




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、1,These slides are designed to accompany Software Engineering: A Practitioners Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,Chapter 28,Risk Analysis,Slide Set to accompanySoftware Engineering: A Practitioners Approach, 7/e by Roger S. Pressman Slides copyright 1996, 200
2、1, 2005, 2009 by Roger S. Pressman For non-profit educational use only May be reproduced ONLY for student use at the university level when used in conjunction with Software Engineering: A Practitioners Approach, 7/e. Any other reproduction or use is prohibited without the express written permission
3、of the author. All copyright information MUST appear if these slides are posted on a website for student use.,2,該幻燈片用于配合軟件工程課程使用: 一個(gè)從業(yè)者的方法, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,第28章,風(fēng)險(xiǎn)分析,幻燈片組陪Slide Set to accompany軟件工程: 一個(gè)從業(yè)者的方法, 7/e by Roger S. Pressman Slides copyright
4、1996, 2001, 2005, 2009 by Roger S. Pressman 僅用于非盈利教學(xué)使用 僅用于為大學(xué)生講解軟件工程課程時(shí)配套使用: 一個(gè)從業(yè)者的方法, 7/e. 未經(jīng)作者書面許可,禁止轉(zhuǎn)載使用 該幻燈片被放在網(wǎng)站上供學(xué)生使用時(shí),必須標(biāo)明所有的版權(quán)信息。,3,These slides are designed to accompany Software Engineering: A Practitioners Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,Project
5、Risks,What can go wrong?,What is the likelihood?,What will the damage be?,What can we do about it?,4,該幻燈片用于配合軟件工程課程使用: 一個(gè)從業(yè)者的方法, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,項(xiàng)目風(fēng)險(xiǎn),有哪些可能出現(xiàn)的錯(cuò)誤?,有多大的可能性?,將會(huì)造成什么損失?,我們可以做些什么?,5,These slides are designed to accompany Software Engineerin
6、g: A Practitioners Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,Reactive Risk Management,project team reacts to risks when they occur mitigationplan for additional resources in anticipation of fire fighting fix on failureresource are found and applied when the risk stri
7、kes crisis managementfailure does not respond to applied resources and project is in jeopardy,6,該幻燈片用于配合軟件工程課程使用: 一個(gè)從業(yè)者的方法, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,無風(fēng)險(xiǎn)管理,風(fēng)險(xiǎn)出現(xiàn)時(shí)項(xiàng)目團(tuán)隊(duì)的做法 減少損失預(yù)計(jì)到問題時(shí)計(jì)劃額外的資源 聚焦失敗當(dāng)風(fēng)險(xiǎn)襲來時(shí)找到并采取對(duì)策 危機(jī)管理如果采取的對(duì)策無法規(guī)避失敗,項(xiàng)目將處于危險(xiǎn)之中,7,These slides are designed
8、to accompany Software Engineering: A Practitioners Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,Proactive Risk Management,formal risk analysis is performed organization corrects the root causes of risk TQM concepts and statistical SQA examining risk sources that lie bey
9、ond the bounds of the software developing the skill to manage change,8,該幻燈片用于配合軟件工程課程使用: 一個(gè)從業(yè)者的方法, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,積極的風(fēng)險(xiǎn)管理,進(jìn)行正規(guī)的風(fēng)險(xiǎn)分析 組織糾正風(fēng)險(xiǎn)的根本原因 TQM(全面質(zhì)量管理)的理念和統(tǒng)計(jì)SQA(關(guān)鍵過程域) 研究風(fēng)險(xiǎn)來源,超越軟件的界限謊言 提高能力來管理變革,9,These slides are designed to accompany Software E
10、ngineering: A Practitioners Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,Seven Principles,Maintain a global perspectiveview software risks within the context of system and the business problem Take a forward-looking viewthink about the risks that may arise in the future
