1、合同Contract of Construction Project 合同編號(hào): Contract Number: 工程名稱: Project Name: 發(fā)包方 (甲方): 工程設(shè)計(jì)顧問 (北京)Employer (Party A): International Consulting Engineers ( Beijing) Limited 承包方(乙方) : 中寰藝高建筑裝飾工程有限公司Contractor (Party B): Zhong Huanyigao Building Decoration Engineering Co. , Ltd 根據(jù)中華人民共和國(guó)合同法和建筑安裝工程承包合同
2、條例及有關(guān)規(guī)定,為明確雙方 在施工過程中的權(quán)利、義務(wù)和經(jīng)濟(jì)責(zé)任,經(jīng)雙方協(xié)商同意簽訂本合同。In order to make definite of the rights, obligations and economic responsibilities of both parties during the construction, the parties, in accordance with The PRC Contract Law and Construction Engineering Contract Regulations and relevant provisions, agr
3、ee to sign this contract.第一條 工程項(xiàng)目 Article 1, Project item1 工程地點(diǎn): Project site:2. 工程范圍: Scope of project3. 工程造價(jià):人民幣 元整 (該造價(jià)為包工包料價(jià) )Project cost: PMB Yuan only(Cost of this contract is the contract price for labor and materials)第二條施工準(zhǔn)備 Article 2, Preparation for construction 1甲方協(xié)助乙方辦理臨時(shí)水電及垂直運(yùn)輸,提供建筑圖紙及
4、有關(guān)隱蔽障礙物的資料。Party A shall assists party B to deal with the procedures of temporary hydropower and vertical transportation and provide architectural drawings and documents of relevant concealed obstacles .2乙方: . Party B: 負(fù)責(zé)施工區(qū)域的臨時(shí)設(shè)施、水電管線的鋪設(shè)、管理、使用和維修工作;Be responsible for the works of laying, management
5、, use and maintenance of the temporary facilities, water and electricity pipeline in the construction area. 組織施工管理人員和材料、施工機(jī)械進(jìn)場(chǎng);Organize construction management staff and construction materials, construction machinery enter the Site. 負(fù)責(zé)在裝修期間保持公共地方清潔及每天負(fù)責(zé)將裝物料棄置于由管理處指定的垃圾收集處。Be responsible for keeping
6、public places clean during construction and packing construction material and leaving in the garbage collection place designated by management office each day.第三條工程期限 Article 3 Period of Construction1. 根據(jù)工期和使用需要,商定工程總施工期為 天(日歷天) ,自 年 月 日開工 至 年 月 日完工According to the period of construction and the use
7、 need,the total construction periodagreed shall bedays (Calendar days), start from the date ofand complete on thedate of .2如遇下列情況,經(jīng)甲方現(xiàn)場(chǎng)代表簽證后,工期相應(yīng)順延:Construction period shall be prolonged upon Party A site representatives confirmation when the matters occur as follows. 按施工準(zhǔn)備規(guī)定,甲方未協(xié)助乙方辦理臨時(shí)水電及垂直運(yùn)輸,影響進(jìn)場(chǎng)
8、施工;According to the requirements of construction preparation, Party A fail tot assist Party B to apply for temporary water and electricity and vertical transportation and have an impact on Party B construction; s requirement of addition 因甲方提出增減項(xiàng)目而造成重大設(shè)計(jì)變更,因而影響進(jìn)度; The material modification or change
9、of design due to the party A or deletion of project have the effect of hindrance on the progress of works. 未按合同規(guī)定撥付預(yù)付款、工程款而影響施工;Party A fail to pay the advance payment and construction cost to party B and impact the construction progress;人力不可抗拒的因素而延誤工期。The delay of schedule of construction due to Fo
10、rce Majeure.第四條 工程質(zhì)量 Article 4 The quality of project 一本工程質(zhì)量經(jīng)雙方研究要求達(dá)到雙方約定之驗(yàn)收標(biāo)準(zhǔn)。The quality of project should achieve the requirements of acceptance agreed by both parties.二乙方必須嚴(yán)格按照施工圖紙、 說明文件和國(guó)家頒發(fā)的建筑工程規(guī)范、 規(guī)程和標(biāo)準(zhǔn)進(jìn)行施 工,并接受甲方的監(jiān)督。Party B should carry on the construction in strict accordance with drawing,
