




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、ADVANCED SIMULATION TECHNOLOGIESConsistency from office to HiL test environment featuring CRUISE system plant mUser Conference, September 19th/20th 201213.09.2012PRESSURE ON TEST END CALIBRATION TEAMS IS BECO CRITICAL§ Shortage of time and budget are too often the reason for costly problems tha
2、t are discovered too late in the development process.§ Inconsistent and not reproducible test due to transferring the m between different environments that causes alge additional time and cost load to project.§ Incomplete controller and components testing due tay of components and vehicles
3、.§ Road testing involves high safety risk for the people not just for the vehicle and components.User Conference, September 19th/20th 20122IMPORTANCE OF DEVELOPMENT ENVIRONMENTSTODAY AND FUTURE FOCUSEngine todayEngine future5432MiL/SiLHiLTest BedChassis DynoRoadMiL/SiLHiLTestbedChassis dynoRoad
4、1User Conference, September 19th/20th 20123CONSISTENCY BY CRUISE SYSTEM PLANT MREUSE FROM OFFICE TO TEST APPLICATIONSUser Conference, September 19th/20th 20124TargetMReuseFleet TestConceptIn-VehicleData ConsistencyTestSys. DesignSys. TestKnowledge ExchangeResource SharingComp. DesignComp. TestFrontl
5、oadingRealization / ImplementationSYSTEM PLANT MADDS FLEXIBILITY AND PRODUCTIVITY TO HIL AND TEST SYSTEMSSYSTEM PLANT MREUSE IN DEVELOPMENT PROCESSMsVehicle System SimulationVirtual WorldVehicle System SimulationTest SystemPUMA Opend l roWealRReal WorldSystem AnalysisHiL SystemInMotionUser Conferenc
6、e, September 19th/20th 20125alysis System An Control functions concept/design Virtual function test & pre-calibration Function test Pre-calibration Component Test Calibration Integration Test ValidationCONTROL FUNCTIONS CONCEPT/DESIGNVIRTUAL FUNCTION TEST & PRE-CALIBRATIONalysisSystem Analys
7、is System An Control functions concept/design Virtual function test & pre-calibrationUser Conference, September 19th/20th 20129§ Starting from CRUISE vehicle system m§ Controllers can be added in any development phase§ Controller fidelity depends on application target§ Final
8、controller can be frontloaded and reused in next vehicle development loop from early development phases on§ Integrating dSPACE interface to setup signal connection needed in plant m§ COMMON MCOMPILER CMCVEHICLEMCK & MCK & M CK & M.exe.dll/so.libMergingCompilingSOLVER§ Ensu
9、ringum DATA/M SECURITY§ NO CRUISEINSTALLATION required for running CMCbuilt binaries without OPA§ CMC built binaries run on REAL-TIME PLATFORMSwithout file IO§ M EXCHANGEwith rs, which do not have CRUISE§ CRUISE plant mintegration into ML/SL mwith TCU controller§ Integration
10、 is done within minutes§ If system plant m ischanged it has to be recompiled in CRUISE over CMC and library reloaded (saved) in ML/SL mHiL CONTROL FUNCTION TESTING & PRE-CALIBRATIONUser Conference, September 19th/20th 201219ECUI/OActuators:e.g.: Throttle body, injectors, EGR valve,PLANT MUN
