文檔簡介
1、Day/DateDay/Date天/日期TestTest試驗(yàn)PurposePurpose ofof Tes6Tes6式驗(yàn)?zāi)康腡estTest activitiesactivities試驗(yàn)活動RemarksRemarks備注Day 1第1天11/08/2006Rotor runin:轉(zhuǎn)子試 轉(zhuǎn):Crank test搖轉(zhuǎn)試驗(yàn)1. Listen for rubs or unusual noises聽是臺后摩擦和異常噪音2. Functional test of emergency tripbutton緊急跳閘按鈕的功能試 驗(yàn)3. Purge speed cranking for rotorvibra
2、tion check以吹掃速度搖 轉(zhuǎn),檢查轉(zhuǎn)子振動情況4. Monitor LCI starting temperatures andoperation監(jiān)視器LCI起動溫度和運(yùn)行5. Air blowing the purge piping of D5 andPM4 gas fuel during crank搖轉(zhuǎn)期間給D5和PM4吹 掃管鼓風(fēng)6. Check operation of lift oil and turninggear檢查頂軸油和盤車 的運(yùn)行1. Roll up to 50 rpm trip by DCS emergency pushbutton and 200 rpm and
3、trip by GT MK 6 controlemergency stop通 過DCS緊急按鈕逐漸增加到50rpm,通過GT MK6控制緊急停機(jī) 跳閘2. Restart, accelerate to go to Purge speed for5min and select normal stop重起, 加速到吹掃速度5分鐘,選擇正常停 止3. Restart, hold at purge speed and air blowingthe piping of D5 and PM4, trip by DCS customertrip (L4CT) after 30 Min crank test重
4、起,保持在吹掃速 度,給D5和PM4管道鼓風(fēng),在30分鐘搖轉(zhuǎn)試驗(yàn)后通過DCS客戶跳閘(L4CT)跳閘4. Verify coast down to turning gear核實(shí) 惰行至盤車5. Monitor vibration levels through out the testperiod監(jiān)視整個試驗(yàn)期間的振動 級Use auto start-up sequences to prepare the unitfor a-ReSdyrt米用自動走動順序?qū)C(jī)組準(zhǔn)備好“準(zhǔn)備起動Rub checks are performed檢查摩擦ADRE vibration monitor to be con
5、nected連接 ADRE 振動監(jiān)視器AfterAfter Shut-downShut-down停機(jī)后Reinstate the piping spool of D5 and PM4 pipe workafter shutdown停機(jī)后重新恢 復(fù)D5和PM5管子的導(dǎo)管頁次1 /19Day 1第1天11/08/2006Rotor runin:轉(zhuǎn)子試 轉(zhuǎn):False firing,actual firstfiring andFSNL假點(diǎn)火,實(shí)際第一 次點(diǎn)火和FSNL1. False fire假點(diǎn)火2. Actual First Fire to FSNL實(shí)際第一次點(diǎn)火至FSNL1.Select fi
6、re for false fire and check unitfor gas leaks, and P2 pr. Check選擇假點(diǎn)火的火,檢查機(jī)組是否漏 氣,和P2。檢查2.Verify unit trip and coast down to turninggear核實(shí)機(jī)組跳閘,惰行至 盤車3.Actual first firing and check for gasleaks at firing speed實(shí)際第一次點(diǎn) 火,檢查點(diǎn)火速度時是否漏氣4.Acceleration unit up to FSNL andstabilized min 4 hours thermal soak5.S
7、tart up heater commissioning將機(jī) 組加速到FSNL,至少穩(wěn)定4小時 熱浸泡6.Normal down unit and keep turning gear onfor natural cooldown.機(jī)組正 常停機(jī),保持盤車,自然冷卻7.Monitor vibration levels through out thetest period監(jiān)視整個試驗(yàn)期間的 振動級頁次2 /19AfterAfter Shut-downShut-down停機(jī)后1. Install balance shots if required如果需要, 安 裝平衡粒2. Repair any l
