文檔簡(jiǎn)介
1、BALCO EXPANSION PROJECT -1200 MW THERMAL POWER PLANTCOMMISSIONING PROCEDURE印度BALCO擴(kuò)建4 x300 MW燃煤電站工程調(diào)試大綱 Aug. 2010 2011年5月Item No.: BALCO-COMM-GCP01Compiled by:編寫: 蘆正陽(yáng) Revised by:審核: 丁聯(lián)合 Approved by:批準(zhǔn): 目 錄1 前言PREFACE32工程概況PROJECT PROFILE33調(diào)試范圍及主要項(xiàng)目COMMISSIONING SCOPE AND ACTIVITIES43.1調(diào)試一般工作原則Princi
2、ples of commissioning43.2調(diào)試分階段任務(wù)簡(jiǎn)述 Description of activities in each stage of commissioning53.3分系統(tǒng)調(diào)試項(xiàng)目 Subsystem commissioning items73.4 整套啟動(dòng)試運(yùn)前應(yīng)具備條件Prerequisites to unit integrated trial run143.5整套啟動(dòng)試運(yùn)階段的調(diào)試項(xiàng)目Commissioning activities during integrated unit start-up and trial run stage214 啟動(dòng)調(diào)試組織機(jī)構(gòu)及職責(zé)
3、分工26COMMISSIONING ORGANIZATION AND ITS RESPONSIBILITIES264.1組織與職責(zé)organization and functional responsibility284.2 調(diào)試各方主要職責(zé)Functional responsibility of commissioning groups305 機(jī)組整套試運(yùn)行的程序和內(nèi)容33PROCEDURES FOR INITIAL TRIAL OPERATION OF THE OVERALL UNIT335.1 空負(fù)荷階段(此階段為純燒油)No-load operation phase (all-oil
4、firing)335.2帶負(fù)荷試運(yùn)行階段On-load trial operation phase365.3 14天可靠性運(yùn)行 14-day Reliability Operation406 調(diào)試進(jìn)度管理MANAGEMENT OF COMMISSIONING PROGRESS406.1調(diào)試進(jìn)度控制指標(biāo)Commissioning progress control indexes406.2調(diào)試工期的確定Schedule of commissioning activities416.3調(diào)試計(jì)劃Commissioning programme427調(diào)試安全管理SAFETY MANAGEMENT IN C
5、OMMISSIONING439 附錄 APPENDICES45附錄1:組織機(jī)構(gòu)及人員配置 Appendix 1: Organization of BALCO Project45附錄2:技術(shù)措施清單 Appendix2:List of technical procedures.49附錄3:調(diào)試流程圖 Appendix 3: commissioning sequence diagram.511 前言Preface調(diào)試大綱是機(jī)組啟動(dòng)調(diào)試階段綱領(lǐng)性文件,編制調(diào)試大綱的目的是為了在啟動(dòng)調(diào)試的各個(gè)階段把好安全質(zhì)量關(guān),移交給業(yè)主一個(gè)可靠、穩(wěn)定、經(jīng)濟(jì)滿發(fā)的投產(chǎn)機(jī)組,確保機(jī)組每一個(gè)試運(yùn)階段和主要調(diào)試項(xiàng)目均能達(dá)到
6、規(guī)定的優(yōu)良標(biāo)準(zhǔn)的要求,消除不合格項(xiàng),實(shí)現(xiàn)機(jī)組高水平投產(chǎn)。As a guide documentary for all stages of unit startup and commissioning, the procedure is focused on insurance of safety and quality in different commissioning stages, in which major commissioning items shall meet the requirements with defects eliminated, and thus handing
7、 over a unit to the Owner that is able to operate stably, efficiently and reliably.啟動(dòng)調(diào)試是火電基本建設(shè)工程的一個(gè)關(guān)鍵階段,設(shè)計(jì)、設(shè)備、安裝等方面可能存在的問(wèn)題將在此階段暴露出來(lái)并獲得解決;同時(shí),啟動(dòng)調(diào)試又是一個(gè)多單位協(xié)作的系統(tǒng)工程。因此,各參建單位應(yīng)當(dāng)在啟動(dòng)驗(yàn)收委員會(huì)(試運(yùn)指揮部)的統(tǒng)一領(lǐng)導(dǎo)和協(xié)調(diào)指揮下,團(tuán)結(jié)協(xié)作,安全、優(yōu)質(zhì)、高效地完成機(jī)組啟動(dòng)調(diào)試工作。本調(diào)試大綱是針對(duì)工程總體而編制的,適用于BALCO擴(kuò)建4300MW電站工程四臺(tái)機(jī)組的啟動(dòng)調(diào)試過(guò)程,調(diào)試單位及各參建單位必須遵守本調(diào)試大綱,若實(shí)施中需作必要的修