11、; establish contingency plans Encourage open communicationif someone states a potential risk, dont discount it. Integratea consideration of risk must be integrated into the software process Emphasize a continuous processthe team must be vigilant throughout the software process, modifying identified
12、risks as more information is known and adding new ones as better insight is achieved. Develop a shared product visionif all stakeholders share the same vision of the software, it likely that better risk identification and assessment will occur. Encourage teamworkthe talents, skills and knowledge of
13、all stakeholder should be pooled,10,該幻燈片用于配合軟件工程課程使用: 一個(gè)從業(yè)者的方法, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,七項(xiàng)原則,保持一個(gè)全局的視角在系統(tǒng)和業(yè)務(wù)問題背景下考慮軟件的風(fēng)險(xiǎn) 采取前瞻性的觀點(diǎn)考慮在未來會(huì)出現(xiàn)的風(fēng)險(xiǎn); 建立應(yīng)急預(yù)案 鼓勵(lì)開放式的溝通交流重視別人提出的潛在風(fēng)險(xiǎn) 歸納整合對(duì)風(fēng)險(xiǎn)的考慮必須納入軟件開發(fā)過程 強(qiáng)調(diào)一個(gè)連續(xù)的過程應(yīng)在綜合考慮已知的信息和能夠預(yù)見的新增加的風(fēng)險(xiǎn)的情況下修改被確認(rèn)的風(fēng)險(xiǎn),在整個(gè)軟件開發(fā)過程中團(tuán)隊(duì)必須要對(duì)此保持警惕
14、制定一個(gè)共同的產(chǎn)品遠(yuǎn)景規(guī)劃如果所有的利益相關(guān)者對(duì)于軟件擁有同樣的遠(yuǎn)景規(guī)劃,將會(huì)有一個(gè)更好的風(fēng)險(xiǎn)識(shí)別和評(píng)估 鼓勵(lì)團(tuán)隊(duì)合作應(yīng)充分匯聚所有利益相關(guān)者的才智、技能和知識(shí),11,These slides are designed to accompany Software Engineering: A Practitioners Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,RISK,Risk Management Paradigm,control,identify,analyze,plan,trac
15、k,12,該幻燈片用于配合軟件工程課程使用: 一個(gè)從業(yè)者的方法, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,RISK,風(fēng)險(xiǎn)管理范例,控制,識(shí)別,分析,計(jì)劃,跟蹤k,13,These slides are designed to accompany Software Engineering: A Practitioners Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,Risk Identification
16、,Product sizerisks associated with the overall size of the software to be built or modified. Business impactrisks associated with constraints imposed by management or the marketplace. Customer characteristicsrisks associated with the sophistication of the customer and the developers ability to commu
17、nicate with the customer in a timely manner. Process definitionrisks associated with the degree to which the software process has been defined and is followed by the development organization. Development environmentrisks associated with the availability and quality of the tools to be used to build t
18、he product. Technology to be builtrisks associated with the complexity of the system to be built and the newness of the technology that is packaged by the system. Staff size and experiencerisks associated with the overall technical and project experience of the software engineers who will do the wor
19、k.,14,該幻燈片用于配合軟件工程課程使用: 一個(gè)從業(yè)者的方法, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,風(fēng)險(xiǎn)識(shí)別,產(chǎn)品規(guī)模風(fēng)險(xiǎn)與要建立或修改的軟件的整體規(guī)模有關(guān)系. 業(yè)務(wù)影響風(fēng)險(xiǎn)與強(qiáng)加在管理或市場(chǎng)的限制有關(guān)系. 客戶特點(diǎn)風(fēng)險(xiǎn)與客戶的成熟和開發(fā)人員及時(shí)與客戶溝通的能力有關(guān)系. 過程定義風(fēng)險(xiǎn)與軟件過程分析和開發(fā)部門遵循分析的程度有關(guān)系. 開發(fā)環(huán)境風(fēng)險(xiǎn)與被用來建立產(chǎn)品的工具的可用性和質(zhì)量有關(guān)系. 掌握的技能風(fēng)險(xiǎn)與要建立的系統(tǒng)的復(fù)雜性和用來封裝系統(tǒng)的“新穎”的技能有關(guān)系. 員工規(guī)模和經(jīng)驗(yàn)風(fēng)險(xiǎn)與要從事這項(xiàng)工作的
