




版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、1車間管理系統(tǒng)234;.5修改離散任務(wù)修改離散任務(wù) / Update discrete jobs執(zhí)行離散任務(wù)執(zhí)行離散任務(wù) / Build discrete jobs33定義離散任務(wù)定義離散任務(wù) / Define discrete jobs2系統(tǒng)設(shè)置系統(tǒng)設(shè)置 Set up discrete mfg.1關(guān)閉離散任務(wù)關(guān)閉離散任務(wù) / Close discrete jobs4678910工件移動(dòng)工件移動(dòng)資源計(jì)費(fèi)資源計(jì)費(fèi)(統(tǒng)計(jì)生產(chǎn)成本統(tǒng)計(jì)生產(chǎn)成本)發(fā)料發(fā)料完工完工111213;.1415離散制造的兩種排產(chǎn)方法離散制造的兩種排產(chǎn)方法:16確定提前期的相關(guān)因素確定提前期的相關(guān)因素Item Attribute
2、sDefinitionPreprocessing Lead TimeRepresents the time required to release a purchase order from the time you learn to the requirementPostprocessing Lead Time Represents the time to make a purchased item available in inventory from the time you receive it; you manually enter postprocessing lead time
3、for each purchased item.Processing Lead TimeTime required to procure or manufacture an item; processing lead time includes the fixed and variable portions of lead times.Cumulative Manufacturing Lead TimeTotal time required to make an item if you had all raw materials in stock but had to make all sub
4、assemblies level by level; Oracle Bill of Materials automatically calculates this value.Cumulative Total Lead Time Total time required to make an item if no inventory existed and you had to order all the raw materials and make all subassemblies level by level; Oracle Bill of Materials automatically
5、calculates this value.1718定義關(guān)鍵路徑定義關(guān)鍵路徑/ critical path, 定義工序內(nèi)資源的并行使用定義工序內(nèi)資源的并行使用,定義工序之間的資源的并行使用定義工序之間的資源的并行使用資源資源 Seq1資源資源 Seq2資源資源 Seq1資源資源 Seq2工序工序10工序工序20工序工序30= 是是= 否否= 后并后并= 前并前并計(jì)劃標(biāo)志計(jì)劃標(biāo)志 =完工完工開工開工資源資源Seq1資源資源 Seq4Res Seq2資源資源Seq319Master Scheduling/MRP 與與 WIP2021;.22材料供應(yīng)類型材料供應(yīng)類型/Wip Supply Types
6、推式發(fā)料推式發(fā)料/Push Components to WIP 定義定義/Definitions倒沖發(fā)料倒沖發(fā)料Backflush components to WIP退料到倉(cāng)庫(kù)退料到倉(cāng)庫(kù)子庫(kù)存補(bǔ)充子庫(kù)存補(bǔ)充2324類型名類型說(shuō)明Based on Bill/以BOM為準(zhǔn)Oracle WIP creates component requirements with supply types equal to those on the BOMAssembly Pull/裝配拉式WIP issues Assembly pull components to a job when you complete
7、assemblies into inventoryBulk / 大量Oracle WIP does not automatically transact bulk components to the job or scheduleOperation Pull / 工序拉式WIP issues Operation pull components to a job when you complete the operation where components are usedPush / 推式Y(jié)ou issue push components to a job using the WIP Mat