8、eaks / defects identified修復(fù)發(fā)現(xiàn)的 泄漏/缺陷3. Replace or clean the strainers of LP Hood spray, CEP,BFP and drains spray and perform any other maintenanceitems as required換或清潔低壓罩 噴嘴、EDP、BFP和疏水噴嘴的濾網(wǎng),根據(jù)需 要執(zhí)行其它維護(hù)項(xiàng)4. Inspect and clean start up temporary gas strainers andsealing/cooling air if required to clean檢
9、查 和清潔起動臨時氣體濾網(wǎng)和密封/冷卻空氣如 果需要清潔的話g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機(jī)組首次點(diǎn)火至PACPAC時間表及詳細(xì)的調(diào)試項(xiàng)Day/DateDay/Date天/日期TestTest試驗(yàn)PurposePurpose ofof TestiTesti式驗(yàn)?zāi)康腡estTest activitiesactivities試驗(yàn)活動RemarksR
10、emarks備注Day 2第2天11/09/2006Rotor runin:轉(zhuǎn)子試 轉(zhuǎn);Start up andFSNL起動和FSNL1. FSNL and heat soak for 4 hoursFSNL和熱浸泡4小時1.Start normally, go to FSNL and stay there ifvibration levels acceptable正 常起動,至FSNL,如果振動級可 以接受,保持2.Electrical test電氣試驗(yàn)1) Shaft voltage test軸電壓試驗(yàn)2) AC impedance test交流阻抗試驗(yàn)3) Main transforme
11、r Short circuit test with theconnection of Generator by EX2100 power通過EX2100電力連接發(fā) 電機(jī)做主變壓器短路試驗(yàn)4) Open circuit test by EX2100, The test voltagewill be variable from 0V to 20.52KV(1.08PU of19KV)通過EX2100做開路試驗(yàn),試驗(yàn)電壓從0V至20.52KV(19KV的1.08PU/)5)Megger check for seal casing and bearing (T8)at collector end si
12、de用邁格表檢 查收集器端側(cè)密封缸和軸承(T8)3. Check HRSG expansion檢查HRSG的膨脹4. Shutdown unit and keep turning gear on fornatural cool down.讓機(jī)組停機(jī), 保持盤車,自然冷卻5. Monitor vibration levels through out the testperiod監(jiān)視整個試驗(yàn)期間的振 動級6. By pass valve commissioning旁路閥 點(diǎn)挑14/ 19AfterAfter Shut-downShut-down停機(jī)后1. Install balance shots
13、 if required如果需要, 安裝平衡粒2. Repair any leaks / defects identified修復(fù)發(fā) 現(xiàn)的泄漏/缺陷3. Replace or clean the strainer of LP Hood spray, anddrains spray and perform any other maintenance itemsas required換或清潔低 壓罩噴嘴和疏水噴嘴,根據(jù)需要執(zhí)行其它 維護(hù)項(xiàng)4. Inspect and clean start up temporary gas strainersand sealing/cooling air if r
14、equired to clean檢查和清潔起動臨時氣體濾網(wǎng)和密封/冷卻空氣(如果需要清潔的話)2006年11月6日- - 版次0g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機(jī)組首次點(diǎn)火至PACPAC時間表及詳細(xì)的調(diào)試項(xiàng)2006年11月6日版次0頁次5 / 19Day/DateDay/Date天/日期TestTest試驗(yàn)PurposePurpose ofof
15、Tes6Tes6式驗(yàn)?zāi)康腢nitUnit activitiesactivities機(jī)組活動RemarksRemarks備注g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機(jī)組首次點(diǎn)火至PACPAC時間表及詳細(xì)的調(diào)試項(xiàng)2006年11月6日版次0g TheThe scheduleschedule andand detaildetail commissioningco
16、mmissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機(jī)組首次點(diǎn)火至PACPAC時間表及詳細(xì)的調(diào)試項(xiàng)2006年11月6日版次0Day 3第3天11/10/2006RotorRun-in:;轉(zhuǎn)了試 轉(zhuǎn);FSNL1. Run up to FSNL運(yùn)行至FSNL2. Perform off line electrical tests執(zhí) 行脫機(jī)電氣試驗(yàn)3. Dummy synchronization test偽同 步試驗(yàn)4. Protection test保護(hù)試驗(yàn)5. Synch check同步
