![260噸汽車吊大型吊車跨外吊裝專項(xiàng)方案_第1頁](http://file3.renrendoc.com/fileroot_temp3/2022-3/12/8451b510-b0b9-44e7-8653-560a601aa2a9/8451b510-b0b9-44e7-8653-560a601aa2a91.gif)
![260噸汽車吊大型吊車跨外吊裝專項(xiàng)方案_第2頁](http://file3.renrendoc.com/fileroot_temp3/2022-3/12/8451b510-b0b9-44e7-8653-560a601aa2a9/8451b510-b0b9-44e7-8653-560a601aa2a92.gif)
![260噸汽車吊大型吊車跨外吊裝專項(xiàng)方案_第3頁](http://file3.renrendoc.com/fileroot_temp3/2022-3/12/8451b510-b0b9-44e7-8653-560a601aa2a9/8451b510-b0b9-44e7-8653-560a601aa2a93.gif)
![260噸汽車吊大型吊車跨外吊裝專項(xiàng)方案_第4頁](http://file3.renrendoc.com/fileroot_temp3/2022-3/12/8451b510-b0b9-44e7-8653-560a601aa2a9/8451b510-b0b9-44e7-8653-560a601aa2a94.gif)
![260噸汽車吊大型吊車跨外吊裝專項(xiàng)方案_第5頁](http://file3.renrendoc.com/fileroot_temp3/2022-3/12/8451b510-b0b9-44e7-8653-560a601aa2a9/8451b510-b0b9-44e7-8653-560a601aa2a95.gif)
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、260噸汽車吊大型吊車跨外吊裝專項(xiàng)方案寧夏錦寧巨科新材料有限公司壓延車間G、H跨鋼管柱,吊車梁跨外吊裝專項(xiàng)措施建設(shè)單位審批:建設(shè)單位監(jiān)理單位施工單位審批:項(xiàng)目經(jīng)理編制成勇波寶鋼建設(shè)工程有限公司寧夏項(xiàng)目部2011年9月11日1、工程概況1、工程名稱:寧夏錦寧巨科新材料有限公司40萬噸高精度鋁板帶箔建設(shè)項(xiàng)目壓延車間/G、H跨鋼管柱,鋼吊車梁。2、工程地點(diǎn):寧夏中衛(wèi)市中寧縣石空鎮(zhèn)石空工業(yè)園區(qū)3、結(jié)構(gòu)類型:廠房為鋼管混凝土柱,桁架結(jié)構(gòu)鋼屋架,鋼吊車梁。4、結(jié)構(gòu)特點(diǎn):本工程為寧夏錦寧巨科新材料有限公司40萬噸高精度鋁板帶箔建設(shè)項(xiàng)目,壓延車間G、H跨采用鋼管混凝土下柱和H型鋼上柱,屋面鋼梁桿件采用Q235
2、角鋼桁架。有鋼吊車梁G、H軸458米長(zhǎng)*24米跨,鋼管柱74根,下部為鋼筋混凝土杯型基礎(chǔ)。鋼管柱吊裝難點(diǎn):連跨空間跨度24米,同時(shí)緊挨著的J軸基礎(chǔ)開挖,G、H跨大型設(shè)備基礎(chǔ)開挖,鋼管柱無法使用吊車在跨內(nèi)吊裝,并且現(xiàn)場(chǎng)構(gòu)件需進(jìn)行二次搬運(yùn),由于鋼管柱吊裝后需要對(duì)杯型基礎(chǔ)二次灌漿,鋼管柱灌注混凝土。需要技術(shù)性間歇時(shí)間,所以鋼管柱,吊車梁需要分2次吊裝。大型吊車站位,配重,挪位時(shí)間長(zhǎng),最關(guān)鍵的是工期緊張,各專業(yè)交叉施工,主要構(gòu)件有鋼吊車梁、鋼管柱。單件鋼管柱,最長(zhǎng)18.9m,最大起吊重量6.9T,最大起吊高度17m。按一次就位,大型汽車吊機(jī)跨外吊裝需要工作半徑至少30米。需采用250T汽車吊,最大鋼管