20、軟件工程師的整體技能和工程經(jīng)驗(yàn)有關(guān)系.,15,These slides are designed to accompany Software Engineering: A Practitioners Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,Assessing Project Risk-I,Have top software and customer managers formally committed to support the project? Are end-users ent
21、husiastically committed to the project and the system/product to be built? Are requirements fully understood by the software engineering team and their customers? Have customers been involved fully in the definition of requirements? Do end-users have realistic expectations?,16,該幻燈片用于配合軟件工程課程使用: 一個(gè)從業(yè)
22、者的方法, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman. t 2009 by Roger Pressman.,評(píng)估項(xiàng)目風(fēng)險(xiǎn)-I,高層的軟件和客戶經(jīng)理是否正式承諾支持該項(xiàng)目? 最終用戶是否積極致力于項(xiàng)目和系統(tǒng)/產(chǎn)品的興建? 客戶是否充分參與需求分析? 最終用戶是否有切合實(shí)際的期望?,17,These slides are designed to accompany Software Engineering: A Practitioners Approach, 7/e (McGraw-Hill 2009). Sli
23、des copyright 2009 by Roger Pressman.,Assessing Project Risk-II,Is project scope stable? Does the software engineering team have the right mix of skills? Are project requirements stable? Does the project team have experience with the technology to be implemented? Is the number of people on the proje
24、ct team adequate to do the job? Do all customer/user constituencies agree on the importance of the project and on the requirements for the system/product to be built?,18,該幻燈片用于配合軟件工程課程使用: 一個(gè)從業(yè)者的方法, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,評(píng)估項(xiàng)目風(fēng)險(xiǎn)-II,項(xiàng)目范圍是否確定? 軟件工程師是否有需要的綜合技能?
25、項(xiàng)目需求是否確定? 項(xiàng)目團(tuán)隊(duì)是否有實(shí)現(xiàn)這項(xiàng)技術(shù)的經(jīng)驗(yàn)? 完成這項(xiàng)工作的項(xiàng)目團(tuán)隊(duì)的人手是否充足? 所有的顧客/用戶群是否都同意項(xiàng)目的重要性和對(duì)要建立的系統(tǒng)/項(xiàng)目的需求分析?,19,These slides are designed to accompany Software Engineering: A Practitioners Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,Risk Components,performance riskthe degree of uncertainty t
26、hat the product will meet its requirements and be fit for its intended use. cost riskthe degree of uncertainty that the project budget will be maintained. support riskthe degree of uncertainty that the resultant software will be easy to correct, adapt, and enhance. schedule riskthe degree of uncerta
27、inty that the project schedule will be maintained and that the product will be delivered on time.,20,該幻燈片用于配合軟件工程課程使用: 一個(gè)從業(yè)者的方法, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,風(fēng)險(xiǎn)組成部分,履約風(fēng)險(xiǎn)產(chǎn)品滿足需求和符合預(yù)期用途的不確定性的程度. 成本風(fēng)險(xiǎn)需要保證的項(xiàng)目預(yù)算的不確定性的程度. 支持風(fēng)險(xiǎn)軟件易于更改、調(diào)整和提高的不確定性的程度. 進(jìn)度風(fēng)險(xiǎn)項(xiàng)目進(jìn)度保證和項(xiàng)目及時(shí)交付的不確定性的
28、程度.,21,These slides are designed to accompany Software Engineering: A Practitioners Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,Risk Projection,Risk projection, also called risk estimation, attempts to rate each risk in two ways the likelihood or probability that the r
29、isk is real the consequences of the problems associated with the risk, should it occur. The are four risk projection steps: establish a scale that reflects the perceived likelihood of a risk delineate the consequences of the risk estimate the impact of the risk on the project and the product, note t