11、specification file and regulations and specifications authorized by the competent authorities and be under the supervision of Party A.Party B should, during the construction,三乙方在施工過程中必須遵守下列規(guī)定: comply with the provisions as follows:1 由乙方提供給甲方的所有材料必須經(jīng)甲方同意方可使用,未按要求購(gòu)買嚴(yán)禁使用; All materials provided by Part
12、y B should be subject to the approval of Party A prior to use, And none of the same being bought without conformity with Party A requirements can be used.2隱蔽工程必須經(jīng)甲乙雙方檢查,方可進(jìn)行下一道工序;The concealed works should be checked by both parties before the next progress;3工程竣工后,乙方按規(guī)定對(duì)工程實(shí)行保修,保修時(shí)間自通過竣工驗(yàn)收之日算起,保修期 一年
13、。Party B shall take the liability of maintenance following the complete of works. The period of maintenance shall be one year from the day of acceptance of complete.第五條 工程價(jià)款的支付與結(jié)算 Article 5 Payment and settlement of the contract price 合同總價(jià) X50 %,即 元 The total con tract price 50%, which is Yua n.中期款
14、The payment of medium-term工程進(jìn)度過半三日內(nèi) Within 3 (three) days after the progress more than half.合同總價(jià)X40 %,即元 The total con tract price40%, which isYuan.尾款 Final Payment竣工驗(yàn)收結(jié)算后七日內(nèi) settlement.Within 7 (seven) days after the completion acceptance and合同總價(jià)X10 %,即元 The total con tract price10%, which isYuan.A
15、rticle6 The Modification of Construction and Design 說明和有關(guān)技術(shù)資料, 作為施工的有效依據(jù), 開工前由甲方組織第六條 施工與設(shè)計(jì)變更 一乙方交付的設(shè)計(jì)圖紙、 簽字認(rèn)同,作為施工的補(bǔ)充依據(jù),甲、乙雙方均不得擅自修改。Design drawing, illustration and relevant technical data consigned by party B are thebasis for construction and shall be confirmed by party A s signature,dweheimchedi
16、sasthe supplementary basis and shall be modified by any party without authorization.二施工中如發(fā)現(xiàn)因甲方要求而發(fā)生的設(shè)計(jì)錯(cuò)誤或嚴(yán)重不合理的地方, 乙方應(yīng)及時(shí)以書面形 式通知甲方, 由甲方及時(shí)會(huì)同乙方等有關(guān)單位研究確定修改意見或變更設(shè)計(jì)文件,乙方按修改或變更的設(shè)計(jì)文件進(jìn)行施工。若發(fā)生增加費(fèi)用(包括返工損失、停工、窩工、人員和機(jī)構(gòu) 設(shè)備調(diào)遷、材料構(gòu)配件積壓的實(shí)際損失)由甲方負(fù)責(zé),并調(diào)整合同造價(jià)。If and when any error or material unreasonable problem of des
17、ign due to party A requirement, Party B shall notify Party A promptly in writing and decide the amendment or modification of the design documentation by the consultation and negotiation between parties and units concerned. Party B shall carry out construction according to the design documents modifi
18、ed or changed. If project cost increase (including the actual loss of rework loss, stoppage or slowdown, personnel and machine equipment relocated, material structures, fixtures backlog), shall be responsibility by Party A, and be adjusted the contract price together with Party B.三乙方在保證工程質(zhì)量和不降低設(shè)計(jì)標(biāo)準(zhǔn)的
19、前提下, 提出修改設(shè)計(jì)、 修改工藝的合理化建 議,經(jīng)甲方、設(shè)計(jì)單位或有關(guān)技術(shù)部門同意后采取實(shí)施。Any reasonable suggestion on the modifications of design and craft proposed by Party B, subject to the quality and without reducing standards of design, could be carried out upon the approval of Party A, design unit or concerned technical department.四甲