17、檢查6. EX2100 on-line test EX2100聯(lián)機(jī) 試驗(yàn)1.Unit restart to FSNL機(jī)組重新起動至FSNL2.EX2100 Offline test EX2100脫機(jī)試驗(yàn)1) Manual high and low limit,手動上下極 限2) Offline OEL limit test脫機(jī)OEL極限 試驗(yàn)3) Offline OEL trip test.脫機(jī)OEL跳閘 試驗(yàn)4)Voltage high trip test.電壓局跳閘試驗(yàn)5) V/HZ straight time/ Reverse time trip.V/HZ正向/反向時間跳閘6) Auto
18、 High and low limit test.自動上下 極證試驗(yàn)7)PT failure Test. PT故障試驗(yàn)8) Auto/Manual transfer test.自動/手動傳 輸試驗(yàn)9)M1/M2 transfer test.M1/M2傳輸試驗(yàn)3.Dummy Synch test偽同步試驗(yàn)4.Perform synchronize to grid and reverse power52G trip test if vibration levelsAcceptable如果振動級可以接受,與電網(wǎng)并網(wǎng),倒送電52G跳閘試驗(yàn)5.EX2100 on-line test (25% load)
19、EX2100聯(lián)機(jī)試驗(yàn)(25%負(fù)荷)6.Monitor vibration levels through out the testperiod.監(jiān)視整個試驗(yàn)期間的振動級7. By pass valve commissionin 西路閥 門調(diào)試AfterAfter Shut-downShut-down停機(jī)后1. Install balance shots if required如果需要, 安裝平衡粒2. Repair any leaks / defects identified修復(fù)發(fā) 現(xiàn)的泄漏/缺陷3. Replace or clean the strainers of LP Hood spray
20、,CEP, BFP and drains spray and perform any othermaintenance items as requirecMR或清潔低壓罩噴嘴、EDP、BFP和疏水噴 嘴的濾網(wǎng),根據(jù)需要執(zhí)行其它維護(hù)項(xiàng)4. Inspect and clean start up temporary gas strainersand sealing/cooling air if required to clean檢查和清潔起動臨時氣體濾網(wǎng)和密封/冷卻空氣(如果需要清潔的話)6 / 19g TheThe scheduleschedule andand detaildetail comm
21、issioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機(jī)組首次點(diǎn)火至PACPAC時間表及詳細(xì)的調(diào)試項(xiàng)2006年11月6日版次0g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機(jī)組首次點(diǎn)火至PACPAC時間表及詳細(xì)的調(diào)試項(xiàng)頁次9 / 1
22、92006年11月6日版次0Day 4第4天11/11/2006Load test負(fù)荷試驗(yàn)Combinedcycle聯(lián) 合循環(huán)1. Start up and Synch to grid起動 和并網(wǎng)2. Steam cleaning蒸汽清洗3. Line up of chemical sampling, dosingand CPPiMI整化學(xué)取樣、加藥和CPP4. Steam to turbine if steam qualityacceptable如果蒸汽質(zhì)量可以接受,給汽機(jī)送蒸汽5. Over speed trip test超速跳閘試 驗(yàn)1. Restart unit to FSNL and
23、 synch to grid重新起動機(jī)組至FSNL,并網(wǎng)2. Steam cleaning and steam to turbine if steamquality acceptable如果蒸汽質(zhì)量 可以接受,蒸汽清洗,給汽機(jī)送蒸汽3. Steam temperature matching tes蒸汽 溫度匹配試驗(yàn)4. ST 25% load and min 4 hours soak蒸汽 輪機(jī)25%負(fù)荷,至少浸泡4小時5. 52G breaker off and over speed trip test 52G斷路器斷開,超速跳閘試驗(yàn)6. Monitor vibration levels th