30、he overall accuracy of the risk projection so that there will be no misunderstandings.,22,該幻燈片用于配合軟件工程課程使用: 一個(gè)從業(yè)者的方法, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,風(fēng)險(xiǎn)預(yù)測(cè),風(fēng)險(xiǎn)預(yù)測(cè), 也被稱作風(fēng)險(xiǎn)估計(jì), 試圖從兩個(gè)方面對(duì)風(fēng)險(xiǎn)進(jìn)行評(píng)分 風(fēng)險(xiǎn)存在的可能性和概率 風(fēng)險(xiǎn)導(dǎo)致的問題的后果. 風(fēng)險(xiǎn)預(yù)測(cè)的四個(gè)步驟: 建立能夠反映出可認(rèn)知的可能風(fēng)險(xiǎn) 劃定風(fēng)險(xiǎn)的后果 估計(jì)風(fēng)險(xiǎn)對(duì)項(xiàng)目和產(chǎn)品的影響 未避免誤區(qū),應(yīng)注
31、意風(fēng)險(xiǎn)預(yù)測(cè)的整體準(zhǔn)確性.,23,These slides are designed to accompany Software Engineering: A Practitioners Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,Building a Risk Table,Risk,Probability,Impact,RMMM,Risk Mitigation Monitoring & Management,24,該幻燈片用于配合軟件工程課程使用: 一個(gè)從業(yè)者的方法, 7/e (McGra
32、w-Hill 2009). Slides copyright 2009 by Roger Pressman.,建立風(fēng)險(xiǎn)表,風(fēng)險(xiǎn),概率,影響,風(fēng)險(xiǎn) 緩解 監(jiān)視 管理,25,These slides are designed to accompany Software Engineering: A Practitioners Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,Building the Risk Table,Estimate the probability of occurrence
33、Estimate the impact on the project on a scale of 1 to 5, where 1 = low impact on project success 5 = catastrophic impact on project success sort the table by probability and impact,26,該幻燈片用于配合軟件工程課程使用: 一個(gè)從業(yè)者的方法, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,構(gòu)建風(fēng)險(xiǎn)表,估計(jì)發(fā)生的概率 用1到5來估計(jì)對(duì)項(xiàng)
34、目的影響程度 1 = 對(duì)項(xiàng)目成功影響較小 5 = 對(duì)項(xiàng)目成功有災(zāi)難性的影響 通過概率和影響對(duì)表格排序,27,These slides are designed to accompany Software Engineering: A Practitioners Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,Risk Exposure (Impact),The overall risk exposure, RE, is determined using the following relati
35、onship Hal98: RE = P x C where P is the probability of occurrence for a risk, and C is the cost to the project should the risk occur.,28,該幻燈片用于配合軟件工程課程使用: 一個(gè)從業(yè)者的方法, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,風(fēng)險(xiǎn)暴露 (影響),整體的風(fēng)險(xiǎn)暴露, RE, 使用以下表達(dá)式 Hal98: RE = P x C where P代表風(fēng)險(xiǎn)出現(xiàn)的概率 C 代表
36、發(fā)生風(fēng)險(xiǎn)時(shí)產(chǎn)生的項(xiàng)目成本.,29,These slides are designed to accompany Software Engineering: A Practitioners Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,Risk Exposure Example,Risk identification. Only 70 percent of the software components scheduled for reuse will, in fact, be integra
37、ted into the application. The remaining functionality will have to be custom developed. Risk probability. 80% (likely). Risk impact. 60 reusable software components were planned. If only 70 percent can be used, 18 components would have to be developed from scratch (in addition to other custom softwa
38、re that has been scheduled for development). Since the average component is 100 LOC and local data indicate that the software engineering cost for each LOC is $14.00, the overall cost (impact) to develop the components would be 18 x 100 x 14 = $25,200. Risk exposure. RE = 0.80 x 25,200 $20,200.,30,該
39、幻燈片用于配合軟件工程課程使用: 一個(gè)從業(yè)者的方法, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,風(fēng)險(xiǎn)暴露舉例,風(fēng)險(xiǎn)識(shí)別. 實(shí)際上只有70%的計(jì)劃復(fù)用的軟件組件被集成到應(yīng)用程序. 其余的功能將不得不定制開發(fā). 風(fēng)險(xiǎn)概率. 80% (可能). 風(fēng)險(xiǎn)影響. 計(jì)劃60個(gè)可復(fù)用軟件組件. 如果只有70%可以使用,那么18個(gè)組件都將必須從頭開發(fā)(除了其他已計(jì)劃定制開發(fā)的軟件以外). 由于平均組件是100LOC,而且本地?cái)?shù)據(jù)顯示本項(xiàng)目的成本是每個(gè)LOC14美元,開發(fā)這些組件的全部成本(影響)將是25200美元(18 x