3、柱單重約6.9噸。吊車梁?jiǎn)胃钪?.4噸。2、吊裝前準(zhǔn)備工作(1) .安裝準(zhǔn)備依據(jù)施工組織平面圖,做好現(xiàn)場(chǎng)的三通一平工作。吊車進(jìn)場(chǎng)前勘察路線,路面,軟土路面需要提前鋪設(shè)石子,避免耽誤臺(tái)班,安裝前,要清除混凝土灰渣,設(shè)立基礎(chǔ)定位線,要明顯標(biāo)示準(zhǔn)確的字軸線,以確保與鋼柱軸線吻合。(2) .定位測(cè)量吊裝前需復(fù)核的項(xiàng)目:.基礎(chǔ)碎標(biāo)號(hào);.基礎(chǔ)周圍回填土夯實(shí)情況;.基礎(chǔ)軸線標(biāo)志,標(biāo)高基準(zhǔn)點(diǎn);.每個(gè)基礎(chǔ)軸線偏移量;.每個(gè)基礎(chǔ)標(biāo)高偏差;標(biāo)高調(diào)整,采用墊鐵,或者支腿高度調(diào)整,墊鐵厚度根據(jù)所測(cè)標(biāo)高進(jìn)行計(jì)算,首先墊一個(gè)角,利用水平儀進(jìn)行測(cè)量,然后另三個(gè)角利用水平尺來調(diào)整,但注意,每個(gè)角墊鐵不超過三塊。(3) .構(gòu)件
4、進(jìn)場(chǎng)依據(jù)安裝順序分單元成套供應(yīng),構(gòu)件運(yùn)輸時(shí)根據(jù)長(zhǎng)度、重量選用車輛,構(gòu)件在運(yùn)輸車上要墊平、超長(zhǎng)要設(shè)標(biāo)志、綁扎要穩(wěn)固、兩端伸出長(zhǎng)度、綁扎方法、構(gòu)件與構(gòu)件之間墊塊,保證構(gòu)件運(yùn)輸不產(chǎn)生變形,不損傷涂層。裝卸及吊裝工作中,鋼絲繩與構(gòu)件之間均須墊塊加以保護(hù)。依據(jù)現(xiàn)場(chǎng)平面圖,將構(gòu)件堆放到指定位置。構(gòu)件存放場(chǎng)地須平整堅(jiān)實(shí),無積水,構(gòu)件堆放底層墊無油枕木,各層鋼構(gòu)件支點(diǎn)須在同一垂直線上,以防鋼構(gòu)件被壓壞和變形。構(gòu)件堆放后,設(shè)有標(biāo)牌,標(biāo)明型號(hào)、規(guī)格、數(shù)量以便安裝。3,進(jìn)場(chǎng)路線、現(xiàn)場(chǎng)拼裝位置及吊裝機(jī)械選型(1)200噸吊車工作幅度可達(dá)到30米,臂長(zhǎng)可達(dá)到60米,在30米工作半徑下臂長(zhǎng)56.3米可吊11.7噸不滿足預(yù)
5、定要求(詳見吊車性能表,吊裝示意圖)選擇吊車。起重量為11.8t,爬桿角度按最小角度58°考慮,根據(jù)場(chǎng)地情況,主要問題在H軸線受大基坑影響以工作幅度,臂長(zhǎng),吊重來選擇。構(gòu)件起吊高度:18.6+6=24.2m需要起重半徑:30米爬桿長(zhǎng)度:30/C0S580=56.2m起重量:=9.4T+2.4T(吊鉤+鋼絲繩)=11.8T查150噸液壓汽車吊性能表30米半徑起重不到3噸。查200T汽車吊性能,此時(shí)起重量為11.7t<11.8T,不能滿足要求,注:爬桿60度為安全角度。低于60度臂自重傾覆力矩過大,有傾覆危險(xiǎn)。(2) 250噸液壓汽車吊工作幅度可達(dá)到30米,臂長(zhǎng)可達(dá)到72米,在30
6、米工作半徑下臂長(zhǎng)60米可吊12噸滿足預(yù)定要求(詳見吊車性能表,吊裝示意圖)選擇吊車。起重量為11.83爬桿角度按安全爬桿角度最小角度60°考慮,根據(jù)場(chǎng)地情況,以工作幅度,臂長(zhǎng),吊重來選擇。構(gòu)件起吊高度:18.6+6=24.2m需要起重半徑:30米爬桿長(zhǎng)度:30/C0S600=60m起重量:=9.4T+2.4T(吊鉤+鋼絲繩)=11.8T。查250T汽車吊性能表,查250T汽車吊性能曲線表此時(shí)起重量為12.5滿足要求,注:爬桿60度為安全角度。低于60度臂自重傾覆力矩過大,有傾覆危險(xiǎn)。此時(shí)250T液壓汽車吊工況為:需用最小配重72.5噸,伸主臂60米,可360度旋轉(zhuǎn),全伸支腿。需要獲得
7、支持性資源工作:進(jìn)場(chǎng)道路平整,夯實(shí)。站位點(diǎn)障礙物清理。250噸汽車吊自重大,配重大,吊車站位一次3小時(shí),使用自身起吊配重,卸車,安裝配重,拆除配重。平均吊裝一只構(gòu)件需要1小時(shí)。1附150噸液壓汽車吊性能表2附200噸液壓汽車吊性能表3附250噸液壓汽車吊性能表4附250噸液壓汽車吊性能曲線表5附250噸液壓汽車吊車身尺寸6附大基坑平面圖7附250噸液壓汽車吊站位平面圖8附250噸液壓汽車吊,72.5噸配重拖車進(jìn)場(chǎng)路線圖鋼管柱吊裝后需要對(duì)杯型基礎(chǔ)二次灌漿,技術(shù)性間歇時(shí)間大約1天。鋼管柱杯型基礎(chǔ)灌漿后需要搭設(shè)腳手架對(duì)管身進(jìn)行混凝土澆灌,技術(shù)性間歇時(shí)間大約為3天,混凝土澆灌后才能進(jìn)行吊車梁的吊裝。對(duì)