24、rough out the testperiod監(jiān)視整個試驗(yàn)期間的振動 級AfterAfter Shut-downShut-down停機(jī)后1. Install balance shots if required如果需要, 安裝平衡粒2. Repair any leaks / defects identified修復(fù)發(fā) 現(xiàn)的泄漏/缺陷3. Replace or clean the strainer of LP Hood spray, anddrains spray and perform any other maintenance itemsas required!換或清潔低 壓罩噴嘴和疏水噴嘴
25、,根據(jù)需要執(zhí)行其它 維護(hù)項(xiàng)4. Inspect and clean start up temporary gas strainersand sealing/cooling air if required to clean檢查和清潔起動臨時氣體濾網(wǎng)和密封/冷卻空氣如果需要清潔的話Day/DateDay/Date天/日期TestTest試驗(yàn)PurposePurpose ofof Tes6Tes6式驗(yàn)?zāi)康腢nitUnit activitiesactivities機(jī)組活動RemarksRemarks備注g TheThe scheduleschedule andand detaildetail comm
26、issioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機(jī)組首次點(diǎn)火至PACPAC時間表及詳細(xì)的調(diào)試項(xiàng)頁次10 / 192006年11月6日版次0Day 5第5天11/12/2006DLN tuningPPM mode tobase LoadDLN調(diào)整PPM模式全基 本負(fù)荷1. Combined cycle base load (PPM)operation聯(lián)合循環(huán)根本負(fù)荷(PPM)運(yùn)行2. Preliminary DLN tuning up base loadwith
27、 strainer (PPM)帶濾網(wǎng) 初步DLN調(diào)整根本負(fù)荷1. Restart unit and load to combined cycle baseload with PPM重新起動機(jī)組,加 載至聯(lián)合循環(huán)根本負(fù)荷PPM2. Perform DLN tuning執(zhí)行DLN調(diào)整3. Performance heater commissioning執(zhí) 行加熱器調(diào)試3. EX2100 step response test (25%, 50%, 75% and100%).EX2100階躍響應(yīng)試驗(yàn)(25%, 50%, 75%和100%)4. PT failure test at on-line co
28、ndition (25% only)聯(lián)機(jī)狀態(tài)下PT障試馬繪(僅25%)5. HRSG safety valve test if any HRSG安 全閥門試驗(yàn)(如果有的話)6. Perform normal shutdown afterwards and monitorflame out at correct speed during unit coast down執(zhí)行正常停機(jī),監(jiān)視 機(jī)組惰行期間正確速度時的熄火情況7. Monitor vibration levels through out the testperiod監(jiān)視整個試驗(yàn)期間的振動級8. Check HRSG expansion檢
29、查HRSG的 膨脹AfterAfter Shut-downShut-down停機(jī)后1. Install balance shots if required如果需要, 安裝平衡粒2. Repair any leaks / defects identified修復(fù)發(fā) 現(xiàn)的泄漏/缺陷3. Replace or clean the strainer of LP Hood spray, anddrains spray and perform any other maintenance itemsas required!(換或清潔低 壓罩噴嘴和疏水噴嘴,根據(jù)需要執(zhí)行其它 維護(hù)項(xiàng)4. Inspect and
30、 clean start up temporary gas strainersand sealing/cooling air if required to clean檢查和清潔起動臨時氣體濾網(wǎng)和密封/冷卻空氣(如果需要清潔的話)g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機(jī)組首次點(diǎn)火至PACPAC時間表及詳細(xì)的調(diào)試項(xiàng)2006年11月6日版次0頁次11 / 1
31、9Day 6第6天11/13/2006PPM base loadfor 30 hoursPPM負(fù) 荷30小 時CombinedCycle BaseLoad聯(lián) 合循環(huán)基 本負(fù)荷1. Combined cycle base load (PPM)operation聯(lián)合循環(huán)根本負(fù)荷(PPM)運(yùn)行2. Continue to run 30 hours at PPM base 10ad繼續(xù)以PPM根本負(fù)荷 運(yùn)行30小時1. Restart unit and load to combined cycle baseload (PPM正新起動機(jī)組,加載 到聯(lián)合循環(huán)根本負(fù)荷(PPM)2. Monitor vibr