40、100 x 14 = $25,200). 風(fēng)險(xiǎn)曝光. RE = 0.80 x 25,200 $20,200.,31,These slides are designed to accompany Software Engineering: A Practitioners Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,mitigationhow can we avoid the risk? monitoringwhat factors can we track that will enable
41、us to determine if the risk is becoming more or less likely? managementwhat contingency plans do we have if the risk becomes a reality?,Risk Mitigation, Monitoring,and Management,32,該幻燈片用于配合軟件工程課程使用: 一個(gè)從業(yè)者的方法, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,緩解如何才能避免風(fēng)險(xiǎn)? 監(jiān)控跟蹤哪些因素可以是我們
42、判斷出風(fēng)險(xiǎn)是可能降低還是增加? 管理如果風(fēng)險(xiǎn)真的出現(xiàn),我們有什么應(yīng)對(duì)的措施?,風(fēng)險(xiǎn)緩解,監(jiān)控和管理,33,These slides are designed to accompany Software Engineering: A Practitioners Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,Risk Due to Product Size, estimated size of the product in LOC or FP?, estimated size of produc
43、t in number of programs,files, transactions?, percentage deviation in size of product from,average for previous products?, size of database created or used by the product?, number of users of the product?, number of projected changes to the requirements,for the product? before delivery? after delive
44、ry?, amount of reused software?,Attributes that affect risk:,34,該幻燈片用于配合軟件工程課程使用: 一個(gè)從業(yè)者的方法, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,產(chǎn)品規(guī)模引起的風(fēng)險(xiǎn), 估計(jì)產(chǎn)品的規(guī)模在LOC or FP?, 從方案、文件、交易的數(shù)量估計(jì)產(chǎn)品的規(guī)模?, 從之前產(chǎn)品的平均值估計(jì)產(chǎn)品規(guī)模的誤差百分比?, 產(chǎn)品創(chuàng)建或使用的數(shù)據(jù)庫的大小?, 產(chǎn)品的用戶數(shù)量?, 產(chǎn)品預(yù)期的需求變化的數(shù)量?交付前?交付后?, 軟件的復(fù)用量?,影響風(fēng)險(xiǎn)的屬性:
45、,35,These slides are designed to accompany Software Engineering: A Practitioners Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,Risk Due to Business Impact, affect of this product on company revenue?, visibility of this product by senior management?, reasonableness of del
46、ivery deadline?, number of customers who will use this product, interoperability constraints, sophistication of end users?, amount and quality of product documentation that,must be produced and delivered to the customer?, governmental constraints, costs associated with late delivery?, costs associat
47、ed with a defective product?,Attributes that affect risk:,36,該幻燈片用于配合軟件工程課程使用: 一個(gè)從業(yè)者的方法, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,業(yè)務(wù)影響引起的風(fēng)險(xiǎn), 產(chǎn)品對(duì)公司收入的影響?, 高層對(duì)產(chǎn)品的預(yù)期?, 合理的交貨期限?, 使用此產(chǎn)品的客戶數(shù)量?, 互用性的限制?, 最終用戶的熟練度?, 必須制作并交付客戶的產(chǎn)品文件的數(shù)量和質(zhì)量?, 政府限制?, 推遲交貨的費(fèi)用?, 由于產(chǎn)品缺陷造成的相關(guān)費(fèi)用?,影響風(fēng)險(xiǎn)的屬性:,37,T
48、hese slides are designed to accompany Software Engineering: A Practitioners Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,Risks Due to the Customer, Have you worked with the customer in the past?, Does the customer have a solid idea of requirements?, Has the customer agr