8、改時(shí),需經(jīng)試運(yùn)指揮部總指揮批準(zhǔn)。Unit startup and commissioning is a critical phase of coal-fired unit project. Latent and potential defects in design, manufacturing, and installation will be discovered and rectified in commissioning. Moreover, commissioning is also a system engineering involving multiple working pa
9、rties. Therefore, close cooperation between all the parties under the unified direction of the Commissioning Headquarters (CH) is essential for the unit to be commissioned on schedule, in good condition. The master guidelines is drafted based on the specific conditions of BALCO Expansion Project 430
10、0MW Thermal Power Plant. Commissioning team and other participating parties shall follow this master plan. Modifications or amendments if necessary shall be subject to the approval of the Commissioning Headquarters. 本調(diào)試大綱由試運(yùn)指揮部組織審查、批準(zhǔn)后生效。The master plan is subject to the review of the Commissioning
11、Headquarters before put into force. 2工程概況Project profile印度鋁業(yè)有限公司(以下簡(jiǎn)稱“BALCO”)計(jì)劃在Chattisgarh邦Korba鎮(zhèn)建設(shè)一座燃煤發(fā)電廠。Bharat Aluminum Company Limited(hereinafter refer to “BALCO”) planned to develop an Thermal Power Plant using pulverized coal as the main fuel in korba town in the state of Chattisgarh, India.
12、印度鋁業(yè)有限公司已建成4 臺(tái)135MW 機(jī)組作為自備電廠,本期建設(shè)4 臺(tái)300MW 亞臨界燃煤機(jī)組。Four units with 135MW capacity have been built as the Captive Power Plant and four coal fired subcritical units with 300MW capacity will be built at this phase.山東電力基本建設(shè)總公司(以下簡(jiǎn)稱“承包商”)于2007年8月20日獲得了項(xiàng)目EPC總承包合同,并將以EPC方式完成電站設(shè)計(jì)、采購(gòu)、供貨、運(yùn)輸、安裝、調(diào)試和性能驗(yàn)收試驗(yàn)工作。SEPC
13、O (hereinafter refer to “contractor”) got the contract at August,2007 and will be responsible for the design, procurement, supply, delivery, erection, commissioning and performance testing on EPC basis.3調(diào)試范圍及主要項(xiàng)目Commissioning scope and activities3.1調(diào)試一般工作原則Principles of commissioning3.1.1 主體調(diào)試單位的調(diào)總負(fù)
14、責(zé)本工程的調(diào)試總體協(xié)調(diào),調(diào)試進(jìn)度計(jì)劃編制,調(diào)試安全、質(zhì)量、進(jìn)度控制。The manager of Commissioning Team shall take the responsibility of overall coordination, preparation of test and trial run schedules, and supervision of commissioning quality and progress, and safety.3.1.2 自分部試運(yùn)開(kāi)始,任何輔機(jī)試運(yùn)必須在DCS上操作且相關(guān)保護(hù)系統(tǒng)投入,以確保輔機(jī)試運(yùn)的安全。From system tria
15、l operation, each auxiliary plant shall be operated on DCS with associated protections in service to ensure safety operation.3.1.3 機(jī)組調(diào)試過(guò)程中,所有保護(hù)、聯(lián)鎖完成試驗(yàn)后,必須進(jìn)行驗(yàn)收。On completion of testing of each protection/interlock item, all working parties shall confirm and accept the results. 3.1.4 每個(gè)系統(tǒng)試運(yùn)前必須進(jìn)行安全、質(zhì)量的