32、ation levels監(jiān)視振動級Inspect and clean start up temporary gas strainers andsealing/cooling air if required to clean檢查和清潔起動臨時氣體濾網(wǎng)和密封/冷卻空氣(如果需要清潔的話)Day 7第7天11/14/2006PPM base loadfor 30 hoursPPM基 本負(fù)荷30小時CombinedCycle BaseLoad聯(lián) 合循環(huán)基 本負(fù)荷1. Combined cycle base load (PPM) Operation聯(lián)合循環(huán)根本負(fù)荷(PPM)運(yùn)行2. Continue t
33、o run 30 hours at PPM base 10ad繼續(xù)以PPM根本負(fù)荷運(yùn)行30小時1.Continue to run combined cycle base load (PPM)繼續(xù)運(yùn)行聯(lián)合循環(huán)根本負(fù)荷(PPM)2. Monitor vibration levels監(jiān)視振動級3.Perform normal shutdown afterwards and monitorflame out at correct speed during unit coast down執(zhí)行正常停機(jī),監(jiān)視 機(jī)組惰行期間正常速度時的熄火Inspect and clean start up temporar
34、y gas strainers andsealing/cooling air if required to clean檢查和清潔起動臨時氣體濾網(wǎng)和密封/冷卻空氣(如果需要清潔的話)Day/DateDay/Date天/日期TestTest試驗(yàn)PurposePurpose ofof TestiTesti式驗(yàn)?zāi)康腢nitUnit activitiesactivities機(jī)組活動RemarksRemarks備注Day 8第8天Cooling down冷Cooling down to remove all of strainers冷卻后撤除所有濾網(wǎng)Cooling down to remove all o
35、f strainers冷卻后撤除所有濾網(wǎng)Remove all of strainers for gas fuel, sealing andcooling air, steam strainers after comple-g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機(jī)組首次點(diǎn)火至PACPAC時間表及詳細(xì)的調(diào)試項(xiàng)頁次12 / 192006年11月6日版次011
36、/15/2006卻tion of 30 hours operation運(yùn)行30小時結(jié)束 后撤除氣體燃料、密封空氣和冷卻空氣的所 有濾網(wǎng)及蒸汽濾網(wǎng)Day 09第9天11/16/2006Cooling down冷卻Cooling down to remove all of strainers冷卻后撤除所有濾網(wǎng)Cooling down to remove all of strainers冷卻后撤除所有濾網(wǎng)Inspect inlet air and exhaust area檢查進(jìn)氣和排氣區(qū)域Remove all of strainers for gas fuel, sealing andcooling
37、 air, steam strainer after completion of 30hours operation運(yùn)彳330小時結(jié)束后拆 除氣體燃料、密封空氣和冷卻空氣的所有濾 網(wǎng)及蒸汽濾網(wǎng)Day 10第10天11/17/2006Cooling down冷卻Cooling down to remove all of strainers冷卻后撤除所有濾網(wǎng)Cooling down to remove all of strainers冷卻后撤除所有濾網(wǎng)Inspect inlet air and exhaust area檢查進(jìn)氣和排氣區(qū)域Remove all of strainers for gas
38、 fuel, sealing andcooling air, steam strainer after completion of 30hours operation運(yùn)彳330小時結(jié)束后拆 除氣體燃料、密封空氣和冷卻空氣的所有濾 網(wǎng)及蒸汽濾網(wǎng)Day 11第11天11/18/2006DLN tuningPremixed modeto base LoadDLN調(diào) 整預(yù)混合 模式全基 本負(fù)荷DLN1. Combined cycle base load (PM) operation聯(lián)合循環(huán)根本負(fù)荷(PM)運(yùn)行2. DLN tuning without strainer for Premixedmode