8、erial Transaction form in advance of consumptionVendor / 供應(yīng)商提供A vendor supplies components directly to work in process2526272829;.3031Setup 步驟步驟事物處理選項(xiàng)事物處理選項(xiàng) / Transaction Options 定義定義3233Note: 任何時(shí)候都可以手工增加額外的材料需求任何時(shí)候都可以手工增加額外的材料需求3435;.3637工序工序 40工序工序 30外協(xié)商外協(xié)商工序工序 20自動(dòng)申請(qǐng)自動(dòng)申請(qǐng)采購(gòu)接收采購(gòu)接收做做采購(gòu)定單采購(gòu)定單接收接收外協(xié)外協(xié)
9、item申請(qǐng)申請(qǐng)外協(xié)外協(xié)item外協(xié)資源外協(xié)資源計(jì)費(fèi)計(jì)費(fèi)移動(dòng)到移動(dòng)到排隊(duì)工步排隊(duì)工步移動(dòng)到移動(dòng)到排隊(duì)工步排隊(duì)工步外協(xié)件外協(xié)件發(fā)運(yùn)發(fā)運(yùn)外協(xié)件外協(xié)件接收接收Physical Flow事物處理流程事物處理流程383940Item AttributeValueDescriptionOutside ProcessingItemYesAllows an item to be put on a PO with a lineOSP line typePurchasableYesAn OSP item must be purchasableOutside ProcessingUnit TypeAssemblyo
10、rResourceDetermines the quality of the item to berequisitionedStockableNoOutside processing is only a service socannot b stockedTransactableNoThere is no physical item to transact, youare purchasing a serviceInventory AssetValueNoThis OSP item has no valueInvoice EnabledNoPayment made for an OSP ser
11、vice not theitem.4142Outside ProcessingUnit TypeBasis(Resource)Requisition, POQuantityAssemblyItemMove quantityAssemblyLot1ResourceItemUsage rate or amount xMove quantityResourceLotUsage rate or quantity x1計(jì)算申請(qǐng)數(shù)量的方法計(jì)算申請(qǐng)數(shù)量的方法43444546474849;.50Discrete離散離散 Making assemblies in batches orgroupsDefining jobs (also known as workorders or manufacturing orders)Detailed schedulingcharging the jobJob costingRepetitive流水線流水線Making assemblies continuouslyover a predefined amount of timeDefining repetitive s
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 韻母的課件(幼兒園)
- 2025年拉桿球頭項(xiàng)目建議書
- 香坊區(qū)中考二模語(yǔ)文試題(圖片版含答案)
- 系統(tǒng)解剖學(xué)試題及答案(九)
- 2025年混合式步進(jìn)電機(jī)項(xiàng)目發(fā)展計(jì)劃
- 2025年轉(zhuǎn)向齒條項(xiàng)目合作計(jì)劃書
- 五年級(jí)語(yǔ)文教案 (一)
- 2025年AOI光學(xué)檢測(cè)系統(tǒng)合作協(xié)議書
- 2025年電子測(cè)量?jī)x器合作協(xié)議書
- 2025年互聯(lián)網(wǎng)+政務(wù)服務(wù)在推動(dòng)政府職能轉(zhuǎn)變中的關(guān)鍵作用
- 起重作業(yè)安全知識(shí)考核試題(含答案)
- 2025至2030中國(guó)醫(yī)療頭戴式顯示器行業(yè)產(chǎn)業(yè)運(yùn)行態(tài)勢(shì)及投資規(guī)劃深度研究報(bào)告
- 槍支安全管理培訓(xùn)課件
- DB45∕T 1098-2024 橡膠瀝青路面施工技術(shù)規(guī)范
- 2025年沈陽(yáng)水務(wù)集團(tuán)招聘筆試沖刺題2025
- 《蠶絲》教學(xué)課件
- 浙江省麗水市普通高中2024-2025學(xué)年高二上學(xué)期期末教學(xué)質(zhì)量監(jiān)控日語(yǔ)試卷(PDF版含答案不含音頻和聽力原文)
- 2025至2030電子海圖行業(yè)產(chǎn)業(yè)運(yùn)行態(tài)勢(shì)及投資規(guī)劃深度研究報(bào)告
- 東莞東華分班數(shù)學(xué)試卷
- 江西省金控科技產(chǎn)業(yè)集團(tuán)有限公司招聘筆試題庫(kù)2025
- 2025年湖北省中考英語(yǔ)試題(附答案)
評(píng)論
0/150
提交評(píng)論