16、檢查驗(yàn)收,單機(jī)試運(yùn)不合格不得進(jìn)入分系統(tǒng)調(diào)試,分系統(tǒng)試運(yùn)不合格不得進(jìn)入整套調(diào)試,以確保機(jī)組調(diào)試質(zhì)量達(dá)到設(shè)計(jì)要求。Safety and quality inspection shall be conducted before each system is put into trial run. System trial run cannot be started if any component in the system has not passed individual testing. Similarly, overall unit startup cannot be commenced i
17、f any auxiliary system fails to pass trial operation. Only in this manner the unit can be commissioned successfully, fulfilling overall design requirements.3.1.5 分系統(tǒng)或整套試驗(yàn)前,各項(xiàng)基本條件必須滿足。All requirements specified in procedures shall be satisfied before trial operation of all subsystems and startup of o
18、verall unit.3.2調(diào)試分階段任務(wù)簡(jiǎn)述 Description of activities in each stage of commissioning3.2.1分系統(tǒng)調(diào)試任務(wù) Tasks in subsystem trial run分部試運(yùn)是電力建設(shè)施工的一個(gè)重要環(huán)節(jié),是對(duì)電力設(shè)備制造、設(shè)計(jì)、安裝質(zhì)量的動(dòng)態(tài)考核和檢驗(yàn),是機(jī)組能否順利進(jìn)行整套啟動(dòng)試運(yùn)和順利投產(chǎn)并迅速形成生產(chǎn)能力的關(guān)鍵工序。分系統(tǒng)調(diào)試工作作為分部試運(yùn)工作的組成部分,在本工程中的主要任務(wù)是:完成機(jī)組全部系統(tǒng)的試運(yùn)、DCS軟件恢復(fù)、廠用系統(tǒng)帶電、鍋爐冷態(tài)通風(fēng)試驗(yàn)、機(jī)組化學(xué)清洗、鍋爐點(diǎn)火吹管等工作。Subsystem tri
19、al operation are a crucial phase to power plant construction. They are intended to dynamically check and test all the pieces of equipment in the aspects of manufacturing, design and installation, thus ensuring the success of overall unit startup and commissioning. Individual system trial operation i
20、s part of the construction tests, and is intended to perform tasks such as trial operation of all systems, DCS software installation, auxiliary power system energizing, boiler cold draft test, chemical-cleaning, boiler light up and steam blowing. 3.2.2機(jī)組整套啟動(dòng)試運(yùn)前準(zhǔn)備工作 Preparations prior to integral uni
21、t startup本階段的主要任務(wù)是組織機(jī)組分系統(tǒng)調(diào)試后的缺陷封閉檢查、機(jī)組整套啟動(dòng)試運(yùn)計(jì)劃制定、機(jī)組整套啟動(dòng)試運(yùn)前質(zhì)量監(jiān)督檢查、機(jī)組整套啟動(dòng)試運(yùn)應(yīng)具備條件檢查確認(rèn)、召開(kāi)啟動(dòng)驗(yàn)收委員會(huì)會(huì)議、審議試運(yùn)指揮部有關(guān)機(jī)組整套啟動(dòng)準(zhǔn)備工作報(bào)告、協(xié)調(diào)整套啟動(dòng)的外部條件、決定機(jī)組整套啟動(dòng)的時(shí)間和相關(guān)事宜。Major tasks covered in this stage are:1) organizing to check all defects have been eliminated after subsystems trial run2) drafting of unit integral start
22、up commissioning schedule3) supervising of quality checking all preconditions are met for the unit to startup4) conference of the Overall Start-up Commissioning Committee is to be convened5) examination (scrutinizing) reports on preparations for overall unit startup 6) coordinating external conditio