39、預(yù)混合模式無濾網(wǎng)DLN調(diào)整3. Load reject test for 50% and 100%50%和100%的甩負(fù)荷試驗(yàn)1.Restart unit and load to combined cycle baseload with PM重新起動機(jī)組,加載 到聯(lián)合循環(huán)根本負(fù)荷PM2. Perform DLN tuning執(zhí)行DLN調(diào)整3.Load reject test for 50% and 100% 50%和100%的甩負(fù)荷試驗(yàn)4.Re-Synch to gird and base loacfi新并 網(wǎng)和根本負(fù)荷5.Prepare 168 hours reliability test
40、run準(zhǔn) 備168小時可靠性試運(yùn)CEMS ready to DLN tuningCEMS準(zhǔn)備DLN調(diào)整Day 12第12天11/19/2006Reliabilityrun 168hrs, 11. Combined cycle base load (PM) operation聯(lián)合循環(huán)根本負(fù)荷(PM)運(yùn)行1. Combined cycle base load (PM) opera- tion聯(lián)合循環(huán)北本負(fù)荷(PM)運(yùn)行CEMS ready to PM base loadCEMS準(zhǔn)備PM根本負(fù)荷g TheThe scheduleschedule andand detaildetail commiss
41、ioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機(jī)組首次點(diǎn)火至PACPAC時間表及詳細(xì)的調(diào)試項(xiàng)頁次13 / 192006年11月6日版次0day可靠 性運(yùn)行168小 時,第1天Day 13第13天11/20/2006Reliabilityrun 168hrs, 2day可 靠性運(yùn)行168小 時,第2天1. Combined cycle base load (PM) operation聯(lián)合循環(huán)根本負(fù)荷(PM)運(yùn)行1. Combined cycle base load
42、(PM) opera- tion聯(lián)合循環(huán)乩本負(fù)荷(PM)運(yùn)行CEMS ready to PM base load CEMS準(zhǔn)備PM根本負(fù)荷Day/DateDay/Date天/日期TestTest試驗(yàn)PurposePurpose ofof TestiTesti式驗(yàn)?zāi)康腢nitUnit activitiesactivities機(jī)組活動RemarksRemarks備注Day 14第14天11/21/2006Reliabilityrun 168hrs, 3day可靠 性運(yùn)行168小時,第3天1. Combined cycle base load (PM) operation聯(lián)合循環(huán)根本負(fù)荷(PM)運(yùn)行
43、1. Combined cycle base load (PM) opera- tion聯(lián)合循環(huán)根本負(fù)荷(PM)運(yùn)行CEMS ready to PM base loadCEMS準(zhǔn)備PM根本負(fù)荷Day 15第15天11/22/2006Reliabilityrun 168hrs, 4day可靠1. Combined cycle base load (PM) operation聯(lián)合循環(huán)根本負(fù)荷(PM)運(yùn)行1. Combined cycle base load (PM) opera- tion聯(lián)合循環(huán):i本負(fù)荷(PM)運(yùn)行CEMS ready to PM base loadCEMS準(zhǔn)備PM根本負(fù)荷g
44、TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機(jī)組首次點(diǎn)火至PACPAC時間表及詳細(xì)的調(diào)試項(xiàng)頁次14 / 192006年11月6日版次0性運(yùn)行168小時,第4天Day 16第16天11/23/2006Reliabilityrun 168hrs, 5day可靠 性運(yùn)行168小時,第5天1. Combined cycle base load (PM) operatio
45、n聯(lián)合循環(huán)根本負(fù)荷(PM)運(yùn)行1. Combined cycle base load (PM) opera- tion聯(lián)合循環(huán)根本負(fù)荷(PM)運(yùn)行CEMS ready to PM base loadCEMS準(zhǔn)備PM根本負(fù)荷Day 17第17天11/24/2006Reliabilityrun 168hrs, 6day可靠 性運(yùn)行168小時,第6天1. Combined cycle base load (PM) operation聯(lián)合循環(huán)根本負(fù)荷(PM)運(yùn)行1. Combined cycle base load (PM) opera- tion聯(lián)合循環(huán)乩本負(fù)荷(PM)運(yùn)行CEMS ready to
46、 PM base load CEMS準(zhǔn)備PM根本負(fù)荷g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機(jī)組首次點(diǎn)火至PACPAC時間表及詳細(xì)的調(diào)試項(xiàng)頁次15 / 192006年11月6日版次0Day 18第18天11/25/2006Reliabilityrun 168hrs, 7day可靠 性運(yùn)行168小時,第7天1. Combined cycle base lo
