


下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領
文檔簡介
1、解讀高層建筑二級負荷消防設備設計Interpretation of the high-rise building fire equipment secondary loaddesign高層修建依據(jù)其運用性質(zhì)、火災風險司長、分散和補救難度等進行分類。1O18層住所應屬二類高層修建。其間首要通道和樓梯間照明用電、客梯用電、排污泵和日子水泵用電為二級負荷,其消防用電負荷:消防操控室、火災主動報警及聯(lián)動操控設備以及閥門等用電應為二級負荷。High-rise building according to the use of nature, fire risk, director of classify,
2、 dispersion and remedial difficulty. 1 o 18 floors residence should belong to the category of high-rise building. During the primary channel and stair illume, passenger lift pump, sewage pump, and days for electricity utilization secondary load, and its fire load: active alarm and fire control room,
3、 fire linkage control equipment and valves, etc. Electricity should be the secondary load.高層住所宜在底層或地下一層設置10(6)0.4kV戶內(nèi)變電所或在室外設置預裝式變電站。變壓器低壓側(cè)電壓為0.4kV時。單臺變壓器容量不宜大于1250kVA 預裝式變電站變壓器,單臺容量不宜大于800kYA。二級負荷供電體系停電影響較大,宜由兩回路供電,供電變壓器也宜選兩臺(兩臺變壓器可不在同一變電所)。當線路自上一級配電所用電纜引來時有必要選用兩根電纜組成的電纜線路。其每根電纜應能接受 100的二級負荷。且互為熱備用
4、。High-rise residence should be set on the ground floor or underground 10 (6) / 0.4 kV indoor substation or in the outdoor setting preinstalled type transformer substation. When the voltage is 0.4 kV transformer low voltage side. Single transformer capacity should not be greater than 1250 kva preinst
5、alled type transformer substation, single capacity should not be greater than 800 kya. Secondary load influence on power system blackouts, and appropriate by the two circuits of power supply, power supply transformer and appropriate chooses two (two are not in the same substation transformer). When
6、used cable line from the upper level distribution cause it necessary to use two cables of cable line. The each cable should be able to accept 100% of the secondary load. And hot standby each other.JGJ162008民用修建電氣設計規(guī)范(以下簡稱新民partition, unfavorable branch lines across the fire zone.高層修建二級負荷消防設備設計,二類高層寓
7、居修建中火災主動報警維護目標分級為二級,所以此類修建物內(nèi)消防設備供電干線及分支干線,應選用有機絕緣耐火銅芯電力電纜,其分支線路和操控線路,系結(jié)尾雙電源切換箱放射式至相應消防設備的線路,它們同在一個防火分區(qū)內(nèi)且線路較短,當采納必定防火辦法如穿管暗敷防水板,宜選用與消防供電干線或分支干線耐火等級降一類的電線或電纜即阻燃型銅芯電線或電纜。High-rise building fire equipment secondary load design, second class upper walls built in alarm active fire maintenance target class
8、ification for level 2, so this kind of building material in fire equipment supply main and branch lines, should choose organic insulating refractory copper power cable, the branch circuit and control circuit, the radial end is double the power switch box to corresponding fire control equipment of th
9、e line, they present a fireproof partition and short circuit, when adopted must fire protection measures such as wearing dark apply, appropriate chooses and fire power supply main trunk or branch rated drop type of wire or cable that is flame retardant copper wire or cable.有機絕緣耐火銅芯電力電纜在電氣豎井內(nèi)或電纜溝內(nèi)敷設時
10、可不穿導管維護,但應采納與非消防用電電纜阻隔辦法;選用明敷、吊頂內(nèi)敷設或架空地板內(nèi)敷設時,應穿金屬導管或封閉式金屬線槽維護,且維護管或線槽應采納涂防火涂料等防火辦法:當線路暗敷時 應 穿金屬導管或難燃型剛性塑料導管維護鍋爐出渣機,并應敷設在不焚燒布局內(nèi),且維護層厚度不小于30mm。Organic insulating refractory copper power cable or cable laying in the electrical shaft can not wear catheter maintenance, but should be adopted with the fire
11、 power cable cut off; Choose Ming fu, ceiling installation or overhead floor laying, should wear metal conduit or enclosed metal trough maintenance, and maintenance of fire retardant coating tube or slot should be adopted, such as fire prevention measures: when the line is dark apply. Should wear metal conduit
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年VB試題全景及答案概述
- 2025年軟件設計師職業(yè)規(guī)劃與目標設定試題及答案
- 鋪設成功之路的個人策略計劃
- 財務問題解決能力的提升策略計劃
- 2025年的房地產(chǎn)租賃合同
- 主管如何應對團隊變化計劃
- 軟件設計師考試中的創(chuàng)新思維試題及答案
- 2025建筑裝飾合同模板范本(律師制定版本)
- 2025【生態(tài)保護區(qū)電力工程承包合同】 解除合同及補償政策
- 法學概論與實際法律職業(yè)的關系試題及答案
- 部編人教版語文六年級下冊《9 浣溪沙》課件
- 2023年中小學體育教師招聘考試試題及答案三份
- 向政府寫訴求書范文(精選12篇)
- 電視節(jié)目策劃學胡智峰
- 2023浙江省學生藝術(shù)特長測試A級理論復習資料
- 建筑業(yè)企業(yè)資質(zhì)職稱人員相近專業(yè)認定目錄
- 北京市各縣區(qū)鄉(xiāng)鎮(zhèn)行政村村莊村名明細
- 追求有意義人生
- 生產(chǎn)車間如何節(jié)能減耗(課堂PPT)
- 燒結(jié)普通磚、多孔磚回彈計算
- 橫向項目結(jié)題證明模板
評論
0/150
提交評論