23、ns for unit integral startup7) determining when the integral unit startup commences and other issues. 3.2.3機(jī)組空負(fù)荷試運(yùn)調(diào)試任務(wù) Commissioning tasks in no-load trial operation of the unit機(jī)組整套啟動(dòng)調(diào)試是機(jī)、電、爐、熱、化各專業(yè)聯(lián)合運(yùn)作的一個(gè)過(guò)程,也是對(duì)設(shè)計(jì)、制造、安裝、調(diào)試質(zhì)量的最終檢驗(yàn)。Integral unit startup and trial operation is a process of joint effort
24、 of turbine, boiler, electrical, chemical and I&C teams. It is a final comprehensive test the quality for design, manufacturing, erection and commissioning.機(jī)組空負(fù)荷調(diào)試階段的主要任務(wù)是完成鍋爐冷、熱態(tài)沖洗,機(jī)組初次冷態(tài)啟動(dòng)與試驗(yàn)、機(jī)組并網(wǎng)前電氣試驗(yàn)、汽輪機(jī)超速試驗(yàn)、鍋爐蒸汽嚴(yán)密性試驗(yàn)及安全門校驗(yàn)、汽機(jī)主汽門、調(diào)門嚴(yán)密性試驗(yàn)等。Major tasks to be completed in this stage are:1) cold and
25、 hot flushing of boiler;2) initial cold unit startup and tests;3) electrical tests prior to generator synchronization;4) turbine overspeed tests,5) boiler steam tightness test and safety valves setting;6) turbine MSVs and CVs tightness test.3.2.4機(jī)組帶負(fù)荷試運(yùn)調(diào)試任務(wù) Tasks in on-load trial run of unit 機(jī)組帶負(fù)荷試驗(yàn)
26、的目的,在于通過(guò)各項(xiàng)試驗(yàn),考驗(yàn)機(jī)組額定工況下,穩(wěn)定運(yùn)行的能力,并通過(guò)優(yōu)化組合運(yùn)行參數(shù)和燃燒初調(diào)整等各項(xiàng)調(diào)整試驗(yàn),使機(jī)組具備一個(gè)較經(jīng)濟(jì)、穩(wěn)定的運(yùn)行工況。In this stage, various tests are performed to examine whether the unit is able to run stably under the rated conditions, and through optimization of operational parameters and adjustment, to determine a stable and efficient o
27、perational condition for the unit.機(jī)組帶負(fù)荷調(diào)試的主要任務(wù)是發(fā)現(xiàn)和解決設(shè)備和系統(tǒng)動(dòng)態(tài)運(yùn)轉(zhuǎn)過(guò)程中的問(wèn)題,消除由于各種原因造成的設(shè)備和系統(tǒng)缺陷,使所有設(shè)備、系統(tǒng)達(dá)到設(shè)計(jì)的額定工況和出力,進(jìn)行制粉系統(tǒng)調(diào)整試驗(yàn)、鍋爐燃燒初調(diào)整試驗(yàn)、低負(fù)荷斷油試驗(yàn)、SCS設(shè)備及程控投用試驗(yàn)、MCS 熱控自動(dòng)裝置投用試驗(yàn)、MCS 協(xié)調(diào)控制負(fù)荷變動(dòng)試驗(yàn)、廠用電切換試驗(yàn)、真空嚴(yán)密性試驗(yàn)、甩負(fù)荷試驗(yàn)、RUNBACK試驗(yàn)等。The purpose of on-load testing and adjustment of the unit is to discover and solve any
28、potential defects and/or difficulties and to make the systems and equipment to attain design conditions and output. In this stage, some testing and adjustment shall be conducted as follows: 1) adjustment for coal pulverizing system;2) initial adjustment for boiler combustion;3) oil cut-off on low lo
29、ad4) SCS initial operation5) MCS initial operation6) load change test in CCS mode7) changeover of auxiliary power source8) vacuum tightness test9) load rejection test10) Runback of unit3.2.5機(jī)組滿負(fù)荷試運(yùn)調(diào)試任務(wù)Full-load trial run of unit機(jī)組滿負(fù)荷整套試運(yùn)主要任務(wù)是機(jī)組再次啟動(dòng)并網(wǎng)后逐漸投入所有系統(tǒng)、熱工儀表、保護(hù)、自動(dòng)等。當(dāng)鍋爐投電除塵、斷油、吹灰系統(tǒng)投用正常,汽機(jī)投高加,熱控