47、ad (PM) operation聯(lián)合循環(huán)根本負(fù)荷(PM)運(yùn)行1. Combined cycle base load (PM) opera- tion聯(lián)合循環(huán):i本負(fù)荷(PM)運(yùn)行2. Normal shut down after completion of 168 hoursreliability run test168小時可靠性運(yùn)行試驗(yàn)完成后正常停機(jī)CEMS ready to PM base loadCEMS準(zhǔn)備PM根本負(fù)荷g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems
48、ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機(jī)組首次點(diǎn)火至PACPAC時間表及詳細(xì)的調(diào)試項(xiàng)頁次16 / 192006年11月6日版次0Day 19第19天11/26/20068 days startup and shutdown daily,1 day 母天起動 和停機(jī),共 8 天, 第1 天8 days start up and shut down daily每天1起動和停機(jī),共 8 天8 days start up and shut down daily每7動和停機(jī),共 8 天8 days start up and s
49、hut down daily每7動 和停機(jī),共 8 天Day/DateDay/Date天/日期TestTest試驗(yàn)PurposePurpose ofof TestiTesti式驗(yàn)?zāi)康腢nitUnit activitiesactivities機(jī)組活動RemarksRemarks備注Day 20第20天11/27/20068 days startup and shutdown daily,2 day1 day每天 起動和停 機(jī),共 8大,第 2天8 days start up and shut down daily每天二起動和停機(jī),共 8 天8 days start up and shut dow
50、n daily每 動和停機(jī),共 8 天8 days start up and shut down daily每動 和停機(jī),共8天Day 21第21天11/28/20068 days startup and shutdown daily,3 day1 day每天 起動和停8 days start up and shut down daily每天1起動和停機(jī),共 8 天8 days start up and shut down daily每7動和停機(jī),共 8 天8 days start up and shut down daily每7動 和停機(jī),共8天g TheThe scheduleschedu
51、le andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機(jī)組首次點(diǎn)火至PACPAC時間表及詳細(xì)的調(diào)試項(xiàng)頁次17 / 192006年11月6日版次0機(jī),共 8 大,第 3天Day 22第22天11/29/20068 days startup and shutdown daily,4 day1 day每關(guān) 起動和停 機(jī),共 8大,第 4天8 days start up and shut down daily每天:起動和
52、停機(jī),共 8 天8 days start up and shut down daily每7動和停機(jī),共8天8 days start up and shut down daily每7動 和停機(jī),共 8 天Day 23第23天11/30/20068 days start upand shut downdaily, 5 day1day 每天 起動和停 機(jī),共 8 大,第 5天8 days start up and shut down daily每天:起動和停機(jī),共 8 天8 days start up and shut down daily每天起 動和停機(jī),共8天8 days start up an
53、d shut down daily每天起動 和停機(jī),共 8 天Day/DateDay/Date天/日期TestTest試驗(yàn)PurposePurpose ofof Tes6Tes6式驗(yàn)?zāi)康腢nitUnit activitiesactivities機(jī)組活動RemarksRemarks備注g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機(jī)組首次點(diǎn)火至PACPAC時間表
54、及詳細(xì)的調(diào)試項(xiàng)2006年11月6日版次0頁次15 /19Day 24第24天12/01/20068 days startup and shutdown daily, 6day1 day 每天 起動和停機(jī),共 8 大,第 6天8 days start up and shut down daily每天1起動和停機(jī),共 8 天8 days start up and shut down daily每天起 動和停機(jī),共 8 天8 days start up and shut down daily每天起動 和停機(jī),共 8 天Day 25第25天12/02/20068 days startup and sh