11、IT UNDER TESTHIL SYSTEMHiL SystemInMotion Function test Pre-calibrationSensors:e.g.: Pressures, Temperatures, Speeds, AirFuelRatio,§ Transmission Control Unit:§ Programmed/Simulink§ Exported to dSPACE MABx§ Signal Exchange over CAN§ ML/SL mwith CRUISE plant mover S-function
12、needs to be modified before it is compiled over RTW to be y for RT system usage§ New IO connection blocks have to be connected to establish communication over CAN§ Appropriate RTI CANController has to be added adequate Board Type chosen and CAN *.dbc file connected§ Adjusting RTW para
13、meters§ If your current working folder does not contain all needed files to build library then add additional directories where files are located!§ Check the target system file and make configuration§ Execute “Build M” in Tools->Real-Time Workshop to build m§ Turn on the RT Sy
14、stem§ Start the dSPACE ControlDesk§ Connect controller to RT system and turn it on via power supply§ Change Platform Connection§ Chose appropriate connection(e.g. local network 157.247.180.197)§ Initialize and register platform e.g. DS1006§ Create new Experiment§ A
15、dd new Layout§ Configure Layout design (displays, plotter arrays, capture settings, )HiL CONTROL FUNCTION TESTING & PRE-CALIBRATION§ Plant *.sdf system plant mto RT system by drag and dropUser Conference, September 19th/20th 201220HiL CONTROL FUNCTION TESTING & PRE-CALIBRATION§
16、; Connect and adjust displays, plotter array, capture settings, etcUser Conference, September 19th/20th 201221HiL CONTROL FUNCTION TESTING & PRE-CALIBRATIONExecuting testsUser Conference, September 19th/20th 201222ECUI/OActuators:e.g.: Throttle body, injectors, EGR valve,PLANTMUNIT UNDER TESTdSP
17、ACESensors:HIL SYSTEMe.g.: Pressures, Temperatures, Speeds, AirFuelRatio,USING THE SYSTEM PLANT M IN OFFICE AND TEST APPLICATIONS SIGNIFICANTLY REDUCES TIME AND COSTSMINIMIZE TIME & COST§ Quality of the vehicle is increased as more testing can be done on RT/HIL systems at lower risk of miss
18、ing critical operating conditions.§ Consistent and reproducible test by using single system plant m with scalable fidelity over the entire vehicle development process.§ Lean and cost efficient controller development workflow from design to final testing phases.§ Real-world conditions achieved without the actual risk involved.§ Testing could start much earlier in the development process even before the physical vehicle or compone
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025-2030年中國鑄造機械制造行業(yè)運營狀況與發(fā)展前景分析報告
- 2025-2030年中國金屬波紋管市場發(fā)展趨勢規(guī)劃研究報告
- 2025-2030年中國聚氨酯慢回彈海綿女性內(nèi)衣市場運營狀況及發(fā)展規(guī)劃分析報告
- 2025-2030年中國綜合肺功能測定儀市場發(fā)展狀況及投資策略研究報告
- 2025-2030年中國純鋯珠行業(yè)運行現(xiàn)狀及發(fā)展前景分析報告
- 2025-2030年中國礦渣粉行業(yè)運營格局及發(fā)展趨勢分析報告
- 2025-2030年中國真空搬運機械行業(yè)競爭格局及發(fā)展趨勢分析報告
- 2025-2030年中國盆景行業(yè)競爭狀況規(guī)劃研究報告
- 濮陽職業(yè)技術(shù)學院《藥物合成實驗》2023-2024學年第二學期期末試卷
- 吉林電子信息職業(yè)技術(shù)學院《施工技術(shù)與施工組織》2023-2024學年第二學期期末試卷
- 文化產(chǎn)業(yè)管理專業(yè)大學生職業(yè)生涯規(guī)劃書
- DSM-V美國精神疾病診斷標準
- 文獻的載體課件
- 2023年高考語文全國乙卷《長出一地的好蕎麥》解析
- 混凝土強度回彈檢測方案
- 歷年中考地理生物變態(tài)難題
- 研學旅行課程標準(一)-前言、課程性質(zhì)與定位、課程基本理念、課程目標
- 部編版二年級下冊語文教案全冊
- 解放牌汽車CA10B后鋼板彈簧吊耳加工工藝及夾具設(shè)計哈
- 大學??啤稒C電傳動控制》課件
- 高中地理高清區(qū)域地理填圖冊
評論
0/150
提交評論