30、儀表正常投入、汽水品質(zhì)合格、機(jī)組負(fù)荷300MW 時(shí),進(jìn)入14天可靠性運(yùn)行。In full-load trial operation, the unit is restarted and brought into parallel operation with the power grid, with all the systems, I&C, protections, automatic controllers and others put into operation in succession. When ESP and soot-blowers are working steadily,
31、 oil cut-off succeeds, HP feed heaters were put in and most I&C are working normally, water and steam measure up to the standards, and the unit is running at 300MW steadily, the 14-day reliability operation will begin.3.2.6機(jī)組14天可靠性運(yùn)行14-day Reliability Operation完成機(jī)組帶負(fù)荷試運(yùn)后,如果需要停機(jī)檢修,則停機(jī)檢修完成后。再次啟動(dòng)機(jī)組使機(jī)組負(fù)
32、荷達(dá)到300MW ; 投入機(jī)組的連鎖保護(hù)和儀表;投入機(jī)組的自動(dòng)控制系統(tǒng)。使機(jī)組完成14天的可靠性運(yùn)行。After completion of unit on-load trial operation, the unit will be shut down for defects repair if necessary, then restarted and loaded up to 300MW, with the protections, interlocks, instruments, and automatic control systems put in service. The uni
33、t should stand the 14-day on-load operation for reliability. 3.3分系統(tǒng)調(diào)試項(xiàng)目 Subsystem commissioning items機(jī)組分系統(tǒng)調(diào)試項(xiàng)目的內(nèi)容依據(jù)本工程調(diào)試合同而定。All activities shall be carried out in accordance with the Project Commissioning Contract.3.3.1鍋爐專業(yè)調(diào)試工作 Boiler commissioning activities3.3.1.1 對(duì)機(jī)組鍋爐范圍內(nèi)的主要設(shè)備及系統(tǒng)進(jìn)行檢查。Inspection
34、of boiler plants and its auxiliary systems 3.3.1.2 組織檢查各汽水電動(dòng)門、煙風(fēng)調(diào)節(jié)檔板及隔絕門檔板。Joint checkup of steam/water MOVs, regulating and isolating dampers on flue gas ducts.3.3.1.3 輔機(jī)聯(lián)鎖、保護(hù)檢查試驗(yàn)。Testing of interlocks and protections of each auxiliary plant.3.3.1.4 空壓機(jī)系統(tǒng)調(diào)試Trial run of air compressor system.3.3.1.5
35、 風(fēng)機(jī)系統(tǒng)調(diào)試。Testing of air draft fans.3.3.1.6 空預(yù)器系統(tǒng)調(diào)試。Trial run of air preheater system.3.3.1.7 鍋爐冷態(tài)通風(fēng)試驗(yàn)。Cold draft testing of furnace.3.3.1.8 燃燒器動(dòng)作試驗(yàn)和同步性檢查試驗(yàn)。Burners actions test and their simultaneity checkout.3.3.1.9 燃油系統(tǒng)、爐前點(diǎn)火油系統(tǒng)調(diào)試及燃油泄漏試驗(yàn)。Trial run of fuel oil system, light up oil system and fuel oil
36、 leakage test.3.3.1.10 制粉系統(tǒng)調(diào)試。Trial run of coal pulverizing system.3.3.1.11 FSSS系統(tǒng)聯(lián)鎖保護(hù)模擬試驗(yàn)。Simulation test of interlocks and protections of FSSS system.3.3.1.12 密封風(fēng)、冷卻風(fēng)系統(tǒng)調(diào)試。Trial run of sealing and cooling air system.3.3.1.13 輔助蒸汽供汽系統(tǒng)調(diào)試。Trial run of auxiliary steam supply system.3.3.1.14 鍋爐汽、水系統(tǒng)檢查。I
37、nspection of boiler water and steam system.3.3.1.15 鍋爐疏水排污系統(tǒng)調(diào)試。Trial run of boiler drain and blowdown system.3.3.1.16 鍋爐膨脹系統(tǒng)檢查。Inspection of boiler thermal expansion.3.3.1.17 吹灰系統(tǒng)調(diào)試。Trial run of soot blowing.3.3.1.18 除灰除渣系統(tǒng)調(diào)試。Trial run of ash and slag handling system.3.3.1.19 輸煤系統(tǒng)調(diào)試。Initial operatio