8、參與工程施工的機(jī)械設(shè)備、工機(jī)具要提前進(jìn)行檢修,做好檢修和保養(yǎng)工作,確保完好無損提前進(jìn)入現(xiàn)場(chǎng)。按照施工總平面布置圖要求,將各種施工機(jī)械設(shè)備就位、固定。從安全,經(jīng)濟(jì),工期上綜合考慮選用設(shè)備如下.序號(hào)機(jī)械名稱規(guī)格型號(hào)性能數(shù)量(臺(tái))備注1汽車吊QY250200T1臺(tái)/3臺(tái)班吊裝鋼管柱2汽車吊QY250200T1臺(tái)/4臺(tái)班吊裝吊車梁3拖車17.7米載重80噸1臺(tái)/2臺(tái)班拖運(yùn)配重4汽車吊QY2525T1臺(tái)/2臺(tái)班二次搬運(yùn)5拖車17.7米長(zhǎng)載重40噸1臺(tái)/2臺(tái)班二次搬運(yùn)200噸汽車吊性能表以下工況僅供參考,實(shí)際請(qǐng)與本公司業(yè)務(wù)員聯(lián)系!吊臂長(zhǎng)度向)13.317.621.926.220140030, 534. 8
9、39.143.447.75256.3603.51391301181312411611495104.12111101119376502111051051049175603410692929288695949078982828281645748398807373737264574538.5329726565656564564336.531.525.520.106159595958595440.53530.525.4520.1154535354513833.529.824.917219.1249.548.54849.5483632.528.524.516.8919.144140.542.54231.
10、528.9262316.234218.16353636.53628.32623.621.416.5417.1830.53231.53125.823.421.519.614.9616.2028.327.927.223.52119.618.114.2415.2224.724.121.819.217.916.713.7425.114.2422.121.420.417.616.415.413.2413.2619.819.119.216.315.114.312.342817.117.715.113.913.212.511.53016161412.812.211.710.83213.314.513.211
11、.811.310.910.13413.212.41L210.510.29.43611.311.710.69.89.68.83811.2109.198.34010.29.48.78.47.7428.98.37.87.2448.57.97.46.7467.56.96.3487.16.55.9506.15.6525.75.2544.9564.6I00/0/00/0/046/0/046/46/092/46/092/46/4692/46/4692/46/4692/4692100II00/0/046/0/046/92/092/46/4646/46/4646/92/4692/92/4692/92/4692/
12、9292100III046/0/046/0/046/46/4646/46/4646/46/4646/46/4646/92/4692/92/9292/9292100IV00/46/00/46/00/0/460/46/4646/46/4646/46/4646/46/9246/92/9292/9292100V00/0/460/46/920/0/460/0/460/46/9246/46/9246/46/9246/46/9246/9292100150噸汽車起重機(jī)性能表(一)以下工況僅供參考,實(shí)際請(qǐng)與本公司業(yè)務(wù)員聯(lián)系!主臂360075%起重性能工作半徑(m)吊臂長(zhǎng)度3)13.917.721.32528.7
13、32.33639.643.152.83140126.3.665.264.49122.465.163.79108.4.565.163.956.59599.865.161.455.4680.36556.651.746.640.8768.96253.347.243.937.833.131.5858.757.148.144.63034.431.930.2949.449.244.941.235.831.929.827.227104241.941.635.733.829.527.225.424.81229.829.829.227.724.623.321.821.317.61421.621.621.621.
