are installed at the two ends of shaft and therein bearing housing is installed at two sides of frame. Take up device is used for straining chain and adjusting horizontal position of chain. Carr
13、y wheel act guiding and supporting chain plate. Complex spring act compact function. 3.4 main shaft device(see drawing 5) include: shaft1, bearing housing2, sprocket3, supporting wheel4, and bearing housing5, etc. the aim of transporting material is to come true by that two sprockets on shaft draw c
14、hain plate to run. The device character is easy dismounting and maintenance because the connection between sprocket and supporting wheel adopts expanding sleeve connection, and main shaft is installed in the output shaft in reducer.3.5 it is -shape structure made of steel plate, several reinforcemen
15、t plates are welded between top and bottom alate plates. The two -shape main beams are welded together through channel steel and -shape steel, which structure is firm and calm.3.7 thrust wheel(drawing 7)include: pedestal(1), rolling bearing(2), shaft(3), roller(4), press cover(5), seal ring(6) etc.
16、it is used for supporting chain to prevent chain plate from forming large flexivity caused by load and self-weight. And it can make chain normal running and undertaking some material impact and pressure from bin, and at the same time it can prevent chain form offset.推薦精選3.8 carry sprocket:(drawing 8
17、)it include: pedestal(1), shaft(2) shim(3), rolling bearing(4), support wheel(5) end cover(6), cover(7) etc. it is used for supporting chain plate to prevent chain plate from forming too large flexivity to effect normal running.4. Installation, commissioning and test run Before installation, compone
18、nts should be cleaned necessarily, and installation tools should be prepared well.4.1 installation of the frame: The frame usually is mounted the base under bin or and hopper, and it is jointed through pre-embedded bolt. If no bolt, there should be pre-embedded steel plate on the base. The frame wou
19、ld be welded on the pre-embedded steel plate, if height need to be adjusted, shim can be used, but shim must be welded on the pre-embedded steel plate.4.2 Sprocket shaft device and take up device are hanged on the frame, after installing connection bolts, adjust bearing housing to make the verticali
20、ty and levelness between sprocket shaft line and frame centerline not more than 1/1000 of its bearing span. When take up device is mounted, be sure that the parallelism between take up shaft centerline and horizontal plane is not more than 0.5/1000 of its bearing span. On the base of two shaft lines
21、, the difference of two diagonals should be not more than 1/1000.through adjusting reach requirements later, sprocket device and take up device would be fixed on the frame. when installing thrust wheel, parallelism of shaft centerline of thrust wheel on lengthways and cross direction cannot exceed 1
22、, and it can be adjusted by adding pad.推薦精選4.3 motor and reducer would be mounted on the main shaft, and would be tightened by locked disc, and each bolt tightening moment of locked disc is 470N.M.4.4 Adjust screw of take up device to make it on the position of min. travelling point. Make chain plat
23、e device level higher by putting steel plate or channel steel under frame till side plate of chain plate is accordance with carry sprocket in height. Raise an end of chain plate to let chain plate slide from the end to other. After moving for a certain distance, the other end chain plate is jointed.