38、n of coal handling System3.3.1.20 鍋爐化學(xué)清洗和沖洗工作。Carrying out chemical cleaning and water flushing for boiler.3.3.1.21 鍋爐減溫水管道系統(tǒng)沖洗。Completing pipes blowing and flushing for boiler desuperheating water system.3.3.1.22 鍋爐蒸汽管路吹管調(diào)試。Completing boiler steam blowing.3.3.1.23 鍋爐安全門校驗(yàn),包含PCV閥試驗(yàn)。Associating manuf
39、acturer in setting of safety valves,including pressure control valves (PCV)。3.3.1.24 鍋爐工作壓力水壓試驗(yàn)。Completing hydrostatic testing for boiler at rated pressure.3.3.1.25 配合冷卻水系統(tǒng)、取樣加藥及排污等系統(tǒng)的試運(yùn)工作。Associating in trial run of cooling water system, dosing and sampling system and blowdown system etc.3.3.1.26 配
40、合除塵器試驗(yàn)。Associating in ESP testing.3.3.1.27 機(jī)、爐、電大聯(lián)鎖試驗(yàn)。BTG testing.3.3.2汽機(jī)專業(yè)調(diào)試工作 Responsibility of Turbine Team3.3.2.1 對(duì)機(jī)組汽機(jī)范圍內(nèi)的主要設(shè)備及系統(tǒng)進(jìn)行檢查。Inspection of major plants and systems in turbine house3.3.2.2 組織安全門校驗(yàn)及檢查調(diào)節(jié)門、抽汽逆止門、電動(dòng)門。Organizing to check all CVs, steam extraction check valves and MOVs and ca
41、librate safety valves3.3.2.3 輔機(jī)聯(lián)鎖、保護(hù)檢查試驗(yàn)。Inspection of interlocks and protections of auxiliary plants3.3.2.4 循環(huán)水系統(tǒng)試運(yùn)行。Initial operation of C.W. system3.3.2.5 開(kāi)式循環(huán)冷卻水系統(tǒng)調(diào)試。Trial run of OCCW system3.3.2.6 閉式循環(huán)冷卻水系統(tǒng)調(diào)試。Trial run of CCCW system3.3.2.7 真空系統(tǒng)調(diào)試。Trial run of condenser air evacuation system3.3
42、.2.8 輔助蒸汽系統(tǒng)調(diào)試。Trial run of auxiliary steam system3.3.2.9 輔助蒸汽管路吹掃。Steam blowing of auxiliary steam pipelines3.3.2.10 凝結(jié)水及凝結(jié)水補(bǔ)給水系統(tǒng)調(diào)試。Trial run of condensate and water makeup system3.3.2.11 除氧器及高壓給水系統(tǒng)調(diào)試。Trial run of deaerator and HP feed heater system3.3.2.12 電動(dòng)、汽動(dòng)給水泵調(diào)試。Trial run of MBFP and steam-dri
43、ven BFPs3.3.2.13 低壓給水系統(tǒng)調(diào)試。Trial run of LP feed heater system3.3.2.14 抽汽加熱器及疏水系統(tǒng)調(diào)試。Trial run of steam extraction heater and drain system3.3.2.15 軸封供汽系統(tǒng)調(diào)試。Trial run of gland steam system3.3.2.16 汽輪機(jī)潤(rùn)滑油及盤車、頂軸油系統(tǒng)調(diào)試。Trial run of turbine lube oil, TG and jacking oil system3.3.2.17 汽輪機(jī)油凈化裝置調(diào)試。Trial run of
44、turbine lube oil purification system3.3.2.18 發(fā)電機(jī)冷卻水、氫及密封油系統(tǒng)調(diào)試。Trial run of generator stator cooling water, hydrogen and sealing oil systems3.3.2.19 汽輪機(jī)調(diào)節(jié)系統(tǒng)靜態(tài)調(diào)試。Static test of turbine governing system3.3.2.20 DEH系統(tǒng)靜態(tài)調(diào)試。Static test of DEH (digital electro-hydraulic control system)3.3.2.21 汽輪機(jī)汽門關(guān)閉時(shí)間測(cè)試。