14、621.420.419.517.4161616.316.316.316.316.316.316.213.71812.612.612.612.612.612.612.612.2199.79.79.79.79.79.710.7236.76.76.76.76.79.1264.64.64.64.64.66.82933334.5351.71.71.73380.50,51.8410.9(注;本表內(nèi)紅字及紅字以上欄目的數(shù)字為吊臂強(qiáng)度所決定,其下面欄目數(shù)字為傾翻力矩決定)150噸汽車起重機(jī)性能表(二)吊臂回轉(zhuǎn)至后部及兩側(cè)時(shí)吊裝性能吊臂長(zhǎng)度(m)工作半徑向)13.917.7314021.32528.732.33
15、639.643.152.83,644.5131.3122.6109.265,964.46563.76563.756.6100.61.255.45264.9680.364.956.551.746.641.2768.96252.547.243.937.833.131.5858.757.148.144.63934.431.930.3949.649.344.840.935.831.929.527.127.6104341.941.635.633.429.627.425.324.91231.931.931.327.724.622.62221.317.61424.624.624.624.621.420.31
16、9.318.215.91618.518.518.518.417.516.815.413.71814.714.714.714.714.714.412.5122011.811.811.811.811.811.410.6238.58.58.58.58.59266.26.26.26.26.27.6294.44.34.24.26.1322.92.92.14.3351.71.72.8380,32411.244(注:本表內(nèi)紅字及紅字以上欄目的數(shù)字為吊臂強(qiáng)度所決定,其下面欄目數(shù)字為傾翻力矩決定)15.5-72m3盼72.5!Qu72.5!DINISOA15.5m20.7m25.9m31.1m36.3m41.5
17、m46.7m51.9m57.1m62.3m67.5m72m外.33.517617317617313533.544.515714415714413513411711744.513612313612312711511610956112100109105100555543789108979545442.540.533.533,526.291011127263535138.53732,531,526.226.220,720,71711121443,544.5464233.529.929.226.624.823,320.619,916,916.81414141625.837,532.538.538.53
18、427.225.224,322.121,619.918.917.716,215,613,913,528.529.427,130.526.629.525723.722.418.418.41716.515.414.81413.112.421,123.522,720.121.12017,215.614,414.413,413,212,411,7111&8億917.118,816.913.312.512,11711,71110,49.81614.615,313.913,112.61171110.910.210,39.79,28.713,412.611.511.610,39.89.69,18.5
19、8.17,710,46.310,89.900900hO8,58,17,97,47.26,78.38.37,97.77.46.96.46,35.97,56.96.66,15,75,55.26,365.5534.84.94.64,23,84,33.83,43,32,92.6,nachhintenoverreareaamefB-sulpostedore-haciaatras-npnqwcrpon。TAB131005/131197250噸液壓汽車吊性能表80m250噸液壓汽車吊性能曲線圜AAISOmm"4妣Dimensions-EnccmbrOTant-Dinwnsioni-Dimensio