24、 The chain movable joint as same as others adopt pin shaft connection, but combining clearance between pin shaft of movable joint and chain element is looser than others. To knock by hand hammer can make pin shaft of movable joint installed into chain element, and make marks on movable joint easy fo
25、r repairing and for 推薦精選dismounting. After the second section of chain plate is installed, by above method, lift chain continuously till two ends outer chain plate length is same, then lift two-end chain plate through steel wire rope to finish chain plate butt.4.5 adjust screw in take up device and
26、tension chain plate to make it in good state. Again check if installation is right and connection bolts are tightened well and in that reducer and lubricated section is filled with lubricant oil, and check if junction for motor and electric device is right. After all are checked, can start machine a
27、nd run for 2 hours without load.4.6 no-load test run should reach the following requirements:4.6.1 running is normal, and rotary components turn freely and no blocking and no knocking.4.6.2 sealed position in lubricating components is no leakage.4.6.3 no loosing to tensioning parts, especially conne
28、ction bolt between chain plate and chain element never loose. 4.6.4 top and bottom rollers should turn freely and two arc join section of chain plate should be not less than 10mm.4.6.5 rising temperature cannot exceed 30 and max. temperature of bearing can not exceed 60.推薦精選4.7 after no load test ru
29、n is up to standard, test run with load is required before putting into production. Time of test run can be decided according to actual condition but continuous test run cannot be less than 2 hours. Load should be added till max. and check it according to stipulated data in drawing, after certificat
30、e the machine can be used.5.operation rules and maintenance5.1 all the time keep certain thickness material on chain plate during the machine is running, material thickness can not be less than 500mm, and it is not permitted that material is put into chain plate directly on the discharging empty sta
31、te. If no avoidance on chain plate should be paved a layer of broken material before discharging to prevent from direct impacting chain plate. When big block of material stop up, it is not permitted to adopt demolishing.5.2 after the machine is installed, the distance from outlet to chain plate shou
32、ld be not less than 1.5-2 times of biggest material. Should keep 8-13mm clearance between protection plates and baffles on the two sides of chain plate to avoid material outflow and friction. The distance from bottom edge of protection plate to surface of chain plate should keep 5-10mm.should keep 3
33、50-500mm clearance from shaft centerline of take up device to back wall of bin for easy maintenance and dismounting.推薦精選5.3 when chain pitch fray exceed 7mm, should change new chain.5.4when knock down expanding sleeve, firstly loosing all the screws but no taking off all the screws, only taking off
34、galvanized screw and washer, again knocking head section to make sleeve loosing, then taking off screw and sleeve is disassembled.5.5 when installing expanding sleeve, should clean primary installation surface and paint a layer grease, then tighten screw by moment spanner.5.6 when installing rolling
35、 bearing of main shaft device, should be sure that the min. diameter direction clearance is about 0.08mm, and that reducing of diameter direction clearance should be between 0.09-0.11. The min. clearance to rolling bearing of take up device should reach about 0.55, and that reducing of diameter direction clearance should be between 0.06
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 貴陽人文科技學(xué)院《風(fēng)景園林制圖》2023-2024學(xué)年第二學(xué)期期末試卷
- 江蘇理工學(xué)院《分子生物學(xué)及分子生物學(xué)實驗》2023-2024學(xué)年第二學(xué)期期末試卷
- 煙臺城市科技職業(yè)學(xué)院《數(shù)據(jù)庫技術(shù)(一)》2023-2024學(xué)年第二學(xué)期期末試卷
- 合肥信息技術(shù)職業(yè)學(xué)院《技術(shù)經(jīng)濟與企業(yè)管理》2023-2024學(xué)年第二學(xué)期期末試卷
- 廣州鐵路職業(yè)技術(shù)學(xué)院《電氣專業(yè)外語》2023-2024學(xué)年第一學(xué)期期末試卷
- 湖北文理學(xué)院《環(huán)境管理與規(guī)劃》2023-2024學(xué)年第二學(xué)期期末試卷
- 廣西外國語學(xué)院《基礎(chǔ)日語》2023-2024學(xué)年第二學(xué)期期末試卷
- 吉林建筑大學(xué)《能源動力與輪機工程概論》2023-2024學(xué)年第一學(xué)期期末試卷
- 新疆科信職業(yè)技術(shù)學(xué)院《機器視覺技術(shù)》2023-2024學(xué)年第二學(xué)期期末試卷
- 2025年副主任醫(yī)師報考條件解析與備考指南
- 水利工程施工組織設(shè)計技術(shù)標(biāo)(完整版)
- 【中小學(xué)】校內(nèi)論壇、講壇、講座、年會、報告會、研討會等管理制度
- 軟件詳細設(shè)計說明書(例)
- 三星堆文化遺跡中國風(fēng)動態(tài)PPT
- DB44-T 2283-2021水利工程生態(tài)設(shè)計導(dǎo)則1-(高清現(xiàn)行)
- XX縣城區(qū)新建公廁、生活垃圾中轉(zhuǎn)站項目實施方案可行性研究報告
- 哈薩克斯坦鐵路車站代碼
- 利潤分配專項審計
- 螺紋的標(biāo)注-PPT課件
- 勇者斗惡龍之怪獸仙境圖表資料合集(合成表技能)
- 履帶式液壓挖掘機挖掘機構(gòu)設(shè)計
評論
0/150
提交評論