20、方如需設(shè)計(jì)變更, 必須作出正式修改通知書和修改圖紙, 乙方才予實(shí)施。 重大修改和 增加造價(jià)時(shí),必須另行協(xié)商,乙方才予實(shí)施。Party A should, if any necessary design change, make the formal amendment and modify drawings for Party B s implementation. Material changes and cost increased must benegotiated by both parties before Party B implement the same.第七條 工程驗(yàn)收 Ar
21、ticle 7 Acceptance of project 一工程施工中地下工程、結(jié)構(gòu)工程必須具有隱蔽驗(yàn)收簽證、試水、抗?jié)B等驗(yàn)收合格記錄。 甲方須及時(shí)辦理驗(yàn)收簽訂手續(xù)。The underground engineering, structural engineering in the construction of project should be checked and with issue of certificate and the record of acceptance of water test, anti-permeability and so on. Party A shou
22、ld deal with the acceptance signed formalities timely.二工程竣工驗(yàn)收后,甲方才可使用Party A can use the project after completionacceptance 在規(guī)定的保修期內(nèi), 凡因施工造成的質(zhì)量缺陷應(yīng)由乙方無償保修。 其保修條件、 范圍和期限 按城鄉(xiāng)建設(shè)環(huán)境保護(hù)部( 84 )城建字第 79 號(hào)通知印發(fā)的建筑工程保修辦法(試行) 執(zhí) 行。In the provision warranty period, any construction quality defects, Party B should ma
23、ke maintenance free of the quality defect due to construction, the scope and duration carry out according to the issuance of Cheng Jian No. 79 notification Construction engineering guarantee measures (Trial) by Urban and Rural Construction and Environmental Protection Department (84).第八條 違約責(zé)任 Articl
24、e 8 Liability for breach of contract 乙方的責(zé)任: Responsibility of Party B:一工程質(zhì)量不符合合同規(guī)定的,負(fù)責(zé)無償修理和返工。Take charge of gratis repair and rework if project quality doesnt meet contacts stipulation 二工程不能按合同規(guī)定的工期交付使用的, 按合同中關(guān)于建設(shè)工期提交或拖后的獎(jiǎng)罰規(guī)定 償付逾期罰款。If fail to deliver the construction according to the contract on t
25、ime, The overdue fines according to punishment or award of the provision concerning the delivery or delay.除竣工日期得以順延外, 還應(yīng)賠償乙方由此甲方的責(zé)任: The responsibility of Party A: 一未能按照合同的規(guī)定履行自己應(yīng)負(fù)的責(zé)任, 造成的實(shí)際損失。Failed to fulfill their responsibilities in accordance with the provisions of the contract, in addition to
26、the completion date to be postponed should be compensation for the actual loss of Party B .二工程中途停建、 緩建或由于設(shè)計(jì)變更以及設(shè)計(jì)錯(cuò)誤造成的返工, 應(yīng)采取措施彌補(bǔ)或減少 損失。同時(shí),賠償乙方由此造成的停工、窩工、返工、倒運(yùn)、人員和機(jī)械設(shè)備調(diào)遷、材料和 構(gòu)件積壓的實(shí)際損失。The ongoing project is stopped, postponed or due to design changes and rework caused by design errors, should take measures to remedy or reduce losses. At the same time, compensate Part
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 演講中的情感敘事策略考核試卷
- 保健品市場(chǎng)渠道消費(fèi)者行為分析考核試卷
- 綠化施工組織與管理考核試卷
- 頻譜分析儀應(yīng)用考核試卷
- TRIZ創(chuàng)新原理與應(yīng)用 課件匯 第11-19章 科學(xué)效應(yīng)知識(shí)庫(kù)-專利戰(zhàn)略
- 計(jì)劃生育與婦女保健課后作業(yè)
- 公司員工的試用期轉(zhuǎn)正工作總結(jié)14篇
- 二手房屋購(gòu)買合同(合集6篇)
- 植樹科學(xué)活動(dòng)方案
- 匯源橙子促銷活動(dòng)方案
- GB/T 34300-2017城鄉(xiāng)社區(qū)網(wǎng)格化服務(wù)管理規(guī)范
- GB/T 28267.1-2012鋼絲繩芯輸送帶第1部分:普通用途輸送帶的設(shè)計(jì)、尺寸和機(jī)械要求
- GB/T 12334-2001金屬和其他非有機(jī)覆蓋層關(guān)于厚度測(cè)量的定義和一般規(guī)則
- DB22-T 5040-2020建設(shè)工程見證取樣檢測(cè)標(biāo)準(zhǔn)-(高清正版)
- 慶七一知識(shí)競(jìng)賽題庫(kù)
- 婦幼相關(guān)公共衛(wèi)生服務(wù)督導(dǎo)評(píng)估表
- 省級(jí)電子政務(wù)外網(wǎng)-統(tǒng)一云平臺(tái)建設(shè)方案
- Soul app用戶體驗(yàn)分析市場(chǎng)調(diào)研分析報(bào)告PPT模板
- 柯南偵探原理詳解之3柯南與干冰(專業(yè)應(yīng)用)
- JIS G4304-2021 熱軋不銹鋼板材、薄板材和帶材
- 大氣海洋數(shù)據(jù)分析與同化考試復(fù)習(xí)題
評(píng)論
0/150
提交評(píng)論