45、Testing of duration of turbine MSVs and CVs closing3.3.2.22 汽機(jī)旁路系統(tǒng)調(diào)試。Commissioning of BPS3.3.2.23 低壓缸噴水冷卻系統(tǒng)調(diào)試。Test of spraying cooling system of low pressure cylinder3.3.2.24 膠球清洗設(shè)備系統(tǒng)調(diào)試。Test of rubber ball cleaning plant3.3.2.25 配合化學(xué)清洗。Associating in chemical cleaning3.3.2.26 配合鍋爐蒸汽管路吹管調(diào)試。Associatin
46、g in boiler blowing3.3.2.27 機(jī)、爐、電大聯(lián)鎖試驗(yàn)。BTG testing3.3.3電氣專業(yè)調(diào)試工作 Responsibility of Electric Team3.3.3.1 220KV升壓站及廠用電源系統(tǒng)帶電。Energizing of 220 kV switchyard and station auxiliary power systems3.3.3.2 發(fā)電機(jī)變壓器組的保護(hù)系統(tǒng)調(diào)試。Trial run of protection system of generator-transformer unit3.3.3.3 主變壓器冷卻控制系統(tǒng)調(diào)試。Trial ru
47、n of cooling control system of generator transformer.3.3.3.4 發(fā)電機(jī)、變壓器、廠用變壓器的控制信號(hào)、保護(hù)的傳動(dòng)試驗(yàn)。Testing of transmission for control singles and protections of generator-transformer unit and unit auxiliary transformer.3.3.3.5 發(fā)電機(jī)勵(lì)磁系統(tǒng)的調(diào)試。Testing of generator excitation system3.3.3.6 發(fā)電機(jī)同期系統(tǒng)調(diào)試。Testing of gener
48、ator synchronization system3.3.3.7 直流系統(tǒng)調(diào)試。Testing of DC power supply system3.3.3.8 保安電源系統(tǒng)調(diào)試及試運(yùn)。(包括柴油發(fā)電機(jī))Trial run and operation of emergency power supply (DG)3.3.3.9 廠用電切換系統(tǒng)調(diào)試。Testing of changeover of auxiliary power supply3.3.3.10 不停電電源系統(tǒng)調(diào)試。Trial run of uninterrupted power supply (UPS) system3.3.3.
49、11 故障錄波系統(tǒng)調(diào)試。Trial run of fault waveform recording system3.3.3.12 微機(jī)監(jiān)控系統(tǒng)(ECS)調(diào)試。Testing of ECS3.3.3.13 機(jī)、爐、電大聯(lián)鎖試驗(yàn)。Testing of BTG interlocks3.3.4 熱控專業(yè)調(diào)試工作 Responsibility of I&C Team3.3.4.1 檢查測(cè)量元件、取樣裝置的安裝情況、儀表管路嚴(yán)密性試驗(yàn)記錄以 及變送器、邏輯開(kāi)關(guān)等校驗(yàn)記錄。Inspection of measuring and sampling devices, examination of instrum
50、ent tube tightness test data and transmitter/switch calibration data.3.3.4.2 檢查執(zhí)行機(jī)構(gòu)的安裝情況及遠(yuǎn)方遙控操作試驗(yàn)。Inspection of actuator installation and testing of remote operation of each actuator.3.3.4.3 分散控制系統(tǒng)(DCS)的受電和軟件調(diào)試。Energizing of DCS (distributed control system) and software debugging3.3.4.4 計(jì)算機(jī)系統(tǒng)硬件檢查和I/
51、O通道檢查。Inspection of hardware, including and I/O channels, of the computer system3.3.4.5 輔網(wǎng)系統(tǒng)(BOP)調(diào)試。Trial run of Balance Of Plant(BOP)3.3.4.6 鍋爐爐膛安全監(jiān)控系統(tǒng)(FSSS)調(diào)試。Trial run of furnace safeguard supervisory system (FSSS)3.3.4.7 機(jī)組數(shù)據(jù)采集系統(tǒng)(DAS)調(diào)試。Trial run of data acquisition system (DAS)3.3.4.8 機(jī)組事故記錄系統(tǒng)(
52、SOE)調(diào)試。Trial run of sequence of events record system (SOE)3.3.4.9 機(jī)組模擬量調(diào)節(jié)系統(tǒng)(MCS)調(diào)試。Trial run of modulating control system(MCS)3.3.4.10 協(xié)調(diào)控制系統(tǒng)調(diào)試(CCS)Test of coordinated control system (CCS)3.3.4.11 順序控制系統(tǒng)(SCS)調(diào)試。Trial run of sequence control systems (SCS)3.3.4.12 汽機(jī)數(shù)字電液控制系統(tǒng)(DEH)調(diào)試。Trial run of turbin
