![水手英語聽力試卷試題B_第1頁](http://file3.renrendoc.com/fileroot_temp3/2022-4/25/c23a85b2-cb2e-4bf4-996e-9af78d059699/c23a85b2-cb2e-4bf4-996e-9af78d0596991.gif)
![水手英語聽力試卷試題B_第2頁](http://file3.renrendoc.com/fileroot_temp3/2022-4/25/c23a85b2-cb2e-4bf4-996e-9af78d059699/c23a85b2-cb2e-4bf4-996e-9af78d0596992.gif)
![水手英語聽力試卷試題B_第3頁](http://file3.renrendoc.com/fileroot_temp3/2022-4/25/c23a85b2-cb2e-4bf4-996e-9af78d059699/c23a85b2-cb2e-4bf4-996e-9af78d0596993.gif)
![水手英語聽力試卷試題B_第4頁](http://file3.renrendoc.com/fileroot_temp3/2022-4/25/c23a85b2-cb2e-4bf4-996e-9af78d059699/c23a85b2-cb2e-4bf4-996e-9af78d0596994.gif)
![水手英語聽力試卷試題B_第5頁](http://file3.renrendoc.com/fileroot_temp3/2022-4/25/c23a85b2-cb2e-4bf4-996e-9af78d059699/c23a85b2-cb2e-4bf4-996e-9af78d0596995.gif)
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、水手英語聽力試卷(B)I. Listen to the following sentences and choose the best one: (10×2.5)1. A. The A.B. is singing now.B. The A.B. is watching the TV now.C. The A.B. is painting now.D. The A.B. is repairing some equipment.2. A. Officer of safetyB. Ordinary SeamanC. On the shipD. Oily system3. A. The ru
2、dder should be in a fore and aft position.B. The rudder should be held fully over to port.C. The rudder should be held starboard.D. The rudder should be held to avoid allowing the vessels head in a turn.4. A. It is ordered to cast off forward head line. B. It is ordered to cast off head line.C. It i
3、s ordered to heave tight forward head line.D. It is ordered to heave tight forward head line.5. Welcome to _ our ship, Mr. Pilot.A. boardB. aboardC. vesselD. sail6. _, ensure the safety of operation. A. In the wayB. By wayC. By the wayD. in way7. A. Everything is ready for loading.B. Everything is r
4、eady for unloading.C. we are not ready for loading yet.D. We are not ready for unloading yet.8. A. Its impossible for us to do the repairs according to your requirements.B. Its hard for us to do the repairs according to your requirements.C. Its difficulty for us to plan the repairs when you are abse
5、nt.D. Its important for us to plan the repairs as you do.9. A. My draft forward is 12 meters.B. My draft aft is 13 meters.C. My maximum draft is 13 meters.D. My draft in summer is 12 meters.10. A. Ship Security PlanB. Ship Security Alert SystemC. Ship Security OfficerD. Company Security OfficerII. L
6、isten to the following dialogue and answer the questions: (10×2.5)1. Q: Where does this conversation take place _.A. At the hotelB. At the restaurantC. At the airportD. At the stadium2. Q: Who is cleaning the deck?A. BosunB. A.B.C. O.S.D. Carpenter3. Q: How is the steering _.A. Answer all right
7、B. Answer too slowC. No answerD. Very slow4. Q: Which statement is true _.A. Forward spring is made fastB. Forward breast line is made fastC. All breast line is made fastD. All spring is made fast5. Q: Who is the second speaker _.A. CaptainB. The formanC. The customs officerD. The agent6. Q: Whats t
8、he present state of the holds _.A. Free of smellB. Free of dirtC. Still smellingD. Still wet7. Q: What is the loading capacity on deck _.A. 1,500 trailersB. 1,500 cubic metersC. 1,500 TEUsD. 1,500 forty foot containers8. Q: What does the second speaker mean _.A. It should be repairedB. It should be