49、eed to spend time with you?, Is the customer willing to participate in reviews?, Is the customer technically sophisticated?, Is the customer willing to let your people do their,jobthat is, will the customer resist looking over your,shoulder during technically detailed work?, Does the customer unders
50、tand the software,engineering process?,Questions that must be answered:,38,該幻燈片用于配合軟件工程課程使用: 一個(gè)從業(yè)者的方法, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,用戶原因引起的風(fēng)險(xiǎn), 之前是否和用戶合作過?, 用戶對(duì)需求有一個(gè)固定的想法?, 用戶是否愿意花時(shí)間和你一起討論?, 客戶是否愿意參與評(píng)論?, 客戶的技術(shù)是否是熟練的?, 客戶是否愿意你的團(tuán)隊(duì)做這個(gè)項(xiàng)目也就是客戶是否 對(duì)技術(shù)細(xì)節(jié)工作不屑一顧?, 客戶是否了解軟件工程
51、過程?,必須解決的問題:,39,These slides are designed to accompany Software Engineering: A Practitioners Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,Risks Due to Process Maturity, Have you established a common process framework?, Is it followed by project teams?, Do you have manag
52、ement support for software engineering, Do you have a proactive approach to SQA?, Do you conduct formal technical reviews?, Are CASE tools used for analysis, design and,testing?, Are the tools integrated with one another?, Have document formats been established?,Questions that must be answered:,40,該
53、幻燈片用于配合軟件工程課程使用: 一個(gè)從業(yè)者的方法, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,工藝成熟度引起的風(fēng)險(xiǎn), 是否已建立了一個(gè)通用的過程框架?, 項(xiàng)目團(tuán)隊(duì)是否遵守它?, 軟件工程是否有管理方面的支持, 對(duì)SQA有一個(gè)積極地態(tài)度?, 是否進(jìn)行了正式的技術(shù)評(píng)審?, 是否用CASE工具進(jìn)行分析,設(shè)計(jì)和測(cè)試?, 工具是否與另一個(gè)集成?, 是否文件格式已確立?,必須解決的問題:,41,These slides are designed to accompany Software Engineering: A
54、 Practitioners Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,Technology Risks, Is the technology new to your organization?, Are new algorithms, I/O technology required?, Is new or unproven hardware involved?, Does the application interface with new software?, Is a specia
55、lized user interface required?, Is the application radically different?, Are you using new software engineering methods?, Are you using unconventional software development,methods, such as formal methods, AI-based approaches,artificial neural networks?, Are there significant performance constraints?
56、, Is there doubt the functionality requested is do-able?,Questions that must be answered:,42,該幻燈片用于配合軟件工程課程使用: 一個(gè)從業(yè)者的方法, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.,技術(shù)風(fēng)險(xiǎn), 這種技術(shù)對(duì)你的團(tuán)隊(duì)是否是新的?, 是否需要新的算法,I/O技術(shù)?, 是否有新的或未經(jīng)驗(yàn)證的硬件?, 是否有新的軟件程序接口?, 是否需要專門的用戶界面?, 是否應(yīng)用程序完全不同?, 是否使用了新的軟件工程方法?, 是否使用非傳統(tǒng)的軟件開發(fā)方法
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 積極心理學(xué)應(yīng)用:心理健康教育長(zhǎng)效機(jī)制構(gòu)建
- 利率市場(chǎng)化改革對(duì)中小企業(yè)融資效率的影響機(jī)制研究
- 2025年 重大安全事故
- 設(shè)計(jì)大跨橋梁健康監(jiān)測(cè)系統(tǒng)并優(yōu)化其性能
- 復(fù)工復(fù)產(chǎn)安全管理
- 強(qiáng)化安全生產(chǎn)教育
- 安全生產(chǎn)法自2002年11月1日起實(shí)施
- 觀看安全事故心得體會(huì)有感
- 民警開展消防安全檢查
- 化驗(yàn)室管理制度
- 手電筒產(chǎn)品課程設(shè)計(jì)報(bào)告書
- 《優(yōu)質(zhì)客戶服務(wù)技巧》
- TL4型彈性套柱銷聯(lián)軸器零件工藝規(guī)程及加工柱銷孔液動(dòng)夾具設(shè)計(jì)
- 05-衣之鏢-輔行訣湯液經(jīng)法用藥圖釋義
- LS/T 3240-2012湯圓用水磨白糯米粉
- GB/T 15298-1994電子設(shè)備用電位器第一部分:總規(guī)范
- 2023高中學(xué)業(yè)水平合格性考試歷史重點(diǎn)知識(shí)點(diǎn)歸納總結(jié)(復(fù)習(xí)必背)
- 自然指數(shù)NatureIndex(NI)收錄的68種自然科學(xué)類期刊
- 手術(shù)報(bào)告審批單
- 《專業(yè)導(dǎo)論光電信息科學(xué)與工程》教學(xué)大綱
- 少兒美術(shù)國畫- 少兒希望 《紫藤課件》
評(píng)論
0/150
提交評(píng)論