55、utdown daily, 7day1 day 每天 起動和停機(jī),共 8 大,第 7天8 days start up and shut down daily每天二起動和停機(jī),共 8 天8 days start up and shut down daily每天起 動和停機(jī),共 8 天8 days start up and shut down daily每天起動 和停機(jī),共8天g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst
56、 firingfiring toto PAPAC C1 1號機(jī)組首次點(diǎn)火至PACPAC時間表及詳細(xì)的調(diào)試項(xiàng)頁次19 / 192006年11月6日版次0Day 26第26天12/03/20068 daysstart up andshut downdaily,8day1 day 每天起 動 和 停機(jī),共 8 大,第 8 大8 days start up and shut down daily每天1起動和停機(jī),共 8 天8 days start up and shut down daily每天起 動和停機(jī),共 8 天8 days start up and shut down daily每天起動 和停
57、機(jī),共 8 天Day 27第27天12/04/2006No Test沒有試驗(yàn)Cooling冷卻Cooling for water wash冷卻準(zhǔn)備水洗Install performance test equipments安裝性能 試驗(yàn)設(shè)備Day 28第28天12/05/2006No Test沒有試驗(yàn)Cooling冷卻Cooling for water wash冷卻準(zhǔn)備水洗Install performance test equipments安裝性能 試驗(yàn)設(shè)備Day/DateDay/Date天/日期TestTest試驗(yàn)PurposePurpose ofof Tes6Tes6式驗(yàn)?zāi)康腢nitUni
58、t activitiesactivities機(jī)組活動RemarksRemarks備注Day 29第29天12/06/2006Offlinewaterwash脫 機(jī)水洗Off line water wash脫機(jī)水洗Off line water wash脫機(jī)水洗Off line water wash脫機(jī)水洗g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機(jī)組首次點(diǎn)火
59、至PACPAC時間表及詳細(xì)的調(diào)試項(xiàng)頁次20 / 192006年11月6日版次0Day 30第30天12/07/2006IntegratedDLNTuning整 體DLN調(diào)整Integrated DLN Tuning for part load部 分負(fù)荷整體DLN調(diào)整Integrated DLN Tuning for part load局部負(fù)荷 整體DLN調(diào)整Collect data收集數(shù)據(jù)Day 31第31天12/08/2006No Test沒有試驗(yàn)Cooling冷卻Cooling for water wash冷卻準(zhǔn)備水洗Day 32第32天12/09/2006No Test沒有試驗(yàn)Cooling冷卻Cooling for water
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025至2030年中國三芯控制插座市場分析及競爭策略研究報(bào)告
- 2025至2030年中國三甲醇氨基甲烷行業(yè)投資前景及策略咨詢報(bào)告
- 個人品牌建設(shè)的策略與實(shí)踐
- 中國金融服務(wù)業(yè)的現(xiàn)狀及未來趨勢
- 2025年貴州建筑安全員-B證考試題庫及答案
- 2025至2030年中國PP-R冷熱水繞曲管市場現(xiàn)狀分析及前景預(yù)測報(bào)告
- 2025至2030年中國GRC輕質(zhì)隔墻條板行業(yè)投資前景及策略咨詢報(bào)告
- 2025至2030年中國ABS橢圓形皮質(zhì)垃圾桶行業(yè)發(fā)展研究報(bào)告
- 個人財(cái)富配置模型搭建與調(diào)整
- 2025至2030年P(guān)VC組合花園管項(xiàng)目可行性研究報(bào)告
- 企業(yè)廉潔風(fēng)險(xiǎn)防控課件教學(xué)
- 中醫(yī)護(hù)理三基練習(xí)題庫+答案
- 2025年護(hù)士三基考核試題及答案
- 七年級下冊2025春季歷史 教學(xué)設(shè)計(jì)《明朝對外關(guān)系》 學(xué)習(xí)資料
- 《設(shè)備管理標(biāo)準(zhǔn)化實(shí)施手冊》
- 湖南省長沙市明達(dá)中學(xué)2024-2025學(xué)年九年級下學(xué)期入學(xué)考試英語試卷(含答案無聽力原文及音頻)
- 火龍罐綜合灸療法
- 頰癌病人的護(hù)理查房
- 特種設(shè)備使用登記表(范本)
- YSJ 007-1990 有色金屬選礦廠 試驗(yàn)室、化驗(yàn)室及技術(shù)檢查站工藝設(shè)計(jì)標(biāo)準(zhǔn)(試行)(附條文說明)
- 水利水電工程專業(yè)英語——水工結(jié)構(gòu)篇