20、nesrwnIBCDEFGH14.00R2533503600500026123705201s才11-13,16.00R254000385030)0255237553146206513-15s206R25400038503240270237&53148208519°13°15“250噸液壓汽車吊車身尺寸參數(shù)4吊裝鋼絲繩的選擇由于單件最大重量為6.9T,鋼絲繩安全系數(shù)取6,可知破斷拉力為1.6TX6=9.6T查鋼絲繩手冊(cè)選用6x19015.5的鋼絲繩。其準(zhǔn)許拉力為155KN,約15.5T15.5T>9.6T符合安全要求。(6).勞動(dòng)力配備與安全教育1、根據(jù)工程的具
21、體情況,我公司將挑選有豐富經(jīng)驗(yàn)和經(jīng)培訓(xùn)取得上崗證的施工人員組成鋼結(jié)構(gòu)吊裝隊(duì)。序號(hào)工種人數(shù)備注1起重工1持證2吊車司機(jī)2持證3電工1持證4電焊工4持證5信號(hào)工1經(jīng)專業(yè)培訓(xùn)2、班長(zhǎng)負(fù)責(zé)施工指揮、協(xié)調(diào)各工種間的聯(lián)系,班組長(zhǎng)是施工操作的組織者,對(duì)操作質(zhì)量和安全負(fù)直接責(zé)任。3、吊車設(shè)一名起重工指揮持證上崗。非起重工嚴(yán)禁指揮起重設(shè)備。4、電工負(fù)責(zé)施工現(xiàn)場(chǎng)的電力供給、電氣設(shè)備的正常運(yùn)行和安全使用。5、對(duì)進(jìn)場(chǎng)工人做好入場(chǎng)培訓(xùn)工作,并做好培訓(xùn)記錄,不讓任何一個(gè)未經(jīng)安全培訓(xùn)的人員上崗作業(yè)。做好安全技術(shù)交底工作,下達(dá)任務(wù)的同時(shí),必須有書面的安全注意事項(xiàng)及要求。進(jìn)入工地必須戴安全帽,高處作業(yè)必須系安全帶。6、認(rèn)真學(xué)習(xí)
22、有關(guān)安全操作規(guī)程,按規(guī)程規(guī)定操作施工,各工種在參加吊裝過程中,必須設(shè)專人統(tǒng)一指揮,密切配合,設(shè)專職或兼職安全員。7、加強(qiáng)班前與班后的安全技術(shù)交底與檢查工作,工作人員不準(zhǔn)遠(yuǎn)離施工現(xiàn)場(chǎng),防止意外事故發(fā)生。吊裝時(shí),未焊接牢固和未連接緊固的各種零部件不允許起吊作業(yè)。鋼結(jié)構(gòu)吊裝流程圖如下:吊裝時(shí)構(gòu)件的擺放、吊車的停機(jī)點(diǎn)見,鋼梁的吊裝路線圖,見附圖。4.1. 構(gòu)件的吊裝構(gòu)件安裝前,應(yīng)對(duì)構(gòu)件進(jìn)行檢查,連接板變形、缺陷超差時(shí),處理后才能安裝。清除鋼管柱表面的油污,泥沙,灰塵等雜物。起吊前,用鋼絲繩綁好重心調(diào)整平衡,并在兩端部用麻繩綁好,作為牽制溜繩的調(diào)整方向。吊裝前準(zhǔn)備工作就緒后,首先進(jìn)行試吊,吊起高度為10
23、0200mm時(shí)停吊,檢查索具牢固性和吊車穩(wěn)定性。經(jīng)確認(rèn)無誤后方可指揮吊車緩慢上升,當(dāng)梁底高于牛腿面150200nlm時(shí),調(diào)整梁底與牛腿面兩基準(zhǔn)線達(dá)到準(zhǔn)確位置,指揮吊車下降就位,將吊車梁吊垂直后放置牛腿面上,臨時(shí)將吊車梁加固,達(dá)到安全方可摘勾。吊車梁吊裝采用單片吊裝,起吊前按要求配好調(diào)整板、螺栓并在兩端拉攬風(fēng)繩。吊裝就位后應(yīng)及時(shí)與牛腿螺栓連接,并將梁上緣與柱之間連接板連接,用水平儀和帶線調(diào)正,符合規(guī)范后將螺絲擰緊。5.1.防止起重機(jī)傾翻措施(1) .吊裝現(xiàn)場(chǎng)道路必須平整堅(jiān)實(shí),回填土、松軟土層要進(jìn)行處理。如土質(zhì)松軟,應(yīng)單獨(dú)鋪設(shè)道路。起重機(jī)不得停置在斜坡上工作,也不允許起重機(jī)兩個(gè)邊一高一低。(2)