9、renewedC. It should be weldedD. It should be adjusted9. Q: What is the visibility _.A. 2 sea milesB. 3 sea milesC. 2 kmD. 3 km10. Q: What equipment are they talking about _.A. Navigation equipmentB. Firefighting equipmentC. Ship Security Alert SystemD. Lifesaving equipmentIII. Listen to the followin
10、g passage and answer the questions: (8×3)Passage 1Q1: What is the course ordered _ A. Course one two eight degrees B. Course one eight two degrees C. Course two one eight degrees D. Course two eight one degreesQ2: What is the correct report to “Starboard five” _ A. Starboard five B. Starboard i
11、s five C. Wheel is starboard five D. Starboard five is wheelQ3: How to correctly reply the order “keep the red pillar buoy on port side” _ A. keep the port side buoy on the red pillar B. keep on port side the red pillar buoy C. the red pillar buoy kept on port side D. keep the red pillar buoy on por
12、t sideQ4: which of the following orders is mentioned in the dialogue _ A. Steady on this course B. Steady as she goes C. Starboard 5 D. Nothing to portPassage 2Q1: Who is in command of fire fighting team NO. 1?ACaptainBChief OfficerCChief EngineerDSecond EngineerQ2: What shall be connected between e
13、ach team member?Aprotective clothingBsmoke helmetsCbreathing apparatusDlifelineQ3: Which team shall be on stand by?AFirst aid teamBSupport teamCRescue teamDDamage control teamQ4: How long will the fire fighting action last?A30 minutesB25 minutesC20 minutesD15 minutesIV. Look at the picture and choos
14、e the best: (13×2)1. What does the picture show?A. Muster stationB. fire stationC. Emergency exitD. Direction indicator2. What does the picture show? A. Life raftB. Life boatC. Life buoyD. Rescue boat3. What does the picture show?A. Life buoy with lineB. Life buoy with lightC. Life buoy with sm
15、okeD. Life buoy with light and smoke4. What does the picture show?A: EPIRBB: radar transponderC: portable radioD: line-throwing apparatus5. What does the picture show?A. childs lifejacketB. crews lifejacketC. evacuation slideD. rocket parachute flare6. What does the picture show?A. emergency ladderB
16、. evacuation ladderC. pilot ladderD. gangway7. What does the picture show?Aanchor.BAutopilot.CBitts.DBunk.8. What does the picture show?Aanchor.BBunk.CBitts.DAutopilot.9. What does the picture show?Atelescope.Bsextant.Cchronometer.Dgyro compass10. What does the picture show?Aanchor.Bwindlass.Canchor chain.Ds
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年刮墨刀項目效益評估報告
- 辦公用地申請書
- DB2201-T 52-2023 枝角類室內(nèi)高密度培養(yǎng)技術(shù)規(guī)范
- 一建《建設(shè)工程項目管理》試題庫資料練習(xí)含【答案】卷32
- 知識產(chǎn)權(quán)在醫(yī)療科技創(chuàng)新中的保障作用
- 校園綠化與生態(tài)教育的融合創(chuàng)新
- 電子商務(wù)平臺數(shù)據(jù)監(jiān)測全解析
- 電機控制技術(shù)在航空航天領(lǐng)域的商業(yè)價值
- Module2練習(xí)(單元測試)-英語三年級下冊-外研版(一起)(含答案)
- 中國銀行(香港)有限公司招聘筆試真題2023
- 15萬噸水廠安裝工程施工組織設(shè)計方案
- 超級蘆竹種植項目可行性研究報告-具有高經(jīng)濟價值和廣泛應(yīng)用前景
- 自動體外除顫器項目創(chuàng)業(yè)計劃書
- 養(yǎng)老機構(gòu)績效考核及獎勵制度
- 2024年越南煤礦設(shè)備再制造行業(yè)現(xiàn)狀及前景分析2024-2030
- 長塘水庫工程環(huán)評報告書
- 病案管理質(zhì)量控制指標(biāo)檢查要點
- DL-T5001-2014火力發(fā)電廠工程測量技術(shù)規(guī)程
- 平行四邊形的判定(27張)-完整課件
- 居民住宅小區(qū)電力配置規(guī)范
評論
0/150
提交評論