53、e digital electro-hydraulic control system (DEH)3.3.4.13 汽機(jī)旁路控制系統(tǒng)(BPC)調(diào)試。Trial run of turbine bypassing control system (BPS)3.3.4.14 汽機(jī)監(jiān)視(TSI)、保護(hù)系統(tǒng)(ETS)調(diào)試。Trial run of turbine supervisory instrument (TSI) and emergency trip system (ETS)3.3.4.15 汽動(dòng)給水泵控制系統(tǒng)調(diào)試。Testing of steam-driven BFP control system3
54、.3.4.16 給煤機(jī)控制系統(tǒng)調(diào)試。Testing of coal feeder control system3.3.4.17 鍋爐保護(hù)聯(lián)鎖系統(tǒng)調(diào)試。Testing of boiler interlocks and protections3.3.4.18 汽機(jī)保護(hù)聯(lián)鎖系統(tǒng)調(diào)試。Testing of turbine interlocks and protections3.3.4.19 鍋爐吹灰順控系統(tǒng)調(diào)試。Trial run of SCS of boiler soot blowing system3.3.4.20 空預(yù)器控制系統(tǒng)調(diào)試。Trial run of APH control system
55、3.3.4.21 除灰順控系統(tǒng)調(diào)試。Trial run of ash handling system3.3.4.22 除渣順控系統(tǒng)調(diào)試。Trial run of slag handling system3.3.4.23 凝結(jié)水精處理順控系統(tǒng)調(diào)試。Trial run of sequence control system for condensate polishing plant3.3.4.24 給水、爐水加藥控制系統(tǒng)調(diào)試。Trial run of dosing control system of feedwater and boiler water 3.3.4.25 發(fā)電機(jī)氫油水控制系統(tǒng)調(diào)試。
56、Generator hydrogen-oil-water control system commissioning3.3.4.26 配合輔機(jī)試轉(zhuǎn)及熱力系統(tǒng)調(diào)試。Assist in trial run of auxiliary equipment and thermal systems3.3.4.27 其它輔助車間控制系統(tǒng)調(diào)試。Commissioning of other auxiliary plant control systems3.3.4.28 機(jī)、電、爐大聯(lián)鎖試驗(yàn)。BTG interlock testing3.3.5化學(xué)專業(yè)調(diào)試工作Commissioning of chemical sp
57、ecialty3.3.5.1 循環(huán)水加藥系統(tǒng)調(diào)試Trial run of C.W.chemical dosing system3.3.5.2 化學(xué)水處理系統(tǒng)調(diào)試 Trial run of chemical water treatment system3.3.5.3 凝結(jié)水精處理系統(tǒng)調(diào)試。Trial run of condensate water polishing system3.3.5.4 鍋爐補(bǔ)給水系統(tǒng)調(diào)試。Trial run of boiler make-up water system3.3.5.5 發(fā)電機(jī)冷卻水處理系統(tǒng)調(diào)試。Trial run of generator cooling water treating system3.3.5.6 加藥系統(tǒng)調(diào)試
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 小學(xué)語(yǔ)文經(jīng)典美文千山筆記
- 2024二手房購(gòu)房定金合同范本二手房購(gòu)房合同范本
- 2024賒欠買賣貨物合同樣書
- 2024裝飾維修合同范本
- 2024《電大合同法網(wǎng)考》
- 2024理財(cái)合同可信范文
- 深圳大學(xué)《中國(guó)音樂(lè)史(中國(guó)流行音樂(lè)史)》2021-2022學(xué)年第一學(xué)期期末試卷
- 深圳大學(xué)《醫(yī)學(xué)統(tǒng)計(jì)學(xué)》2021-2022學(xué)年第一學(xué)期期末試卷
- 殯葬用品銷售合同(2篇)
- 騎車轉(zhuǎn)讓買賣協(xié)議書(2篇)
- 中藥項(xiàng)目投資合同范例
- 2024-2025學(xué)年上海市普陀區(qū)八年級(jí)(上)期中數(shù)學(xué)試卷
- 假期補(bǔ)課協(xié)議書
- 電子商務(wù)支付結(jié)算系統(tǒng)開(kāi)發(fā)合同
- 服務(wù)質(zhì)量、保證措施
- (必練)廣東省軍隊(duì)文職(經(jīng)濟(jì)學(xué))近年考試真題試題庫(kù)(含答案)
- 含羞草天氣課件
- 2024年安全生產(chǎn)知識(shí)競(jìng)賽考試題庫(kù)及答案(共五套)
- 22《鳥的天堂》課件
- 農(nóng)業(yè)灌溉裝置市場(chǎng)環(huán)境與對(duì)策分析
- 新疆烏魯木齊市第十一中學(xué)2024-2025學(xué)年八年級(jí)上學(xué)期期中道德與法治試卷
評(píng)論
0/150
提交評(píng)論