24、.嚴(yán)禁超載吊裝。(3) .禁止斜吊。斜吊會(huì)造成超負(fù)荷及鋼絲繩出槽,甚至造成拉斷繩索和翻車事故。斜吊還會(huì)使重物在脫離地面后發(fā)生快速擺動(dòng),可能碰傷人或其他物體。(4) .綁扎構(gòu)件的吊索須經(jīng)過計(jì)算,所有起重工具,應(yīng)定期進(jìn)行檢查,對(duì)損壞者作出鑒定,綁扎方法應(yīng)正確牢固,以防吊裝中吊索破斷或從構(gòu)件上滑脫,使起重機(jī)失重而傾翻。(5) .不吊重量不明的重大構(gòu)件設(shè)備。(6) .禁止在六級(jí)風(fēng)的情況下進(jìn)行吊裝作業(yè)。(7) .指揮人員應(yīng)使用統(tǒng)一指揮信號(hào),信號(hào)要鮮明、準(zhǔn)確。起重機(jī)駕駛?cè)藛T應(yīng)聽從指揮。5. 2.防止高空墜落措施(1) .操作人員在進(jìn)行高空作業(yè)時(shí),必須正確使用安全帶。安全帶一般應(yīng)高掛低用,即將安全帶繩端的鉤環(huán)掛于高處,而人在低處操作。(2) .在高空使用撬扛時(shí),人要立穩(wěn),如附近有腳手架或已裝好構(gòu)件,應(yīng)一手扶住,一手操作。撬扛插進(jìn)深度要適宜,如果撬動(dòng)距離較大,則應(yīng)逐步撬動(dòng),不宜急于求成。(3) .工人如需在高空作業(yè)時(shí),應(yīng)盡可能搭設(shè)臨時(shí)操作臺(tái)。操作臺(tái)為工具式,寬度為0.81.0m臨時(shí)以角鋼夾板固定在柱上部,低于安裝位置LOmL2m,工人在上面可進(jìn)行屋架的校正與焊接工作.(4) .如需在懸高空的屋架上弦上行走時(shí),應(yīng)在其上設(shè)置安全欄桿。(5) .登高用的梯子必須牢固。使用時(shí)必須用繩子與已固定的構(gòu)
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 江蘇科技大學(xué)蘇州理工學(xué)院《數(shù)據(jù)庫原理與設(shè)計(jì)》2023-2024學(xué)年第二學(xué)期期末試卷
- 華中科技大學(xué)《構(gòu)成設(shè)計(jì)》2023-2024學(xué)年第二學(xué)期期末試卷
- 黑龍江東方學(xué)院《小學(xué)數(shù)學(xué)課標(biāo)解讀與教材分析》2023-2024學(xué)年第二學(xué)期期末試卷
- 粵教版七年級(jí)道德與法治下冊(cè)第八單元與法同行8.1法律保護(hù)我們聽課評(píng)課記錄
- 貴州工商職業(yè)學(xué)院《嵌入式系統(tǒng)》2023-2024學(xué)年第二學(xué)期期末試卷
- 共青科技職業(yè)學(xué)院《大數(shù)據(jù)開發(fā)框架》2023-2024學(xué)年第二學(xué)期期末試卷
- 云南農(nóng)業(yè)大學(xué)《社交禮儀》2023-2024學(xué)年第二學(xué)期期末試卷
- 人教版道德與法治七年級(jí)上冊(cè)6.1《走進(jìn)老師》聽課評(píng)課記錄
- 蘇州科技大學(xué)《建筑構(gòu)造技術(shù)》2023-2024學(xué)年第二學(xué)期期末試卷
- 四川建筑職業(yè)技術(shù)學(xué)院《電子信息建模與仿真》2023-2024學(xué)年第二學(xué)期期末試卷
- 復(fù)工復(fù)產(chǎn)六個(gè)一方案模板
- 彈簧分離問題經(jīng)典題目
- 金屬材料與熱處理全套ppt課件完整版教程
- 《網(wǎng)店運(yùn)營(yíng)與管理》整本書電子教案全套教學(xué)教案
- 教師信息技術(shù)能力提升培訓(xùn)課件希沃的課件
- 高端公寓住宅項(xiàng)目營(yíng)銷策劃方案(項(xiàng)目定位 發(fā)展建議)
- 執(zhí)業(yè)獸醫(yī)師聘用協(xié)議(合同)書
- 2022年肝動(dòng)脈化療栓塞術(shù)(TACE)
- 形式發(fā)票格式2 INVOICE
- 平面圖形的密鋪
- 山東省醫(yī)院目錄
評(píng)論
0/150
提交評(píng)論